🛠️

Changelog

The public history of the atlas: the permanent per-entity revision record, then the weekly record of what was published, changed or held back.

The atlas today: 1216 published projects · 265 cities · 130 countries · 1203 permanent entity revisions

Research and summaries are AI-assisted. The Evidence-file layer makes its own status explicit: the first baselines are structurally validated but unreviewed, with claims, source dossiers, missing fields and hashes open to inspection. See the Evidence Constitution.

Append-only record

Entity revisions

1203 revisions · 509 of them a change to an entry already in the record.

Every row resolves to an immutable snapshot. Corrections append a revision; they never replace the old permalink. The same revision model accepts projects, cities, countries, glossary terms and topics. The label on each row is computed by comparing the snapshot with the one before it — it is not a note somebody typed. Follow this record by RSS → To follow a single record instead, every project and city page carries its own scoped feed (the “Follow changes” link at the foot of the page).

  1. project Entered the record Budżet Obywatelski: Warsaw's Participatory Budget, Voted Online

    Created the first structured Evidence Passport with 24 claims and 11 source dossiers.

    unreviewed history →
  2. project Entered the record Veolia's Remote-Controlled District Heating Network in Warsaw

    Created the first structured Evidence Passport with 26 claims and 14 source dossiers.

    unreviewed history →
  3. project Entered the record Warsaw's Low-Cost Air Sensor Network and Municipal Smog Alerts

    Created the first structured Evidence Passport with 23 claims and 10 source dossiers.

    unreviewed history →
  4. project Entered the record Warsaw's Open Data API: Live Bus and Tram Positions Behind an API Key

    Created the first structured Evidence Passport with 17 claims and 8 source dossiers.

    unreviewed history →
  5. project Entered the record Warsaw's Integrated Traffic Management System (ZSZR)

    Created the first structured Evidence Passport with 27 claims and 13 source dossiers.

    unreviewed history →
  6. project Entered the record Warszawa 19115: Warsaw's Single Contact Centre for Reports and Questions

    Created the first structured Evidence Passport with 23 claims and 7 source dossiers.

    unreviewed history →
Show 1197 more revisionsShow fewer
  1. project Entered the record Veturilo: Warsaw's GPS-Tracked Public Bike-Share

    Created the first structured Evidence Passport with 26 claims and 10 source dossiers.

    unreviewed history →
  2. project Entered the record Warsaw's Clean Transport Zone and Its Plate-Reading Patrols

    Created the first structured Evidence Passport with 23 claims and 14 source dossiers.

    unreviewed history →
  3. project Operator changed e-kontrola: Warsaw's Plate-Scanning Parking Enforcement Cars

    Re-verified in the Warsaw City-of-the-Day build: retitled without the 'AI' label no source supports; the teaser's 14.7 million plates corrected to cars and foot patrols together; snippet leads with the operator ZDM; impact extended with the 2023-2024 series; a sourced lesson added; the unreadable RDC source replaced by TVN Warszawa carrying the same figures; complete claim array.

    unreviewed history →
  4. project Entered the record United Utilities' Storm-Overflow Monitors and Live Spill Map in Manchester

    Created the first structured Evidence Passport with 22 claims and 8 source dossiers.

    unreviewed history →
  5. project Entered the record CityVerve IoT Smart City Demonstrator

    Created the first structured Evidence Passport with 26 claims and 7 source dossiers.

    unreviewed history →
  6. project Entered the record TfGM Urban Traffic Control: Greater Manchester's Adaptive Signals

    Created the first structured Evidence Passport with 26 claims and 13 source dossiers.

    unreviewed history →
  7. project Entered the record Greater Manchester's Shared Public-Sector Fibre and the GM One Network

    Created the first structured Evidence Passport with 27 claims and 7 source dossiers.

    unreviewed history →
  8. project Entered the record Triangulum: Manchester's EU Smart-Energy Demonstrator on Oxford Road

    Created the first structured Evidence Passport with 24 claims and 7 source dossiers.

    unreviewed history →
  9. project Entered the record get me there (now Bee Card): Greater Manchester's Late Oyster-Style Smartcard

    Created the first structured Evidence Passport with 23 claims and 13 source dossiers.

    unreviewed history →
  10. project Entered the record Starling Bank Bikes: Greater Manchester's Cycle Hire After Mobike Left

    Created the first structured Evidence Passport with 26 claims and 13 source dossiers.

    unreviewed history →
  11. project Entered the record Bee Network: Greater Manchester's Franchised Buses and Tap-and-Go Fares

    Created the first structured Evidence Passport with 20 claims and 11 source dossiers.

    unreviewed history →
  12. project Entered the record Greater Manchester Clean Air Zone: ANPR Cameras for a Charge That Never Began

    Created the first structured Evidence Passport with 23 claims and 9 source dossiers.

    unreviewed history →
  13. project Publication date recorded for 10 sources North Cairo's JICA-Funded Smart Meter Rollout

    Source note corrected: it said the vendor page carries no date while its metadata dates the post 20 December 2024. The four sources without a date answer now carry one or an explicit null, and the journal article's label names its online publication date instead of its volume year.

    unreviewed history →
  14. project Publication date recorded for 7 sources Tokyo Digital Twin

    Source note corrected: it said no publication date is recorded while the source carries one; the date was checked on the page and is unchanged.

    unreviewed history →
  15. project Publication date recorded for 5 sources DigiTel Resident Card

    Source note corrected: it said no publication date is recorded while the source carries one; the date was checked on the page and is unchanged.

    unreviewed history →
  16. project Publication date recorded for 11 sources Rapid Pass Fare Card and Its Clearing House

    Source label corrected: it carried the date of the event or period the document covers, not the date the document was published; the recorded publication date was checked on the page and is unchanged.

    unreviewed history →
  17. project Publication date recorded for 7 sources Smart Nation Initiative

    Source label corrected: it carried the date of the event or period the document covers, not the date the document was published; the recorded publication date was checked on the page and is unchanged.

    unreviewed history →
  18. project Entered the record Watercare Smart Water Meters: Half-Hourly Readings and Two Billing Faults

    Created the first structured Evidence Passport with 17 claims and 10 source dossiers.

    unreviewed history →
  19. project Entered the record Auckland Rail's ETCS Level 1 Train Protection: Fitted to the Commuter Trains, Not to Everything on the Tracks

    Created the first structured Evidence Passport with 16 claims and 10 source dossiers.

    unreviewed history →
  20. project Entered the record Auckland Flood Viewer: Address-Level Flood Hazard Maps After the 2023 Floods

    Created the first structured Evidence Passport with 15 claims and 9 source dossiers.

    unreviewed history →
  21. project Entered the record Auckland Transport's Open Transit Feeds: GTFS Timetables and Real-Time Vehicle Data

    Created the first structured Evidence Passport with 16 claims and 10 source dossiers.

    unreviewed history →
  22. project Entered the record Auckland's Occupancy-Based On-Street Parking Prices

    Created the first structured Evidence Passport with 13 claims and 10 source dossiers.

    unreviewed history →
  23. project Entered the record Vector: Auckland's Trust-Owned Power Network and the Smart Meters It Does Not Own

    Created the first structured Evidence Passport with 15 claims and 10 source dossiers.

    unreviewed history →
  24. project Entered the record Auckland's Red-Light Cameras: Owned by Auckland Transport, Enforced by Someone Else

    Created the first structured Evidence Passport with 15 claims and 9 source dossiers.

    unreviewed history →
  25. project Entered the record Ports of Auckland's Abandoned Container-Terminal Automation

    Created the first structured Evidence Passport with 14 claims and 10 source dossiers.

    unreviewed history →
  26. project Entered the record Safeswim: Auckland's Modelled Beach Water-Quality Forecasts and Overflow Alerts

    Created the first structured Evidence Passport with 17 claims and 9 source dossiers.

    unreviewed history →
  27. project 4 sources added AT HOP Contactless Smartcard Ticketing

    Auckland deep build: impact from the 2013 Deloitte rail roll-out review, sourced lesson (2016 board report, national ticketing delay, 2026 bus-console spending), Snapper and bus-rollout wording corrected, superlative attributed; claim array rebuilt.

    unreviewed history →
  28. project 3 sources added Yokohama Smart City Project (YSCP)

    Success audit 2026-10-14: every source re-read and dated, claim array completed; corrections: lesson: 'The least checkable' no longer holds: the city published measured results with a randomised method in 2013 (via its press release, summarised by NIES and the trade press). 'The most-cited thing a city has done' has no source. The accurate point — the English page carries no figures — is kept, now with what the results actually are.

    unreviewed history →
  29. project Entered the record Sharing Cities — Greenwich Smart District

    Created the first structured Evidence Passport with 15 claims and 6 source dossiers.

    unreviewed history →
  30. project Entered the record GrowSmarter

    Created the first structured Evidence Passport with 12 claims and 5 source dossiers.

    unreviewed history →
  31. project Entered the record EnergyLab Nordhavn Smart Energy District

    Created the first structured Evidence Passport with 16 claims and 8 source dossiers.

    unreviewed history →
  32. project Entered the record SmartSantander

    Created the first structured Evidence Passport with 10 claims and 7 source dossiers.

    unreviewed history →
  33. project Entered the record SkyTrain Automated Rapid Transit Network

    Created the first structured Evidence Passport with 11 claims and 5 source dossiers.

    unreviewed history →
  34. project Outcome changed: succeeded → ongoing Sydney Metro Driverless Rapid Transit

    Success audit 2026-10-14: every source re-read and dated, claim array completed; outcome succeeded -> ongoing.

    unreviewed history →
  35. project Entered the record Stokab: Stockholm's Municipal Open-Access Dark Fibre Network

    Created the first structured Evidence Passport with 16 claims and 6 source dossiers.

    unreviewed history →
  36. project Entered the record SFpark Demand-Responsive Parking

    Created the first structured Evidence Passport with 14 claims and 9 source dossiers.

    unreviewed history →
  37. project Entered the record Surtrac AI Traffic Signals

    Created the first structured Evidence Passport with 14 claims and 7 source dossiers.

    unreviewed history →
  38. project Entered the record Budget Participatif — Citywide Participatory Budgeting

    Created the first structured Evidence Passport with 13 claims and 8 source dossiers.

    unreviewed history →
  39. project Entered the record Nanko Port Town Line (New Tram) Driverless Guideway

    Created the first structured Evidence Passport with 10 claims and 6 source dossiers.

    unreviewed history →
  40. project Entered the record „Aufenthalt Digital“ Goes AI

    Created the first structured Evidence Passport with 7 claims and 5 source dossiers.

    unreviewed history →
  41. project 5 sources added Oyster & Contactless Fare Payment

    Success audit 2026-10-14: every source re-read and dated, claim array completed; corrections: snippet: Caps apply only when the same card or device is used throughout (The Register, May 2026), and Wikipedia lists services where capping does not apply; the Wikipedia passage the old claim's contradiction relied on has since been removed. TfL's own promise is 'never pay more than the equivalent 7 Day ticket'.; teaser: Same 'never overpay' overstatement as the snippet; caps apply only to the same card or device.

    unreviewed history →
  42. project Entered the record ATSAC Citywide Adaptive Traffic Signals

    Created the first structured Evidence Passport with 12 claims and 7 source dossiers.

    unreviewed history →
  43. project Entered the record Fujisawa Sustainable Smart Town

    Created the first structured Evidence Passport with 14 claims and 6 source dossiers.

    unreviewed history →
  44. project Entered the record Ramani Huria Community Flood Mapping

    Created the first structured Evidence Passport with 11 claims and 6 source dossiers.

    unreviewed history →
  45. project 1 source added Copenhagen Bathing Water Forecast & Overflow Warning System

    Success audit 2026-10-14: every source re-read and dated, claim array completed.

    unreviewed history →
  46. project Entered the record Digital City Strategy

    Created the first structured Evidence Passport with 9 claims and 4 source dossiers.

    unreviewed history →
  47. project Entered the record Boti — WhatsApp City Assistant

    Created the first structured Evidence Passport with 18 claims and 9 source dossiers.

    unreviewed history →
  48. project Entered the record FixMyStreet Brussels

    Created the first structured Evidence Passport with 12 claims and 6 source dossiers.

    unreviewed history →
  49. project Outcome changed: succeeded → ongoing Barcelona Pneumatic Waste Collection Network

    Success audit 2026-10-14: every source re-read and dated, claim array completed; outcome succeeded -> ongoing; corrections: teaser: 'largely stopped there' is contradicted by the entry's own sources: Front Marítim joined from 1997, and the city lists neighbourhoods in four districts; Envac counts nine stations.

    unreviewed history →
  50. project Outcome changed: succeeded → ongoing Decidim Participation Platform

    Success audit 2026-10-14: every source re-read and dated, claim array completed; outcome succeeded -> ongoing; corrections: teaser: The project post counts 400 instances 'both in pre-production and in production' — not '400+ active'; and the list of institutional users is from 2022, so 'now run on it' is not supported for today.

    unreviewed history →
  51. project Entered the record Bicing Public Bike-Share

    Created the first structured Evidence Passport with 14 claims and 8 source dossiers.

    unreviewed history →
  52. project Entered the record Amsterdam Smart City Platform (now Amsterdam InChange)

    Created the first structured Evidence Passport with 8 claims and 8 source dossiers.

    unreviewed history →
  53. project Publication date recorded for 16 sources Johannesburg Water: Pressure Control and Night-Flow Telemetry Against Water Losses

    Title no longer carries a loss percentage that changes with every annual report (46.2% in 2023/24, 44.8% audited 2024/25, 47.1% unaudited 2025/26); the dated figures remain in the text.

    unreviewed history →
  54. project 1 claim added Digital Traffic Fines & Cashless Parking (AATMA)

    Driver-app sentence narrowed to what the May 2025 source supports (at launch); the AATMA Drivers app is no longer listed in the Apple App Store and could not be found on Google Play.

    unreviewed history →
  55. project 8 claims removed Termoalert: Live Outage Map of Bucharest's District Heating

    Impact set to null: the text described use of the app and the decline of the network, not an effect of the app; the network figures remain in the snippet.

    unreviewed history →
  56. project 1 source removed Tehran Traffic Zone automated congestion charging

    Traffic Zone start dated to 1979 (operator engineers' paper and peer-reviewed JTLU study); removed the 2026 wartime-suspension sentence, whose Persian source had only been seen in search results, not read at its URL.

    unreviewed history →
  57. project 1 claim removed Pune's Adaptive Traffic Management System (ATMS)

    Removed a contested single-press-account figure for 2024 upgrade payments (Rs 30 crore) from the snippet.

    unreviewed history →
  58. project Evidence grade changed: peer-reviewed → independent Electronic Road Pricing (ERP) Network

    Evidence grade changed from peer-reviewed to independent: the peer-reviewed Phang & Toh paper could not be read, and the traffic figure reaches the entry through the ITF/OECD review.

    unreviewed history →
  59. project Status changed: live → completed Digital Matatus: Nairobi's Matatu Routes Mapped into GTFS

    Status changed from live to completed with yearEnd 2020: the last collection was in 2019, the feed's calendar ran out on 31 December 2020 and the Mobility Database lists it as inactive; the outcome stays succeeded.

    unreviewed history →
  60. project Status changed: construction → planning Smart Water Meter Rollout

    Status changed from construction to planning: no source read shows the smart-meter replacement has begun; in September 2026 it was still described as a long-term plan.

    unreviewed history →
  61. project Outcome changed: succeeded → ongoing Urban Forest Visual & Email-a-Tree

    Outcome changed from succeeded to ongoing: the entry measures itself against the 40% canopy target for 2040, and canopy cover stood at 25.22% in the city's 2025-35 precinct plans.

    unreviewed history →
  62. project Status changed: cancelled → completed CASE Traffic Signal Automation

    Status changed from cancelled to completed: the World Bank's CASE project closed as planned in March 2019; the outcome stays failed because the signals fell out of use.

    unreviewed history →
  63. project Entered the record HDB Smart-Enabled Homes & Smart Town Framework

    Created the first structured Evidence Passport with 8 claims and 8 source dossiers.

    unreviewed history →
  64. project Entered the record Tehran Traffic Zone automated congestion charging

    Created the first structured Evidence Passport with 10 claims and 10 source dossiers.

    unreviewed history →
  65. project 3 sources added EASY Card, contactless bank cards and a daily fare cap

    Deep Run 2026-10-11: every source re-read and dated, present-tense statements dated, claim array completed; lesson: The county's fares page states that tapping 'your EASY Card (with stored value) or contactless-enabled bank card/digital wallet' starts a trip whose cost 'will be capped once you reach the cost of a 1-Day Pass'; a 2021 county release (now removed, seen only in a search index) announced that EASY Cards with stored value had been added to capping. The old clause asserted as fact what the county contradicts; the existing claim already carried a contradictedBy row.; teaser: 'Tap the county's own mobile pass and the Metrorail gate stays shut' is not what the county says: its contactless pag

    unreviewed history →
  66. project Operator changed Divvy: City-Owned Bike Share & Open Trip Data

    Deep Run 2026-10-11: every source re-read and dated, present-tense statements dated, claim array completed; sources: The modified stamp 2019-04-16T00:40Z is 19:40 local on 15 April (the page's own Last_Time_Updated reads 2019-04-15 19:40); a UTC stamp named the wrong local day.; sources: 2024-01-09T00:22Z is 18:22 local on 8 January, the publication day; a same-day stamp is not a revision.; sources (note) / lesson claim caveat: The quoted passage is not verbatim: the paper's own abstract (Semantic Scholar / OpenAlex record of DOI 10.3390/su16052146) reads 'the emergent model may actually contribute to a systematic exclusion of poorer neighborhoods'. Quotation marks must carry the exact words; the ol

    unreviewed history →
  67. project Entered the record Trans Metro Bandung — Live Tracking and QR Fares

    Created the first structured Evidence Passport with 13 claims and 7 source dossiers.

    unreviewed history →
  68. project 6 sources added Riyadh Bus Network & darb App

    Deep Run 2026-10-11: every source re-read and dated, present-tense statements dated, claim array completed; impact: The regulator counts passengers, not trips; 'trips' can be read as vehicle runs.; lesson: In December 2023 the app was the Riyadh Bus app, not darb (the darb metro-and-bus app experience shipped in December 2024); what verifiably existed a year ahead was the shared Darb Card, sold at metro-station machines. 'Journey-planning integration on the metro's first day' is not carried by any source.

    unreviewed history →
  69. project Entered the record Digital Traffic Fines & Cashless Parking (AATMA)

    Created the first structured Evidence Passport with 18 claims and 7 source dossiers.

    unreviewed history →
  70. project Entered the record SIREC Digital Civil Registry

    Created the first structured Evidence Passport with 10 claims and 6 source dossiers.

    unreviewed history →
  71. project 2 sources added SMAC Integrated Command and Control Centre

    Deep Run 2026-10-11: every source re-read and dated, present-tense statements dated, claim array completed; no factual corrections.

    unreviewed history →
  72. project 4 sources added Heat Action Plan

    Deep Run 2026-10-11: every source re-read and dated, present-tense statements dated, claim array completed; snippet: The probabilistic seven-day forecast was built by Georgia Tech for the 2013 pilot, when the IMD issued heat forecasts only a little over a day ahead; the IMD took over in 2016 with a five-day maximum-temperature forecast (seven days in the 2026 report). The old sentence merged the two.; snippet: These are the bands the 2018 evaluation describes for 2014–2015; the 2016 plan already draws them at 41.1–43 / 43.1–44.9 / 45°C, and no source states today's bands. Present tense moved to the evaluated years.; snippet: No source describes 'altered school hours' (2026: water breaks in municipal

    unreviewed history →
  73. project 4 sources added EFCOS: Metro Manila's Flood Telemetry and Floodway Gates

    Deep Run 2026-10-11: every source re-read and dated, present-tense statements dated, claim array completed; lesson: No listed source calls it the largest corruption case; SunStar's chronology says 'one of the biggest corruption controversies of 2025'. Unsupported superlative softened (the teaser carried the same superlative and is aligned).; sources: The page prints 'Published May 28, 2026 2:28pm' and a same-day update; a same-day revision is not recorded.

    unreviewed history →
  74. project Entered the record Pune's Adaptive Traffic Management System (ATMS)

    Created the first structured Evidence Passport with 15 claims and 7 source dossiers.

    unreviewed history →
  75. project Entered the record Smart Water Meter Rollout

    Created the first structured Evidence Passport with 14 claims and 7 source dossiers.

    unreviewed history →
  76. project Entered the record Madrid Open Data Portal

    Created the first structured Evidence Passport with 9 claims and 8 source dossiers.

    unreviewed history →
  77. project Entered the record Termoalert: Live Outage Map of Bucharest's District Heating

    Created the first structured Evidence Passport with 16 claims and 8 source dossiers.

    unreviewed history →
  78. project Evidence grade changed: independent → official Urban Forest Visual & Email-a-Tree

    Deep Run 2026-10-11: every source re-read and dated, present-tense statements dated, claim array completed; impact: No source dates the survey to 2012–13; AIPH ties it to the development of the 2012 strategy.; impact: Biophilic Cities says nothing about replies. The only source (ArchitectureAU, 2015) says the team 'occasionally' responds; 'reply in each tree's voice' overstated and set it in the present.; teaser: Same overstatement as in the impact.; lesson: No source states the cost of the email feature or of running the inbox.; sources: 1 May 2025 is a notice on the live map ('will be fully functional from 1 May 2025'), not a publication date; the tool is continuously updated.; sources: 12 Decembe

    unreviewed history →
  79. project 8 claims added City Data Exchange

    Deep Run 2026-10-11: every source re-read and dated, present-tense statements dated, claim array completed; sources: The four-page PDF states no publication date; its file creation stamp (September 2020) is a production artefact, not a date the document carries.

    unreviewed history →
  80. project Entered the record CASE Traffic Signal Automation

    Created the first structured Evidence Passport with 13 claims and 8 source dossiers.

    unreviewed history →
  81. project 5 sources added Metrocable & Social Urbanism

    Deep Run 2026-10-11: every source re-read and dated, present-tense statements dated, claim array completed; snippet: 'One of the world's most-cited' is an unsourced superlative; Dávila and Daste document that Rio de Janeiro, Caracas and other cities launched similar systems.; lesson: The old lesson is a moral no source states; the evidence the entry rests on measures a package of investments (Cerdá et al. list library parks, school buildings, lighting, more police patrols), and its authors say the design cannot separate the mechanisms. The story page quotes the old lesson in its closing section and must be aligned.; sources: PubMed records online publication on 2 April 2012; the print issue is 15 Ma

    unreviewed history →
  82. project Operator changed Busan-Gimhae Light Rail and Its Revenue Guarantee

    Deep Run 2026-10-11: every source re-read and dated, present-tense statements dated, claim array completed; snippet: Ridership peaked at 51,654 a day in 2017 and has not regained it, so 'recovered' overstates; the only 2025 figure is January-May (45,689), not ~45,800.; snippet: None of the sources read names the contract type BTO; they describe a private investment project with a minimum revenue guarantee. Same change in `funding` and `operator`.; lesson: The forecast came from the Korea Transport Institute, a state research body, not a consultant; 'the fourteen years already committed' has no source and no clear referent (payments run 2011-2041 under the revised agreement).; story: 30,084 is the av

    unreviewed history →
  83. project 1 source added Ultra Low Emission Zone (ULEZ)

    Deep Run 2026-10-11: every source re-read and dated, present-tense statements dated, claim array completed; impact: Crossref (DOI 10.1038/s44407-025-00030-9) lists Chengxu Tong as first author; Robert J. R. Elliott is the fourth of seven. The existing claim quotes the wrong name, so it changes with this correction.; sources: Same wrong first author in the label; the editor renames both ends (claim array references it).; lesson: "Clean-air zones work" generalises from one city, and "expansion needs early, honest communication with affected drivers" is carried by no listed source. The new lesson keeps the diminishing-returns point and grounds it in the study and the University of Birmingham release, a

    unreviewed history →
  84. project 2 sources added Central London Congestion Charging Scheme

    Deep Run 2026-10-11: every source re-read and dated, present-tense statements dated, claim array completed; impact: TfL's own pre-charging baseline is around 14 km/h (First Annual Report: "In 2002, average network speeds were again around 14 km/h"); no TfL text gives 13. The second report gives the after value as "around 17 km/h".; lesson: "Political courage beats waiting for perfect consensus" is a moral no source states. TfL's tracker surveys do show opinion moving towards the scheme after launch, which is what the following clause already claims.; sources: The £18.5m was our own sum of three table lines (17.2 + 1.1 + 0.2); the accounts never state it, and £18.5m appears in the same table as the u

    unreviewed history →
  85. project 2 sources added Electronic Road Pricing (ERP) Network

    Deep Run 2026-10-11: every source re-read and dated, present-tense statements dated, claim array completed; snippet: Gantry removal is no longer a later, undated exercise: LTA announced on 28 September 2026 that removal starts in October 2026 (62 non-operational gantries first, the 33 operational ones after charging ends on 31 December 2026) and that all 95 are to be modified or removed by June 2027.; impact: The ITF review does not corroborate the figure independently; it relays it and names its origin (Chin 2002; Phang and Toh 2004). "Corroborated" suggested a second measurement that does not exist.; sources: A note says what the document states, not how reachable it was; the phantom ~30% figure i

    unreviewed history →
  86. project 2 sources added Masdar City

    Deep Run 2026-10-11: every source re-read and dated, present-tense statements dated, claim array completed; snippet: No listed source calls it 'the world's first zero-carbon city' (AP quotes 'the world's most sustainable eco-city'; CPI says zero-carbon); the superlative is dropped.; snippet: 'Low-carbon by 2050' conflates two things: CPI (2018) reports the downgrade to 'low-carbon' with no year; 'by 2050' is Masdar's current net-zero pledge. The build-out statement is now dated and quantified (AP 2023).; snippet: The source count is 87,777 panels, not 87,000; the figure is moved to the claim caveat.; snippet: The citywide pod network was dropped in 2010, but the pilot line was not short-lived: The C

    unreviewed history →
  87. project 4 sources added Stockholm Congestion Charging Zone

    Deep Run 2026-10-11: every source re-read and dated, present-tense statements dated, claim array completed; snippet: 'One of Europe's first' is a superlative no listed source carries; the referendum itself is documented.; snippet: The permanent charge is a national tax decided by the Riksdag, and its revenue was earmarked for road investments; only the trial's revenue went to public transport (a 2016 increase later went partly to the metro).; impact: Börjesson et al. and Wikipedia's results table both give 53% yes excluding blank votes; ~52% matches no listed source.; sources: The page shows only 'Latest update: 2025-12-29', a revision date, not a publication date.; sources: The readable abstract ca

    unreviewed history →
  88. project Entered the record Central Business District Tolling (Congestion Pricing)

    Created the first structured Evidence Passport with 18 claims and 8 source dossiers.

    unreviewed history →
  89. project Entered the record The Line

    Created the first structured Evidence Passport with 12 claims and 16 source dossiers.

    unreviewed history →
  90. project 6 sources added Vumacam: Johannesburg's Privately Owned Camera and Plate-Reading Network

    Deep Run 2026-10-11: every source re-read and dated, present-tense statements dated, claim array completed; sources[*].note: A source note says what the source says, never how reachable it was.; claims[Since February 2019 …].find: The page does not contain 'R730'; it reads 'In 2019, the company charged 730 South African rand (roughly $50) a month per camera.'; claims[Since February 2024 …].find: defenceWeb writes '6 000' with a space; '6,000' does not occur on the page.; claims[A private company chose the streets …].find: TechCentral hyphenates: 'a R60-million plan to densify its Johannesburg coverage'.; claims[South Africa has no statute …].sourceLabels+find: The 2022 investigation states the absen

    unreviewed history →
  91. project 10 sources added Johannesburg Water: Pressure Control and Night-Flow Telemetry Against Water Losses

    Deep Run 2026-10-11: every source re-read and dated, present-tense statements dated, claim array completed; impact: Misattributed quotation. The quoted sentence does not occur in the Auditor-General's report (full text searched for 'consistently reaching', 'over 45%', 'remained above'); it is GroundUp's own summary. The report itself carries 'Water losses R10,30bn (4 years more than 30% norm)' in the City of Johannesburg profile. The facts stand; the quotation marks were wrong. This replaces the entry's one existing claim passage.; snippet: Tense ahead of the source. The utility's release says it 'has initiated a project to retrofit' the flow controls and that they 'will automatically throttle reser

    unreviewed history →
  92. project Entered the record Johannesburg's Speed Cameras: Leased from Syntell, Removed with the Contract

    Created the first structured Evidence Passport with 18 claims and 10 source dossiers.

    unreviewed history →
  93. project Entered the record Johannesburg's Ambient Air-Quality Stations: Measured, Published, Vandalised

    Created the first structured Evidence Passport with 18 claims and 10 source dossiers.

    unreviewed history →
  94. project Entered the record Gautrain: Gauteng's Rapid Rail Through Johannesburg, Run on a Patronage Guarantee

    Created the first structured Evidence Passport with 16 claims and 10 source dossiers.

    unreviewed history →
  95. project Entered the record City Power Smart Meters: Remote Load Limiting and the Non-Vending Prepaid Problem

    Created the first structured Evidence Passport with 17 claims and 10 source dossiers.

    unreviewed history →
  96. project Entered the record JMPD Integrated Intelligence Operations Centre: Johannesburg's Municipal Camera Control Room

    Created the first structured Evidence Passport with 23 claims and 10 source dossiers.

    unreviewed history →
  97. project Entered the record Johannesburg's Traffic Signals: Remote Fault Monitoring and the Backup Batteries That Were Stolen

    Created the first structured Evidence Passport with 12 claims and 9 source dossiers.

    unreviewed history →
  98. project Entered the record Johannesburg Broadband Network (BWired/MTC): City Fibre Bought Back for R1.3 Billion

    Created the first structured Evidence Passport with 22 claims and 10 source dossiers.

    unreviewed history →
  99. project Entered the record Project Phakama: Johannesburg's Single SAP Bill and the e-Joburg Portal

    Created the first structured Evidence Passport with 18 claims and 14 source dossiers.

    unreviewed history →
  100. project Entered the record Rea Vaya BRT: City-Owned Control Room, Contracted Buses, Riders the Auditor Could Not Count

    Created the first structured Evidence Passport with 19 claims and 10 source dossiers.

    unreviewed history →
  101. project Entered the record Operation Gcin'amanzi: Soweto's prepaid water meters and the Mazibuko judgment

    Created the first structured Evidence Passport with 16 claims and 11 source dossiers.

    unreviewed history →
  102. project 19 sources added Digital Matatus: Nairobi's Matatu Routes Mapped into GTFS

    Landmark of the Week re-read of every source: title made descriptive, all 135 routes rather than roughly 130, the first attributed to the team against Google's own announcement, the Springer chapter re-dated from 2020 to 2015, the BRT plan credited to ITDP with UN-Habitat and KeNHA, the survey sample named, the feed's 2020 expiry and the producer identity of the catalogue's replacing feed corrected; impact and lesson rewritten, 16 record claims and 91 story claims with locators, 9 outside sources added, every source dated or explicitly undated.

    unreviewed history →
  103. project Entered the record Fare-Free Transit for Métropole Residents (Pass Gratuité)

    Created the first structured Evidence Passport with 17 claims and 10 source dossiers.

    unreviewed history →
  104. project Entered the record Punggol Autonomous Shuttle Service

    Created the first structured Evidence Passport with 12 claims and 4 source dossiers.

    unreviewed history →
  105. project Entered the record TARP: Chicago's Deep Tunnel & Reservoir System

    Created the first structured Evidence Passport with 18 claims and 8 source dossiers.

    unreviewed history →
  106. project Entered the record Metro Micro On-Demand Shared Rides

    Created the first structured Evidence Passport with 14 claims and 10 source dossiers.

    unreviewed history →
  107. project 2 sources added PRESTO: a provincial fare card on a city transit system

    Quality run to P4: claim array, source dates, present-tense audit. Fare capping started on 1 September 2026 and most monthly passes ended on 31 August 2026 (the post-secondary monthly pass survives). The contract picture moved: Metrolinx opted out of the automatic renewal in May 2025, the agreement expires 28 November 2027, and the TTC's 2026 RFI closed on 17 July 2026 — so 'an open RFI' is stale.

    unreviewed history →
  108. project 2 sources added Free Public Transport for Registered Residents

    Quality run to P4: claim array, source dates, present-tense audit. Free travel for registered Tallinn residents continues: the Centre–Isamaa coalition signed on 1 December 2025 pledges to keep it, and ERR in March and May 2026 describes it as running; the city's rules page is gone, and no live source carries the 'rechecked monthly' detail, so it is removed.

    unreviewed history →
  109. project 1 source added Signalen: Open-Source Public-Space Reporting Platform

    Quality run to P4: claim array, source dates, present-tense audit. The classifier entry in the national register is unchanged (amended 21 April 2026, still in use); signalen.org now forwards to the community's space on the Alkemio platform and no longer carries the scale figures, which VNG's project page states; AT5/NH Nieuws reported in May 2026 just over half a million Amsterdam reports in 2025 and just over half of reporters satisfied by the city's own survey.

    unreviewed history →
  110. project 3 sources added Bossnett - Underground Vacuum Waste Collection

    Quality run to P4: claim array, source dates, present-tense audit. The network still runs and is still growing: BIR's 2025 annual report counts 11,330 household customers (10,851 at end-2024) and announces pipe work at Mindemyren from mid-March 2026; the Bergen kommune announcement of the Blue network is gone and is replaced by the municipality's live Avfallsløsninger page.

    unreviewed history →
  111. project 1 source added Circular Building Material Passports

    Quality run to P4: claim array, source dates, present-tense audit. Circl was dismantled from May 2024 with components stored for reuse and no new site named (Zuidas, Oct 2024). The 2019 Madaster item gave eight MRA municipalities certificates for being 'well on their way' to a passport for one building each — not passports, and not a city ledger. Scope is a set of pilots, not citywide.

    unreviewed history →
  112. project 1 source added Restriccion Vehicular: Santiago's Vintage-Tiered Plate Rationing

    Quality run to P4: claim array, source dates, present-tense audit. The 2026 season ran 4 May to 31 August as described (MTT page now readable, BioBio, Pauta). Enforcement is not purely manual: BioBio (3 May 2026) lists the region's tele-surveillance camera network alongside Carabineros and MTT inspectors, and Pauta (10 Aug 2026) says the transport secretariat has plate-recording cameras. The CATI line misdated the minister's statement (it was August 2025). Three source dates

    unreviewed history →
  113. project 10 claims added Marunouchi Naka-dori Low-Speed Mobility & Hub Trials

    Quality run to P4: claim array, source dates, present-tense audit. 'Since 2017' is sourced: BOLDLY's own release says the area council and BOLDLY have run autonomous-bus trials on Naka-dori continuously since 2017. But both 2022 sources are pre-announcements dated 7 Feb 2022 for an 18–22 Feb trial: '420' and '69 runs' are planned capacity (試乗人数 約420人, 予定), not rides logged. No results report was found, so the impact field has nothing to stand on.

    unreviewed history →
  114. project 2 sources added Owl Bus (Night Bus) — Big-Data Route Design

    Quality run to P4: claim array, source dates, present-tense audit. All 14 Owl Bus routes still ran in February 2026 (JoongAng). The route history was compressed: nine lines opened on 12 September 2013, the city's own 2016 page counts eight routes with 47 buses as of June 2016, and there were nine routes again before the April 2022 expansion.

    unreviewed history →
  115. project Entered the record BLUME Air-Quality Monitoring Network

    Created the first structured Evidence Passport with 12 claims and 7 source dossiers.

    unreviewed history →
  116. project Entered the record İstanbul Senin: İBB Citizen-Service & Participation App

    Created the first structured Evidence Passport with 8 claims and 5 source dossiers.

    unreviewed history →
  117. project Entered the record HSL Open Transit Data & the Digitransit Platform

    Created the first structured Evidence Passport with 8 claims and 6 source dossiers.

    unreviewed history →
  118. project 2 sources added Rotterdam Municipal Digital Twin

    Quality run to P4: claim array, source dates, present-tense audit. Live: the Open Urban Platform and its twin launched officially on 15 January 2025 and were handed to a governance board; Future Insight develops and manages it. The snippet's claim that planners use it for flooding and energy-transition scenarios is not carried by the sources, and no source states a measured effect.

    unreviewed history →
  119. project Entered the record Zona Azul Digital: app-sold parking permits replace paper scratch cards

    Created the first structured Evidence Passport with 14 claims and 11 source dossiers.

    unreviewed history →
  120. project 3 claims added Copenhagen's Cloudburst Management Plan

    Quality run to P4: claim array, source dates, present-tense audit. Still under construction; the most recent dated account (Yale e360, 28 July 2025, already in the entry) has the plan less than halfway done with two of four HOFOR tunnels finished. No newer dated source found; the entry's present-tense statements hold.

    unreviewed history →
  121. project 1 source added City of Melbourne Pedestrian Counting System

    Quality run to P4: claim array, source dates, present-tense audit. Still running: the open-data portal shows the sensor dataset reprocessed in September 2026 and per-minute past-hour counts; the 2025 totals come from a June 2026 analysis. Two precision fixes: no source says 'infrared', and the like-for-like comparison covers 94 sensors over May–December only.

    unreviewed history →
  122. project 1 source added NSW Spatial Digital Twin

    Quality run to P4: claim array, source dates, present-tense audit. SDT Explorer remains the state's public spatial viewer since replacing SIX Maps on 1 May 2025 (NSW Spatial Services news). The impact misplaced the 18 million requests: the December 2021 announcement counted them over the PREVIOUS 12 months, not after the funding boost.

    unreviewed history →
  123. project Entered the record Klemetsrud Waste-to-Energy Carbon Capture (CCS)

    Created the first structured Evidence Passport with 20 claims and 6 source dossiers.

    unreviewed history →
  124. project 1 source added Wiener Netze Smart Meter Rollout

    Quality run to P4: claim array, source dates, present-tense audit. The rollout is essentially complete (Wiener Netze, 30 March 2026: ~1.6 million installed, ~46,000 legacy meters left); no later count found. The national figure in impact was mis-dated: E-Control's final monitoring report (APA, 20 Nov 2025) gives 96.9% at the end of 2024, not ~97% at the end of 2025.

    unreviewed history →
  125. project 5 claims added Vienna Open Government Data Portal (data.wien.gv.at)

    Quality run to P4: claim array, source dates, present-tense audit. Digitales Wien (page modified March 2026) still describes several hundred datasets published as a rule under CC BY 4.0 on data.gv.at, and the duty under the Freedom of Information Act in force since 1 September 2025; the pilot edit of two days ago remains accurate.

    unreviewed history →
  126. project Entered the record Jakarta's Subsidence Monitoring & Groundwater-Free Zones

    Created the first structured Evidence Passport with 13 claims and 9 source dossiers.

    unreviewed history →
  127. project Entered the record BA Data — Buenos Aires's Open Data Portal

    Created the first structured Evidence Passport with 12 claims and 7 source dossiers.

    unreviewed history →
  128. project 1 source added Arroyo Maldonado relief tunnels & Buenos Aires's storm alert network

    Quality run to P4: claim array, source dates, present-tense audit. Nothing in the entry's present tense has been contradicted: the tunnels still carry the Maldonado (Infobae, 2024, on their maintenance), and the city's sensor pages still describe monitoring and alerting, not automatic actuation. Three passages overstate their sources and get minimal fixes.

    unreviewed history →
  129. project Entered the record TASMU Smart Qatar

    Created the first structured Evidence Passport with 9 claims and 9 source dossiers.

    unreviewed history →
  130. project Outcome changed: succeeded → ongoing ATM Open-Loop Contactless Ticketing

    Quality run to P4: claim array, source dates, present-tense audit. ATM's own page (read 5 Oct 2026) still gives €2.20 per trip, a €7.60 daily cap in Mi1–Mi3, daily-only capping, and no acceptance on S lines or Trenord; nothing in the snippet's present tense has gone stale.

    unreviewed history →
  131. project 3 sources added Antananarivo Urban Cable Car (Orange Line)

    Quality run to P4: claim array, source dates, present-tense audit. The line has stayed shut since 25 September 2025, but the snippet's June 2026 picture is incomplete: on 12 and 20 June 2026 the transport ministry called a restart a priority with an end-2026 target, and France's ambassador said Paris was open to talks on the debt. The presidency's inauguration page is gone (404); RFI's launch report replaces it and adds that the line opened four hours a day on generators for

    unreviewed history →
  132. project Entered the record Salik Dynamic Congestion Pricing

    Created the first structured Evidence Passport with 10 claims and 8 source dossiers.

    unreviewed history →
  133. project Entered the record Falcon Eye — Abu Dhabi's Citywide Camera and Command-Centre Network

    Created the first structured Evidence Passport with 11 claims and 7 source dossiers.

    unreviewed history →
  134. project 1 source added Telangana State Police Integrated Command & Control Centre (ICCC)

    Quality run to P4: claim array, source dates, present-tense audit. The centre opened on 4 August 2022 and still operates; the 2021 PIL against facial recognition drew a High Court notice in January 2022 and no ruling has been reported in any source found. The '900,000 cameras, most of them in Hyderabad' figure had no listed source; a dated report gives 9.22 lakh statewide, without a Hyderabad share.

    unreviewed history →
  135. project Entered the record e-KMC 2.0 Grievance Tracking & Monitoring Centre (Kolkata Municipal Corporation)

    Created the first structured Evidence Passport with 8 claims and 1 source dossier.

    unreviewed history →
  136. project Evidence grade changed: media → peer-reviewed Santander Cycles

    Quality run to P4: claim array, source dates, present-tense audit. Scheme live and unchanged in structure; the only cumulative hire figure TfL itself publishes is 109M+ since 2015 (Oct 2025), so the Wikipedia-only 136M is replaced. In-dock charging was announced for summer 2026; no source found confirms it has gone live.

    unreviewed history →
  137. project Entered the record London Datastore & Data for London Library

    Created the first structured Evidence Passport with 13 claims and 8 source dossiers.

    unreviewed history →
  138. project Entered the record Port of NEOM (Oxagon)

    Created the first structured Evidence Passport with 14 claims and 9 source dossiers.

    unreviewed history →
  139. project Entered the record Lanka Metro Transit Metro Bus — Live Tracking & QR Fares

    Created the first structured Evidence Passport with 9 claims and 8 source dossiers.

    unreviewed history →
  140. project Entered the record City of Miami Open Data: A Live GIS Hub and a Stalled Portal

    Created the first structured Evidence Passport with 11 claims and 8 source dossiers.

    unreviewed history →
  141. project 4 sources added Green Mark & Super Low Energy Buildings

    Quality run to P4: claim array, source dates, present-tense audit. The programme runs; BCA's masterplan page (updated 1 Sep 2026) moves the status on to ~66% of buildings greened and 33% against the SLE target as of Dec 2025, and SkyLab is still offered as a testbed. Two cited BCA URLs (SLE page, Keppel Bay release) now 404 after a site rebuild; live replacements found.

    unreviewed history →
  142. project Entered the record OneService: Singapore's Unified Municipal Feedback App

    Created the first structured Evidence Passport with 10 claims and 5 source dossiers.

    unreviewed history →
  143. project 3 sources added AT HOP Contactless Smartcard Ticketing

    Quality run to P4: claim array, source dates, present-tense audit. Still live: AT HOP and contactless run side by side, concessions remain HOP-only, and the national Motu Move replacement is now slated for Auckland no earlier than late 2027. Since the entry was written, AT gives contactless riders a NZ$20 daily cap (HOP keeps the NZ$50 seven-day cap); rail launch was 27 October 2012, not the 28th; the 2011 date of the rival card is unsourced.

    unreviewed history →
  144. project Entered the record Bike Share Toronto: city-owned bikes, contracted operator

    Created the first structured Evidence Passport with 14 claims and 12 source dossiers.

    unreviewed history →
  145. project Entered the record OPUS Card and the ARTM's Regional Fare System

    Created the first structured Evidence Passport with 14 claims and 10 source dossiers.

    unreviewed history →
  146. project Record revised Critical Episode Management: A Next-Day Forecast With Legal Force

    Re-verification: every source now carries its publication date or an explicit null.

    unreviewed history →
  147. project Record revised Green Mark & Super Low Energy Buildings

    Re-verification: every source now carries its publication date or an explicit null.

    unreviewed history →
  148. project Publication date recorded for 1 source Metromover: fare-free driverless people mover in downtown Miami

    Re-verification: every source now carries its publication date or an explicit null.

    unreviewed history →
  149. project 1 source removed Navigo Contactless Ticketing

    Re-verification: every source now carries its publication date or an explicit null; a Worldline press-release URL that now redirects to an unrelated firm was removed.

    unreviewed history →
  150. project Publication date recorded for 3 sources Santander Cycles

    Re-verification: every source now carries its publication date or an explicit null.

    unreviewed history →
  151. project Publication date recorded for 3 sources Circular Building Material Passports

    Re-verification: every source now carries its publication date or an explicit null.

    unreviewed history →
  152. project Record revised Istanbul Traffic Control Center & Adaptive Signals (İSBAK)

    Re-verification: every source now carries its publication date or an explicit null.

    unreviewed history →
  153. project 2 sources added Buenos Aires's Registered Recuperadores Urbanos & Green Centres

    Re-verification: July 2026 consultation on a tender that would open dry-waste collection zones to private companies.

    unreviewed history →
  154. project 1 source added RMCAB Air Quality Network & IBOCA Alert Phases

    Re-verification: the operator page behind '20 stations' is gone; the city counted 19 stations plus 70 microsensors in February 2026.

    unreviewed history →
  155. project 1 source added Critical Episode Management: A Next-Day Forecast With Legal Force

    Re-verification: the 2026 episode season closed with 21 episodes and 282 hours.

    unreviewed history →
  156. project 1 source added Metromover: fare-free driverless people mover in downtown Miami

    Re-verification: county memo (Dec 2025) forecasts overhaul completion 2028-2029.

    unreviewed history →
  157. project 2 sources added National Steps Challenge & HealthHub Digital Health

    Correction: the challenge was not folded into Healthier SG; it runs year-round and has enrolled eligible Healthy 365 users automatically since September 2023.

    unreviewed history →
  158. project 1 source added Santander Cycles

    Re-verification: Serco contract extended to 2031 (Dec 2025); in-dock e-bike charging announced for summer 2026.

    unreviewed history →
  159. project 1 source added Istanbul Traffic Control Center & Adaptive Signals (İSBAK)

    Re-verification: April 2026 İSBAK figure of 2,500+ managed smart intersections; ATAK share not stated.

    unreviewed history →
  160. project 1 source added Green Mark & Super Low Energy Buildings

    Re-verification: adds the programme-wide progress the Minister for National Development gave in July 2025.

    unreviewed history →
  161. project 1 source added Navigo Contactless Ticketing

    Correction: separates the January 2025 fare reform from the end of cardboard ticket sales on 5 November 2025.

    unreviewed history →
  162. project 1 source added Copenhagen's Cloudburst Management Plan

    Re-verification: Yale e360 (July 2025) reports the programme less than halfway, two of four tunnels finished.

    unreviewed history →
  163. project 1 source added Vienna's Citizens' Solar & Wind Power Plants

    Re-verification: 32nd plant (Nov 2025), ~15,000 participants and the current guaranteed minimum added; 2024 figures dated.

    unreviewed history →
  164. project 1 source added Vienna Open Government Data Portal (data.wien.gv.at)

    Re-verification: data.wien.gv.at now forwards to the city's publisher page on data.gv.at.

    unreviewed history →
  165. project 1 source added Circular Building Material Passports

    Re-verification: the Circl pavilion was dismantled from May 2024, materials stored for reuse.

    unreviewed history →
  166. project 2 sources added BEST electric bus fleet

    Re-verification: June 2026 count (774 of ~2,766) and the stalled Olectra order added; late-2024 figures kept as dated.

    unreviewed history →
  167. project 2 sources added Owl Bus (Night Bus) — Big-Data Route Design

    Re-verification: 14 routes since April 2022, still running nightly in February 2026; operating hours updated.

    unreviewed history →
  168. project 1 source added aspern Seestadt Smart City Lab

    Re-verification: adds the developer's early-2025 resident count next to the 25,000 target.

    unreviewed history →
  169. project 1 source added PUB Smart Water Grid & Leak-Detection Sensor Network

    Re-verification: PUB reported 1,500 permanent leak-detection sensors in February 2025, answering the open 2021 target question.

    unreviewed history →
  170. project 1 source added Oslo Climate Budget

    Re-verification: the city's Climate Budget 2026-2029 supersedes the 28%/65% figures; lesson now cites the later projection.

    unreviewed history →
  171. project Entered the record Apollo Go Robotaxi Network

    Created the first structured Evidence Passport with 74 claims and 16 source dossiers.

    unreviewed history →
  172. project 3 sources added Cairo Monorail: the East Nile Line to the New Capital

    Search-visibility uplift: sources re-read and dated, full claim array, stale or unsupported passages corrected against the sources, and the 2026 status checked.

    unreviewed history →
  173. project 4 sources added TransMilenio: Bogotá's BRT Trunk Network & Its Late Control Layer

    Search-visibility uplift: sources re-read and dated, full claim array, stale or unsupported passages corrected against the sources, and the 2026 status checked.

    unreviewed history →
  174. project Entered the record Urbana single city card

    Created the first structured Evidence Passport with 11 claims and 7 source dossiers.

    unreviewed history →
  175. project Entered the record City Parking Self-Service Digital Zones

    Created the first structured Evidence Passport with 13 claims and 6 source dossiers.

    unreviewed history →
  176. project Entered the record Waymo & Cruise Robotaxis: Permitted by the State, Not the City

    Created the first structured Evidence Passport with 13 claims and 11 source dossiers.

    unreviewed history →
  177. project 4 sources added Tehran Air Quality Monitoring Network & Pollution Emergency Closures

    Search-visibility uplift: sources re-read and dated, full claim array, stale or unsupported passages corrected against the sources, and the 2026 status checked.

    unreviewed history →
  178. project Entered the record Doha Air Quality Monitoring Network: Measured, Published, Answered with Advice

    Created the first structured Evidence Passport with 16 claims and 12 source dossiers.

    unreviewed history →
  179. project Entered the record Qatar Cool District Cooling: West Bay and The Pearl on Sewage Effluent

    Created the first structured Evidence Passport with 13 claims and 9 source dossiers.

    unreviewed history →
  180. project Entered the record Kahramaa Smart Meters: Every Electricity Meter in Qatar Replaced

    Created the first structured Evidence Passport with 17 claims and 11 source dossiers.

    unreviewed history →
  181. project Entered the record Metrash: Qatar's Interior Ministry in an App

    Created the first structured Evidence Passport with 14 claims and 9 source dossiers.

    unreviewed history →
  182. project Entered the record Doha Metro: A Network Sized for the World Cup

    Created the first structured Evidence Passport with 19 claims and 10 source dossiers.

    unreviewed history →
  183. project 1 source added Kashiwa-no-ha Smart City

    Popular-entry uplift: sources re-read and dated, full claim array, stale or unsupported passages corrected against the sources, and the 2026 status checked.

    unreviewed history →
  184. project 2 sources added Shared E-Scooter Trial and Council Ban

    Popular-entry uplift: sources re-read and dated, full claim array, stale or unsupported passages corrected against the sources, and the 2026 status checked.

    unreviewed history →
  185. project 1 source removed Helsinki 3D+ Open City Model

    Popular-entry uplift: sources re-read and dated, full claim array, stale or unsupported passages corrected against the sources, and the 2026 status checked.

    unreviewed history →
  186. project Operator changed Tallinn Mobile Parking Payment (m-Parking)

    Popular-entry uplift: sources re-read and dated, full claim array, stale or unsupported passages corrected against the sources, and the 2026 status checked.

    unreviewed history →
  187. project 3 sources added HCMC Metro Line 1 (Bến Thành–Suối Tiên)

    Popular-entry uplift: sources re-read and dated, full claim array, stale or unsupported passages corrected against the sources, and the 2026 status checked.

    unreviewed history →
  188. project Entered the record SF311 and its Open311 Write API

    Created the first structured Evidence Passport with 13 claims and 12 source dossiers.

    unreviewed history →
  189. project Operator changed Smart Nation Initiative

    Popular-entry uplift: sources re-read and dated, full claim array, stale or unsupported passages corrected against the sources, and the 2026 status checked.

    unreviewed history →
  190. project 1 source added Weight-Based Food Waste Fee (RFID Smart Bins)

    Popular-entry uplift: sources re-read and dated, full claim array, stale or unsupported passages corrected against the sources, and the 2026 status checked.

    unreviewed history →
  191. project 1 source added Beijing High-Level Autonomous Driving Demonstration Area (Yizhuang)

    Popular-entry uplift: sources re-read and dated, full claim array, stale or unsupported passages corrected against the sources, and the 2026 status checked.

    unreviewed history →
  192. project 1 source added Pasig River: Court-Ordered Water Quality Monitoring

    Popular-entry uplift: sources re-read and dated, full claim array, stale or unsupported passages corrected against the sources, and the 2026 status checked.

    unreviewed history →
  193. project Entered the record LADWP Advanced Metering Infrastructure Rollout

    Created the first structured Evidence Passport with 9 claims and 8 source dossiers.

    unreviewed history →
  194. project 3 sources added Nansha Port Phase IV Automated Container Terminal

    Popular-entry uplift: sources re-read and dated, full claim array, stale or unsupported passages corrected against the sources, and the 2026 status checked.

    unreviewed history →
  195. project Entered the record Kigali Master Plan Web GIS Portal

    Created the first structured Evidence Passport with 19 claims and 6 source dossiers.

    unreviewed history →
  196. project 1 source added Shanghai's Virtual Power Plant demand response

    Popular-entry uplift: sources re-read and dated, full claim array, stale or unsupported passages corrected against the sources, and the 2026 status checked.

    unreviewed history →
  197. project 1 source added ewz.LoRaWAN — Zurich's Municipal IoT Network

    Popular-entry uplift: sources re-read and dated, full claim array, stale or unsupported passages corrected against the sources, and the 2026 status checked.

    unreviewed history →
  198. project Entered the record Busan Eco Delta Smart City

    Created the first structured Evidence Passport with 6 claims and 4 source dossiers.

    unreviewed history →
  199. project Entered the record Oslo's Municipal On-Street EV Charging Network

    Created the first structured Evidence Passport with 12 claims and 6 source dossiers.

    unreviewed history →
  200. project 1 source removed Sydney Water's Smart Meter Pilot and Rollout Plan

    Popular-entry uplift: sources re-read and dated, full claim array, stale or unsupported passages corrected against the sources, and the 2026 status checked.

    unreviewed history →
  201. project 1 source added Green Line Train Protection System

    Popular-entry uplift: sources re-read and dated, full claim array, stale or unsupported passages corrected against the sources, and the 2026 status checked.

    unreviewed history →
  202. project Entered the record İETT Real-Time Bus Tracking & Open Transit Data

    Created the first structured Evidence Passport with 9 claims and 6 source dossiers.

    unreviewed history →
  203. project Outcome changed: succeeded → ongoing AccraMobile: Mapping the Trotro Network

    Outcome succeeded -> ongoing: the routes are still maintained in OpenStreetMap, but the published GTFS export has not been regenerated since its service calendar ran out on 31 January 2020, so the mapping's lasting result is still open.

    unreviewed history →
  204. project Entered the record TfL Open Data & Unified API

    Created the first structured Evidence Passport with 11 claims and 3 source dossiers.

    unreviewed history →
  205. project 3 sources added C4 Command Centre & the 123 Emergency Line

    Popular-entry uplift: sources re-read and dated, full claim array, stale or unsupported passages corrected against the sources, and the 2026 status checked.

    unreviewed history →
  206. project 15 claims added Virtual Singapore: National 3D City Model and Digital Twin

    Popular-entry uplift: sources re-read and dated, full claim array, stale or unsupported passages corrected against the sources, and the 2026 status checked.

    unreviewed history →
  207. project Outcome changed: succeeded → ongoing AI-Driven Demand Response for Copenhagen's District Heating

    Popular-entry uplift: sources re-read and dated, full claim array, stale or unsupported passages corrected against the sources, and the 2026 status checked.

    unreviewed history →
  208. project Outcome changed: succeeded → ongoing DigiTel Resident Card

    Popular-entry uplift: sources re-read and dated, full claim array, stale or unsupported passages corrected against the sources, and the 2026 status checked.

    unreviewed history →
  209. project 4 sources added Tokyo Digital Twin

    Popular-entry uplift: sources re-read and dated, full claim array, stale or unsupported passages corrected against the sources, and the 2026 status checked.

    unreviewed history →
  210. project Entered the record NICOS — Nagoya City Flood-Fighting Information System

    Created the first structured Evidence Passport with 10 claims and 6 source dossiers.

    unreviewed history →
  211. project 1 claim added BMA AI Adaptive Traffic Signals

    Popular-entry uplift: sources re-read and dated, full claim array, stale or unsupported passages corrected against the sources, and the 2026 status checked.

    unreviewed history →
  212. project 2 sources added Shenzhen's All-Electric Bus Fleet

    Popular-entry uplift: sources re-read and dated, full claim array, stale or unsupported passages corrected against the sources, and the 2026 status checked.

    unreviewed history →
  213. project 1 claim added Whim — Mobility-as-a-Service App

    Popular-entry uplift: sources re-read and dated, full claim array, stale or unsupported passages corrected against the sources, and the 2026 status checked.

    unreviewed history →
  214. project 1 source added Siemensstadt Square (Siemensstadt 2.0)

    Popular-entry uplift: sources re-read and dated, full claim array, stale or unsupported passages corrected against the sources, and the 2026 status checked.

    unreviewed history →
  215. project Entered the record Map Kibera — Residents Surveying an Informal Settlement into OpenStreetMap

    Created the first structured Evidence Passport with 18 claims and 10 source dossiers.

    unreviewed history →
  216. project 1 source added Songdo International Business District

    Popular-entry uplift: sources re-read and dated, full claim array, stale or unsupported passages corrected against the sources, and the 2026 status checked.

    unreviewed history →
  217. project 3 sources added Buenos Aires Subte: CBTC Resignalling & Control Centre

    Popular-entry uplift: sources re-read and dated, full claim array, stale or unsupported passages corrected against the sources, and the 2026 status checked.

    unreviewed history →
  218. project 2 sources added Yangshan Port Phase IV automated container terminal

    Popular-entry uplift: sources re-read and dated, full claim array, stale or unsupported passages corrected against the sources, and the 2026 status checked.

    unreviewed history →
  219. project 5 claims added Drinking Water Network SCADA

    Popular-entry uplift: sources re-read and dated, full claim array, stale or unsupported passages corrected against the sources, and the 2026 status checked.

    unreviewed history →
  220. project Entered the record Smart Docklands

    Created the first structured Evidence Passport with 11 claims and 8 source dossiers.

    unreviewed history →
  221. project 1 source added AccraMobile: Mapping the Trotro Network

    Popular-entry uplift: sources re-read and dated, full claim array, stale or unsupported passages corrected against the sources, and the 2026 status checked.

    unreviewed history →
  222. project 2 sources added Tianjin Zero-Carbon Smart Terminal

    Popular-entry uplift: sources re-read and dated, full claim array, stale or unsupported passages corrected against the sources, and the 2026 status checked.

    unreviewed history →
  223. project 2 sources added Clipper: One Card for Two Dozen Bay Area Operators, and the Rebuild That Ran Late

    Popular-entry uplift: sources re-read and dated, full claim array, stale or unsupported passages corrected against the sources, and the 2026 status checked.

    unreviewed history →
  224. project Evidence grade changed: independent → peer-reviewed PPWSA: Metering Out a 72% Water Loss

    Landmark of the Week upgrade: loss-rate series brought up to date (PPWSA's own reports give 27.27% for 2024 and 25.55% for 2025, not 8.75%); metering completed by 2001, not 1994; zone telemetry existed by 2008, so 'SCADA came later' is corrected; peer-reviewed evaluation now read; story page with 21 claims added.

    unreviewed history →
  225. project Entered the record Dublin City Council Drone Unit and Drone Strategy

    Created the first structured Evidence Passport with 9 claims and 8 source dossiers.

    unreviewed history →
  226. project Entered the record Dublin Project Air View: Street-by-Street Air Quality Mapping

    Created the first structured Evidence Passport with 14 claims and 7 source dossiers.

    unreviewed history →
  227. project Entered the record Dublin's Bigbelly Smart Bins: Fill-Level Alerts and a Smaller Bin Count

    Created the first structured Evidence Passport with 12 claims and 5 source dossiers.

    unreviewed history →
  228. project Entered the record Dublin Real-Time Passenger Information & the NTA's Open GTFS-Realtime Feed

    Created the first structured Evidence Passport with 17 claims and 13 source dossiers.

    unreviewed history →
  229. project Entered the record TFI Leap Card: Dublin's Fare Card, Its Caps and the Contactless Successor Due in 2028

    Created the first structured Evidence Passport with 21 claims and 14 source dossiers.

    unreviewed history →
  230. project Entered the record Dublin Ambient Sound Monitoring Network: Measuring Noise Without a Limit

    Created the first structured Evidence Passport with 19 claims and 8 source dossiers.

    unreviewed history →
  231. project Entered the record dublinbikes: Bike Share Paid for With Billboards

    Created the first structured Evidence Passport with 17 claims and 11 source dossiers.

    unreviewed history →
  232. project Entered the record Dublin Tidal Flood Forecasting: A Forecast That Tells the Council When to Shut the Gates

    Created the first structured Evidence Passport with 13 claims and 4 source dossiers.

    unreviewed history →
  233. project Entered the record SCATS Adaptive Signals and the Traffic Management Centre

    Created the first structured Evidence Passport with 16 claims and 8 source dossiers.

    unreviewed history →
  234. project 22 claims added Diesel Driving Ban on Max-Brauer-Allee & Stresemannstraße

    Added the long-form story page and anchored 22 of its passages to the sources, so every factual sentence on it resolves to a document — the chronology from the 2014 court order to the 2023 lifting, the NO2 series per year and measuring height, and the criticism from both directions on day one.

    unreviewed history →
  235. project 13 sources added Diesel Driving Ban on Max-Brauer-Allee & Stresemannstraße

    Completed the claim array, corrected two source dates, and replaced three passages the sources do not carry: a percentage we had derived ourselves, an editorial absolute about automated enforcement, and a compliance sentence that hid the station's two measuring heights disagreeing in 2019.

    unreviewed history →
  236. project 2 sources added Hamburg Online Administration & Electronic Residence Registration

    Completed the claim array across snippet, impact and lesson, sourced two superlatives the entry carried without support (first end-to-end residence re-registration, first OZG service in all 16 states) and corrected a source publication date.

    unreviewed history →
  237. project 1 source added Transparenzportal: Publish-by-Default Information Register

    Completed the claim array across snippet, impact and lesson, keeping the author-verified evaluation claim untouched, and recorded a publication date or an explicit null on every source.

    unreviewed history →
  238. project 2 sources added StadtRAD Hamburg Bike Share

    Completed the claim array across snippet, impact and lesson, dated every source or recorded it as undated, and replaced a dead Deutsche Bahn article with the dated Radio Hamburg report that carries the same rental figure.

    unreviewed history →
  239. project Entered the record TAVF Test Track for Automated and Connected Driving

    Created the first structured Evidence Passport with 14 claims and 9 source dossiers.

    unreviewed history →
  240. project Entered the record smartPORT Hamburg

    Created the first structured Evidence Passport with 14 claims and 7 source dossiers.

    unreviewed history →
  241. project Entered the record hvv switch Mobility Hubs & App

    Created the first structured Evidence Passport with 12 claims and 9 source dossiers.

    unreviewed history →
  242. project Entered the record Hamburg Heavy Rain Map & Severity Index

    Created the first structured Evidence Passport with 11 claims and 7 source dossiers.

    unreviewed history →
  243. project Entered the record ALIKE Autonomous Ride-Pooling (MOIA ID. Buzz)

    Created the first structured Evidence Passport with 14 claims and 5 source dossiers.

    unreviewed history →
  244. project Entered the record Flood & Typhoon Command System

    Created the first structured Evidence Passport with 9 claims and 3 source dossiers.

    unreviewed history →
  245. project Entered the record Smart Solar Waste Bins

    Created the first structured Evidence Passport with 8 claims and 4 source dossiers.

    unreviewed history →
  246. project Entered the record Niamey Urban Fibre Loop — Trans-Saharan Backbone Project

    Created the first structured Evidence Passport with 8 claims and 3 source dossiers.

    unreviewed history →
  247. project Entered the record mos.ru — Moscow's E-Government Portal

    Created the first structured Evidence Passport with 7 claims and 3 source dossiers.

    unreviewed history →
  248. project Entered the record WURI Biometric Social Safety Program

    Created the first structured Evidence Passport with 8 claims and 6 source dossiers.

    unreviewed history →
  249. project Entered the record eVax Cold Chain Guard — Digital Vaccine Cold-Chain Tracking

    Created the first structured Evidence Passport with 8 claims and 2 source dossiers.

    unreviewed history →
  250. project Entered the record MEW Smart Meter Rollout

    Created the first structured Evidence Passport with 8 claims and 4 source dossiers.

    unreviewed history →
  251. project Entered the record Smart Police Stations (SPS)

    Created the first structured Evidence Passport with 9 claims and 3 source dossiers.

    unreviewed history →
  252. project Entered the record nol Card — Transit Ticketing and Its Bank-Card Upgrade

    Created the first structured Evidence Passport with 10 claims and 3 source dossiers.

    unreviewed history →
  253. project Entered the record Drone-Based 3D Digital Twin

    Created the first structured Evidence Passport with 11 claims and 3 source dossiers.

    unreviewed history →
  254. project Entered the record Tartu Smart Bike Share: Bike Share Run as Public Transport

    Created the first structured Evidence Passport with 25 claims and 15 source dossiers.

    unreviewed history →
  255. project Entered the record Tartu Self-Driving Shuttle Pilots

    Created the first structured Evidence Passport with 14 claims and 6 source dossiers.

    unreviewed history →
  256. project Entered the record Urban Data Platform: What Outlived the SmartEnCity Lighthouse

    Created the first structured Evidence Passport with 13 claims and 8 source dossiers.

    unreviewed history →
  257. project Entered the record LED Street Lighting: A Slow District Plan, Then One Big Procurement

    Created the first structured Evidence Passport with 15 claims and 10 source dossiers.

    unreviewed history →
  258. project Entered the record All-Biomethane City Bus Network

    Created the first structured Evidence Passport with 17 claims and 10 source dossiers.

    unreviewed history →
  259. project Entered the record Kaasav Eelarve — Estonia's First Participatory Budget

    Created the first structured Evidence Passport with 14 claims and 5 source dossiers.

    unreviewed history →
  260. project Entered the record SmartEnCity: the 'Smartovka' Retrofit of Soviet-Era Blocks

    Created the first structured Evidence Passport with 31 claims and 13 source dossiers.

    unreviewed history →
  261. project 6 sources added Hoy No Circula: Mexico City's Plate-Based Driving Restriction

    Landmark-of-the-week editorial re-verification: full-field claim coverage (12 to 28 claims, every claim with a locator or an explicit reason), every source dated or explicitly null, six sources added (El Universal chronology and live rules pages, El Horizonte, the open Gallego working paper, the Guerra and Millard-Ball preprint), and three corrections — the 'Un Dia sin Auto' name belongs to a 1984 voluntary campaign rather than the 1989 decree, the five 2025 contingencies are re-anchored to a source that actually carries them, and Guerra and Millard-Ball's rejection of the second-car explanation is now presented as a contradiction in the record.

    unreviewed history →
  262. project Record revised Digital Matatus: Nairobi's Matatu Routes Mapped into GTFS

    Resolve a source note that said no publication date is recorded while the source carries one.

    unreviewed history →
  263. project Record revised Jakarta Neighbourhood Flood Sirens and Sensor Posts

    Resolve a source note that said no publication date is recorded while the source carries one.

    unreviewed history →
  264. project Publication date recorded for 7 sources Jiesu Jiban: 12345 complaint hotline and district scorecards

    Resolve a source note that said no publication date is recorded while the source carries one.

    unreviewed history →
  265. project Record revised Marina Bay District Cooling Network

    Resolve a source note that said no publication date is recorded while the source carries one.

    unreviewed history →
  266. project Record revised Oahu Rooftop Solar Saturation and Advanced Meters

    Resolve a source note that said no publication date is recorded while the source carries one.

    unreviewed history →
  267. project Record revised Tap&Go Cashless Urban Transit Network

    Resolve a source note that said no publication date is recorded while the source carries one.

    unreviewed history →
  268. project Record revised AccraMobile: Mapping the Trotro Network

    Rewrite a source note that told the reader how the page answered a request instead of what it carries.

    unreviewed history →
  269. project Record revised Addis Ababa Light Rail Transit

    Rewrite a source note that told the reader how the page answered a request instead of what it carries.

    unreviewed history →
  270. project Record revised BA Elige: Buenos Aires's Online Participatory Budget

    Rewrite a source note that told the reader how the page answered a request instead of what it carries.

    unreviewed history →
  271. project Publication date recorded for 6 sources Beijing's Financial Public Data Zone

    Rewrite a source note that told the reader how the page answered a request instead of what it carries.

    unreviewed history →
  272. project Record revised Delhi EV Policy & Discom-Tendered Public Charging

    Rewrite a source note that told the reader how the page answered a request instead of what it carries.

    unreviewed history →
  273. project Evidence grade changed: peer-reviewed → official Tsunami-Alert Automatic Tide Gate Closure

    Lower the evidence grade: the one research source is cited as context and carries no statement here; everything that carries the entry is the prefecture.

    unreviewed history →
  274. project Evidence grade changed: independent → media Addis Ababa Light Rail Transit

    Name the peer-reviewed assessment the cited blog summarises, and lower the evidence grade to what actually carries the entry.

    unreviewed history →
  275. project Record revised CityScore Performance Dashboard

    Remove the inferred fiscal year, in the lesson as well as the record.

    unreviewed history →
  276. project 1 claim added Open Transit Data Portal & Live Bus Feeds

    Remove an unsupported claim - no source of this entry says the feed reaches Google Maps - and anchor the app figures the remaining source states.

    unreviewed history →
  277. project Evidence grade changed: independent → official Owl Bus (Night Bus) — Big-Data Route Design

    Lower the evidence grade to match what the entry already says: all figures are the city government’s own.

    unreviewed history →
  278. project Timeline changed: 2016–2023 → 2017–2023 RTA Smart Parking: Sensor-Guided Vacant-Space Finder

    Correct a start year no source in this entry carries, and anchor the estate and the savings the RTA release states.

    unreviewed history →
  279. project Evidence grade changed: independent → media Sidewalk Toronto (Quayside)

    Lower the evidence grade: what carries this entry is press reporting and the promoter, not an outside evaluation.

    unreviewed history →
  280. project Evidence grade changed: independent → media Superblock Sant Antoni

    Lower the evidence grade: every impact figure here is carried by trade press reporting the health agency, not by the agency report itself.

    unreviewed history →
  281. project Publication date recorded for 4 sources Suvilahti Solar Power Plant (Panel Rental)

    Remove a figure this atlas computed itself: the net monthly cost was our own subtraction, not a published number.

    unreviewed history →
  282. project Publication date recorded for 4 sources +CityxChange

    Every source on this entry now carries a date key: a publication date where the publisher states one, otherwise an explicit null with the reason on the record.

    unreviewed history →
  283. project Publication date recorded for 6 sources AccraMobile: Mapping the Trotro Network

    Every source on this entry now carries a date key: a publication date where the publisher states one, otherwise an explicit null with the reason on the record.

    unreviewed history →
  284. project Publication date recorded for 6 sources AT HOP Contactless Smartcard Ticketing

    Every source on this entry now carries a date key: a publication date where the publisher states one, otherwise an explicit null with the reason on the record.

    unreviewed history →
  285. project Publication date recorded for 2 sources Automated LED Smart Streetlight Mesh

    Every source on this entry now carries a date key: a publication date where the publisher states one, otherwise an explicit null with the reason on the record.

    unreviewed history →
  286. project Publication date recorded for 3 sources Automated Port Shore Power Matrix

    Every source on this entry now carries a date key: a publication date where the publisher states one, otherwise an explicit null with the reason on the record.

    unreviewed history →
  287. project Publication date recorded for 9 sources BA Elige: Buenos Aires's Online Participatory Budget

    Every source on this entry now carries a date key: a publication date where the publisher states one, otherwise an explicit null with the reason on the record.

    unreviewed history →
  288. project Publication date recorded for 6 sources Busan's 16 District CCTV Integrated Control Centres

    Every source on this entry now carries a date key: a publication date where the publisher states one, otherwise an explicit null with the reason on the record.

    unreviewed history →
  289. project Publication date recorded for 7 sources Carris Real-Time Bus & Tram Tracking

    Every source on this entry now carries a date key: a publication date where the publisher states one, otherwise an explicit null with the reason on the record.

    unreviewed history →
  290. project Publication date recorded for 5 sources Centro de Operações do Recife (COP)

    Every source on this entry now carries a date key: a publication date where the publisher states one, otherwise an explicit null with the reason on the record.

    unreviewed history →
  291. project Publication date recorded for 2 sources Citywide Smart Water Meter Rollout

    Every source on this entry now carries a date key: a publication date where the publisher states one, otherwise an explicit null with the reason on the record.

    unreviewed history →
  292. project Publication date recorded for 3 sources Confluence Smarter Together Energy Grid

    Every source on this entry now carries a date key: a publication date where the publisher states one, otherwise an explicit null with the reason on the record.

    unreviewed history →
  293. project Publication date recorded for 6 sources Copenhagen's LED Streetlight Retrofit & Remote Control Network

    Every source on this entry now carries a date key: a publication date where the publisher states one, otherwise an explicit null with the reason on the record.

    unreviewed history →
  294. project Publication date recorded for 3 sources Dallas OpenData Portal

    Every source on this entry now carries a date key: a publication date where the publisher states one, otherwise an explicit null with the reason on the record.

    unreviewed history →
  295. project Publication date recorded for 6 sources Delhi EV Policy & Discom-Tendered Public Charging

    Every source on this entry now carries a date key: a publication date where the publisher states one, otherwise an explicit null with the reason on the record.

    unreviewed history →
  296. project Publication date recorded for 5 sources Digital Infrastructure Strategic Framework (DISF)

    Every source on this entry now carries a date key: a publication date where the publisher states one, otherwise an explicit null with the reason on the record.

    unreviewed history →
  297. project Publication date recorded for 6 sources Digital Matatus: Nairobi's Matatu Routes Mapped into GTFS

    Every source on this entry now carries a date key: a publication date where the publisher states one, otherwise an explicit null with the reason on the record.

    unreviewed history →
  298. project Publication date recorded for 4 sources DigiTel Resident Card

    Every source on this entry now carries a date key: a publication date where the publisher states one, otherwise an explicit null with the reason on the record.

    unreviewed history →
  299. project Publication date recorded for 5 sources District Smart Lighting P3 Modernization

    Every source on this entry now carries a date key: a publication date where the publisher states one, otherwise an explicit null with the reason on the record.

    unreviewed history →
  300. project Publication date recorded for 4 sources Drone Fly-Tipping Detection & Enforcement

    Every source on this entry now carries a date key: a publication date where the publisher states one, otherwise an explicit null with the reason on the record.

    unreviewed history →
  301. project Publication date recorded for 3 sources e-Health Surabaya — Online Queueing for Public Clinics

    Every source on this entry now carries a date key: a publication date where the publisher states one, otherwise an explicit null with the reason on the record.

    unreviewed history →
  302. project Publication date recorded for 7 sources Ecobici Bike Share

    Every source on this entry now carries a date key: a publication date where the publisher states one, otherwise an explicit null with the reason on the record.

    unreviewed history →
  303. project Publication date recorded for 3 sources Energy-Autonomous Wastewater Plant Kaditz

    Every source on this entry now carries a date key: a publication date where the publisher states one, otherwise an explicit null with the reason on the record.

    unreviewed history →
  304. project Publication date recorded for 4 sources Free Public Transport for Registered Residents

    Every source on this entry now carries a date key: a publication date where the publisher states one, otherwise an explicit null with the reason on the record.

    unreviewed history →
  305. project Publication date recorded for 5 sources Freetown the Treetown Mobile Token System

    Every source on this entry now carries a date key: a publication date where the publisher states one, otherwise an explicit null with the reason on the record.

    unreviewed history →
  306. project Publication date recorded for 4 sources GeniLac Lake-Water Thermal Grid

    Every source on this entry now carries a date key: a publication date where the publisher states one, otherwise an explicit null with the reason on the record.

    unreviewed history →
  307. project Publication date recorded for 7 sources Glasgow Operations Centre

    Every source on this entry now carries a date key: a publication date where the publisher states one, otherwise an explicit null with the reason on the record.

    unreviewed history →
  308. project Publication date recorded for 3 sources Guangzhou Public Data Open Platform

    Every source on this entry now carries a date key: a publication date where the publisher states one, otherwise an explicit null with the reason on the record.

    unreviewed history →
  309. project Publication date recorded for 4 sources HCMC Intelligent Traffic Control Center

    Every source on this entry now carries a date key: a publication date where the publisher states one, otherwise an explicit null with the reason on the record.

    unreviewed history →
  310. project Publication date recorded for 4 sources Helsinki 3D+ Open City Model

    Every source on this entry now carries a date key: a publication date where the publisher states one, otherwise an explicit null with the reason on the record.

    unreviewed history →
  311. project Publication date recorded for 1 source High-density air-quality monitoring and source-apportionment network

    Every source on this entry now carries a date key: a publication date where the publisher states one, otherwise an explicit null with the reason on the record.

    unreviewed history →
  312. project Publication date recorded for 3 sources iAM Smart Digital Identity & Single Sign-On

    Every source on this entry now carries a date key: a publication date where the publisher states one, otherwise an explicit null with the reason on the record.

    unreviewed history →
  313. project Publication date recorded for 5 sources IC3 Integrated Safe City Command Centre

    Every source on this entry now carries a date key: a publication date where the publisher states one, otherwise an explicit null with the reason on the record.

    unreviewed history →
  314. project Publication date recorded for 3 sources Integrated Command and Control Centre (ICCC)

    Every source on this entry now carries a date key: a publication date where the publisher states one, otherwise an explicit null with the reason on the record.

    unreviewed history →
  315. project Publication date recorded for 4 sources ISKI Centralized SCADA Water Balancing Strategy

    Every source on this entry now carries a date key: a publication date where the publisher states one, otherwise an explicit null with the reason on the record.

    unreviewed history →
  316. project Publication date recorded for 7 sources Jakarta Neighbourhood Flood Sirens and Sensor Posts

    Every source on this entry now carries a date key: a publication date where the publisher states one, otherwise an explicit null with the reason on the record.

    unreviewed history →
  317. project Publication date recorded for 3 sources Katri Vala Heat Pump Plant

    Every source on this entry now carries a date key: a publication date where the publisher states one, otherwise an explicit null with the reason on the record.

    unreviewed history →
  318. project Publication date recorded for 3 sources Klimastraße Cologne-Nippes

    Every source on this entry now carries a date key: a publication date where the publisher states one, otherwise an explicit null with the reason on the record.

    unreviewed history →
  319. project Publication date recorded for 3 sources Kultur-Token

    Every source on this entry now carries a date key: a publication date where the publisher states one, otherwise an explicit null with the reason on the record.

    unreviewed history →
  320. project Publication date recorded for 3 sources LärmLAB Noise & Environment Network

    Every source on this entry now carries a date key: a publication date where the publisher states one, otherwise an explicit null with the reason on the record.

    unreviewed history →
  321. project Publication date recorded for 4 sources LUUP Shared E-Scooters & E-Assist Bikes

    Every source on this entry now carries a date key: a publication date where the publisher states one, otherwise an explicit null with the reason on the record.

    unreviewed history →
  322. project Publication date recorded for 4 sources Lyon Confluence

    Every source on this entry now carries a date key: a publication date where the publisher states one, otherwise an explicit null with the reason on the record.

    unreviewed history →
  323. project Publication date recorded for 3 sources Marina Bay District Cooling Network

    Every source on this entry now carries a date key: a publication date where the publisher states one, otherwise an explicit null with the reason on the record.

    unreviewed history →
  324. project Publication date recorded for 5 sources Metroplús Bus Rapid Transit (BRT) & Fleet Telematics

    Every source on this entry now carries a date key: a publication date where the publisher states one, otherwise an explicit null with the reason on the record.

    unreviewed history →
  325. project Publication date recorded for 5 sources Miami Forever flood-resilience program

    Every source on this entry now carries a date key: a publication date where the publisher states one, otherwise an explicit null with the reason on the record.

    unreviewed history →
  326. project Publication date recorded for 2 sources Nama Water SCADA Distribution Network

    Every source on this entry now carries a date key: a publication date where the publisher states one, otherwise an explicit null with the reason on the record.

    unreviewed history →
  327. project Publication date recorded for 6 sources New Administrative Capital

    Every source on this entry now carries a date key: a publication date where the publisher states one, otherwise an explicit null with the reason on the record.

    unreviewed history →
  328. project Publication date recorded for 5 sources Nirbhaya CCTV & ANPR Surveillance Network (Kolkata Police)

    Every source on this entry now carries a date key: a publication date where the publisher states one, otherwise an explicit null with the reason on the record.

    unreviewed history →
  329. project Publication date recorded for 4 sources Oahu Rooftop Solar Saturation and Advanced Meters

    Every source on this entry now carries a date key: a publication date where the publisher states one, otherwise an explicit null with the reason on the record.

    unreviewed history →
  330. project Publication date recorded for 5 sources Open Data Zürich: CC0 Government Data Catalogue

    Every source on this entry now carries a date key: a publication date where the publisher states one, otherwise an explicit null with the reason on the record.

    unreviewed history →
  331. project Publication date recorded for 3 sources Oslo Climate Budget

    Every source on this entry now carries a date key: a publication date where the publisher states one, otherwise an explicit null with the reason on the record.

    unreviewed history →
  332. project Publication date recorded for 2 sources PMPML's All-Green Bus Fleet & Command Control Centre

    Every source on this entry now carries a date key: a publication date where the publisher states one, otherwise an explicit null with the reason on the record.

    unreviewed history →
  333. project Publication date recorded for 3 sources Port of Rotterdam IoT & Hydro/Meteo Platform

    Every source on this entry now carries a date key: a publication date where the publisher states one, otherwise an explicit null with the reason on the record.

    unreviewed history →
  334. project Record revised Prepaid Smart Water Meter Rollout

    Every source on this entry now carries a date key: a publication date where the publisher states one, otherwise an explicit null with the reason on the record.

    unreviewed history →
  335. project Publication date recorded for 3 sources PUB Smart Water Grid & Leak-Detection Sensor Network

    Every source on this entry now carries a date key: a publication date where the publisher states one, otherwise an explicit null with the reason on the record.

    unreviewed history →
  336. project Publication date recorded for 3 sources Punggol Digital District Open Digital Platform & Smart Grid

    Every source on this entry now carries a date key: a publication date where the publisher states one, otherwise an explicit null with the reason on the record.

    unreviewed history →
  337. project Publication date recorded for 3 sources Railbelt Battery Storage & Fire Island Wind Integration

    Every source on this entry now carries a date key: a publication date where the publisher states one, otherwise an explicit null with the reason on the record.

    unreviewed history →
  338. project Publication date recorded for 5 sources Recicla Lima

    Every source on this entry now carries a date key: a publication date where the publisher states one, otherwise an explicit null with the reason on the record.

    unreviewed history →
  339. project Record revised Rio Operations Center (COR)

    Every source on this entry now carries a date key: a publication date where the publisher states one, otherwise an explicit null with the reason on the record.

    unreviewed history →
  340. project Publication date recorded for 3 sources Rome Smart Water Network (Acea Ato 2)

    Every source on this entry now carries a date key: a publication date where the publisher states one, otherwise an explicit null with the reason on the record.

    unreviewed history →
  341. project Publication date recorded for 4 sources S-Pole — Multipurpose Smart Streetlight Network

    Every source on this entry now carries a date key: a publication date where the publisher states one, otherwise an explicit null with the reason on the record.

    unreviewed history →
  342. project Publication date recorded for 4 sources SCATS — Sydney Coordinated Adaptive Traffic System

    Every source on this entry now carries a date key: a publication date where the publisher states one, otherwise an explicit null with the reason on the record.

    unreviewed history →
  343. project Publication date recorded for 5 sources Seine Bathing-Water Sensing & Public Swimming Return

    Every source on this entry now carries a date key: a publication date where the publisher states one, otherwise an explicit null with the reason on the record.

    unreviewed history →
  344. project Publication date recorded for 4 sources Shenzhen Digital Enterprise Carbon Account & Green Credit Platform

    Every source on this entry now carries a date key: a publication date where the publisher states one, otherwise an explicit null with the reason on the record.

    unreviewed history →
  345. project Publication date recorded for 4 sources Smart City 2030 — Wiesbaden Goes Smart

    Every source on this entry now carries a date key: a publication date where the publisher states one, otherwise an explicit null with the reason on the record.

    unreviewed history →
  346. project Publication date recorded for 6 sources Smart Energy City: Real-Time Energy Monitoring in Norra Djurgårdsstaden

    Every source on this entry now carries a date key: a publication date where the publisher states one, otherwise an explicit null with the reason on the record.

    unreviewed history →
  347. project Record revised Smart Nation Initiative

    Every source on this entry now carries a date key: a publication date where the publisher states one, otherwise an explicit null with the reason on the record.

    unreviewed history →
  348. project Publication date recorded for 4 sources Smarter Together Munich

    Every source on this entry now carries a date key: a publication date where the publisher states one, otherwise an explicit null with the reason on the record.

    unreviewed history →
  349. project Publication date recorded for 4 sources Sohjoa / Sohjoa Baltic Autonomous Minibus Pilots

    Every source on this entry now carries a date key: a publication date where the publisher states one, otherwise an explicit null with the reason on the record.

    unreviewed history →
  350. project Publication date recorded for 4 sources Suishenban: One Network for All Government Services

    Every source on this entry now carries a date key: a publication date where the publisher states one, otherwise an explicit null with the reason on the record.

    unreviewed history →
  351. project Publication date recorded for 4 sources Tallinn Mobile Parking Payment (m-Parking)

    Every source on this entry now carries a date key: a publication date where the publisher states one, otherwise an explicit null with the reason on the record.

    unreviewed history →
  352. project Record revised Tokyo Digital Twin

    Every source on this entry now carries a date key: a publication date where the publisher states one, otherwise an explicit null with the reason on the record.

    unreviewed history →
  353. project Publication date recorded for 5 sources TraceTogether & SafeEntry Digital Contact Tracing

    Every source on this entry now carries a date key: a publication date where the publisher states one, otherwise an explicit null with the reason on the record.

    unreviewed history →
  354. project Record revised TransMilenio Zero-Emission Electric Bus Fleet

    Every source on this entry now carries a date key: a publication date where the publisher states one, otherwise an explicit null with the reason on the record.

    unreviewed history →
  355. project Publication date recorded for 5 sources Tsunami-Alert Automatic Tide Gate Closure

    Every source on this entry now carries a date key: a publication date where the publisher states one, otherwise an explicit null with the reason on the record.

    unreviewed history →
  356. project Publication date recorded for 5 sources VinclesBCN — Tablets Against Unwanted Loneliness

    Every source on this entry now carries a date key: a publication date where the publisher states one, otherwise an explicit null with the reason on the record.

    unreviewed history →
  357. project Publication date recorded for 4 sources Water Intelligent Network (WIN) Leak Monitoring

    Every source on this entry now carries a date key: a publication date where the publisher states one, otherwise an explicit null with the reason on the record.

    unreviewed history →
  358. project Publication date recorded for 7 sources Zhujiang New Town Automated People Mover (APM)

    Every source on this entry now carries a date key: a publication date where the publisher states one, otherwise an explicit null with the reason on the record.

    unreviewed history →
  359. project Record revised FloodNet street-level flood sensors

    Record the study date from the article rather than from a registry lookup.

    unreviewed history →
  360. project Record revised Green Line Train Protection System

    The Globe report has now been read; the note says what it carries instead of that it was not read.

    unreviewed history →
  361. project Publication date recorded for 5 sources Mi Teleférico Cable Car Network & Contactless Ticketing

    Read the IDB release in full and record what it states; date the remaining sources or record an explicit null.

    unreviewed history →
  362. project Publication date recorded for 5 sources Shanghai New Energy Vehicle Data Monitoring Centre

    Date the reporting to the month the publisher states and record an explicit null for the wiki entry.

    unreviewed history →
  363. project 1 claim added Suihaoban Digital Government Super-App

    Drop a launch day that only a continuously edited wiki carries; the city itself says March 2020. Date both anniversary reports from the publisher.

    unreviewed history →
  364. project Publication date recorded for 4 sources Tap&Go Cashless Urban Transit Network

    Date the press sources from the publishers themselves.

    unreviewed history →
  365. project Publication date recorded for 5 sources VBZ «Self-e» Automated Shuttle Trial

    Date the trial report from the publisher itself.

    unreviewed history →
  366. project Publication date recorded for 4 sources Weight-Based Food Waste Fee (RFID Smart Bins)

    Record the study date from the article rather than from a registry lookup.

    unreviewed history →
  367. project Publication date recorded for 5 sources Whim — Mobility-as-a-Service App

    Date the bankruptcy and acquisition reports from the publishers themselves.

    unreviewed history →
  368. project Record revised Alexandria's Sea-Level Gauges and the Tsunami-Ready Chain

    Record the verbatim locator for the recognition ceremony and the twelve indicators.

    unreviewed history →
  369. project Record revised Array of Things

    Remove a source that does not carry the successor network it was cited for, and describe what that page does carry.

    unreviewed history →
  370. project 2 claims added Automated Camera Enforcement (ACE) on buses

    Attribute the recidivism figure to the evaluation the comptroller names, replace "reproduced" with what the report actually does, and date the two operator releases from the pages themselves.

    unreviewed history →
  371. project Publication date recorded for 9 sources Beijing Electronic Roadside Parking Charges

    Record verbatim locators for the payment and arrears windows and separate what each source carries.

    unreviewed history →
  372. project 2 claims added CityScore Performance Dashboard

    Drop the inferred fiscal year: the city names "the next City budget" and no source names which one.

    unreviewed history →
  373. project Publication date recorded for 6 sources FloodNet street-level flood sensors

    Date the partner announcement from the page itself and state plainly which sources carry no publication date.

    unreviewed history →
  374. project Record revised GRAP: Air Quality Readings as a Legal Trigger

    Date the independent analysis from the page and record the verbatim locator for the count of late invocations.

    unreviewed history →
  375. project Publication date recorded for 11 sources LinkNYC

    State plainly which of the standing programme pages carry no publication date.

    unreviewed history →
  376. project Publication date recorded for 9 sources Regulating Dockless Bike-Share by Data: Monitoring Platform & Electronic Fences

    Date the transport commission disclosure from the publisher and record the verbatim locator for the 2024 ridership figures.

    unreviewed history →
  377. project Publication date recorded for 6 sources Alexandria's Sea-Level Gauges and the Tsunami-Ready Chain

    Dated every source. The Ocean Science paper from its own publication line; the IOC announcement recorded as undated because it is behind a CAPTCHA no client gets past; the Tsunami Ready page's first-of-month JSON-LD stamp rejected as a CMS artefact.

    unreviewed history →
  378. project Publication date recorded for 1 source Bengaluru Adaptive Traffic Control System

    Read the launch report and the amber-phase complaint in full and dated both; the Deccan Herald date now follows the publisher's own local day.

    unreviewed history →
  379. project Publication date recorded for 10 sources Building Energy Performance Standards and the benchmarking behind them

    Dated every source: the two D.C. laws from their own effective dates, the DOEE release from its dateline, and four standing operator pages as explicit nulls.

    unreviewed history →
  380. project Publication date recorded for 5 sources GEPTIS: Bengaluru's Geospatial Property Tax Map

    Read the February 2026 audit report in full and recorded that rather than a search-result confirmation.

    unreviewed history →
  381. project Publication date recorded for 7 sources Namma Metro Yellow Line: A Finished Line Waiting for Its Trains

    Read the ridership report and the Railway Gazette report in full; corrected the ridership source's date to the publisher's local day and removed a headway figure its note attributed to it.

    unreviewed history →
  382. project 1 source removed Number Coding: Metro Manila's Plate-Based Driving Ban

    Read the three Rappler reports and the Inquirer report in full and dated them. Dropped the Philippine News Agency article: it is behind a CAPTCHA no route gets past, and it only corroborated what GMA News and the Manila Bulletin already carry.

    unreviewed history →
  383. project 6 claims added CCIMU: One Room for Signals, Buses and Plates — and Two-Thirds of the Signal Park Outside It

    Re-read the four sources that had been verified only through search results. Camera, signal and contract figures confirmed verbatim, the 2022 opening re-dated to the day, and every source given a date.

    unreviewed history →
  384. project 3 sources removed CGE: São Paulo's rain alerts and street-level flood-point map

    Re-read every CGE page and the SAISP page in full; dropped three sources that are dead or no longer carry the cited content, dated the rest, and attributed the station and gauge counts to the pages that actually state them.

    unreviewed history →
  385. project 3 sources removed Comlurb's Tracked Waste Collection Fleet

    Re-read every source in full. The operator page does not mention GPS at all, so the framing now follows what it says; the tracking duty is traced to state Lei 6.862/2014; three unused Gramacho sources removed and every source dated.

    unreviewed history →
  386. project 1 source added Green Line Train Protection System

    Re-read the board paper and the operator page in full. Removed an invented 'Cenelec SIL-4' attribution, added the contractual Phase 1 date of March 2027 and the total project budget, replaced two dead sources and dated the rest.

    unreviewed history →
  387. project 1 source added Milan Citywide LED Public Lighting Retrofit

    Re-read both sources in full. The operator page had been cited from a cached search extract carrying figures it does not contain; its URL, note and date are corrected and the ANSA report is dated.

    unreviewed history →
  388. project 9 claims added TfL Lane Rental Scheme

    Re-read all four sources in full. The innovation-fund figures were wrong — £19m across almost 73 schemes, not over £20m across roughly 75 — the start month and the 'red route' framing were unsourced, and 'all revenue' should have read 'surplus'. Every source now carries a date.

    unreviewed history →
  389. project Entered the record IC3 Integrated Safe City Command Centre

    Created the first structured Evidence Passport with 7 claims and 5 source dossiers.

    unreviewed history →
  390. project Entered the record Milan Citywide LED Public Lighting Retrofit

    Created the first structured Evidence Passport with 8 claims and 2 source dossiers.

    unreviewed history →
  391. project Entered the record Automated Port Shore Power Matrix

    Created the first structured Evidence Passport with 8 claims and 3 source dossiers.

    unreviewed history →
  392. project Entered the record Port of Rotterdam IoT & Hydro/Meteo Platform

    Created the first structured Evidence Passport with 9 claims and 3 source dossiers.

    unreviewed history →
  393. project Entered the record Rome Smart Water Network (Acea Ato 2)

    Created the first structured Evidence Passport with 10 claims and 3 source dossiers.

    unreviewed history →
  394. project Entered the record Seine Bathing-Water Sensing & Public Swimming Return

    Created the first structured Evidence Passport with 8 claims and 5 source dossiers.

    unreviewed history →
  395. project Entered the record Suishenban: One Network for All Government Services

    Created the first structured Evidence Passport with 7 claims and 4 source dossiers.

    unreviewed history →
  396. project Entered the record Automated LED Smart Streetlight Mesh

    Created the first structured Evidence Passport with 6 claims and 2 source dossiers.

    unreviewed history →
  397. project Entered the record Citywide Smart Water Meter Rollout

    Created the first structured Evidence Passport with 6 claims and 2 source dossiers.

    unreviewed history →
  398. project Entered the record Nama Water SCADA Distribution Network

    Created the first structured Evidence Passport with 6 claims and 2 source dossiers.

    unreviewed history →
  399. project Entered the record PMPML's All-Green Bus Fleet & Command Control Centre

    Created the first structured Evidence Passport with 6 claims and 2 source dossiers.

    unreviewed history →
  400. project Entered the record Zhujiang New Town Automated People Mover (APM)

    Created the first structured Evidence Passport with 18 claims and 7 source dossiers.

    unreviewed history →
  401. project Entered the record Centro de Operações do Recife (COP)

    Created the first structured Evidence Passport with 6 claims and 5 source dossiers.

    unreviewed history →
  402. project Entered the record Digital Infrastructure Strategic Framework (DISF)

    Created the first structured Evidence Passport with 6 claims and 5 source dossiers.

    unreviewed history →
  403. project Entered the record Metroplús Bus Rapid Transit (BRT) & Fleet Telematics

    Created the first structured Evidence Passport with 6 claims and 5 source dossiers.

    unreviewed history →
  404. project Entered the record Miami Forever flood-resilience program

    Created the first structured Evidence Passport with 5 claims and 5 source dossiers.

    unreviewed history →
  405. project Entered the record Nirbhaya CCTV & ANPR Surveillance Network (Kolkata Police)

    Created the first structured Evidence Passport with 6 claims and 5 source dossiers.

    unreviewed history →
  406. project Entered the record Abu Dhabi Digital Twin (LivAI)

    Created the first structured Evidence Passport with 6 claims and 5 source dossiers.

    unreviewed history →
  407. project Entered the record Alexandria's Sea-Level Gauges and the Tsunami-Ready Chain

    Created the first structured Evidence Passport with 9 claims and 6 source dossiers.

    unreviewed history →
  408. project Entered the record Busan's 16 District CCTV Integrated Control Centres

    Created the first structured Evidence Passport with 7 claims and 6 source dossiers.

    unreviewed history →
  409. project Entered the record Punggol Digital District Open Digital Platform & Smart Grid

    Created the first structured Evidence Passport with 8 claims and 3 source dossiers.

    unreviewed history →
  410. project Entered the record Smart Energy City: Real-Time Energy Monitoring in Norra Djurgårdsstaden

    Created the first structured Evidence Passport with 6 claims and 6 source dossiers.

    unreviewed history →
  411. project Entered the record AccraMobile: Mapping the Trotro Network

    Created the first structured Evidence Passport with 7 claims and 6 source dossiers.

    unreviewed history →
  412. project Entered the record AT HOP Contactless Smartcard Ticketing

    Created the first structured Evidence Passport with 7 claims and 6 source dossiers.

    unreviewed history →
  413. project Entered the record Kultur-Token

    Created the first structured Evidence Passport with 9 claims and 3 source dossiers.

    unreviewed history →
  414. project Entered the record Marina Bay District Cooling Network

    Created the first structured Evidence Passport with 7 claims and 3 source dossiers.

    unreviewed history →
  415. project Entered the record PUB Smart Water Grid & Leak-Detection Sensor Network

    Created the first structured Evidence Passport with 8 claims and 3 source dossiers.

    unreviewed history →
  416. project Entered the record Confluence Smarter Together Energy Grid

    Created the first structured Evidence Passport with 7 claims and 3 source dossiers.

    unreviewed history →
  417. project Entered the record Energy-Autonomous Wastewater Plant Kaditz

    Created the first structured Evidence Passport with 9 claims and 3 source dossiers.

    unreviewed history →
  418. project Entered the record Guangzhou Public Data Open Platform

    Created the first structured Evidence Passport with 7 claims and 3 source dossiers.

    unreviewed history →
  419. project Entered the record LärmLAB Noise & Environment Network

    Created the first structured Evidence Passport with 9 claims and 3 source dossiers.

    unreviewed history →
  420. project Entered the record Oahu Rooftop Solar Saturation and Advanced Meters

    Created the first structured Evidence Passport with 7 claims and 4 source dossiers.

    unreviewed history →
  421. project Entered the record Dallas OpenData Portal

    Created the first structured Evidence Passport with 6 claims and 3 source dossiers.

    unreviewed history →
  422. project Entered the record Drone Fly-Tipping Detection & Enforcement

    Created the first structured Evidence Passport with 7 claims and 4 source dossiers.

    unreviewed history →
  423. project Entered the record Freetown the Treetown Mobile Token System

    Created the first structured Evidence Passport with 9 claims and 5 source dossiers.

    unreviewed history →
  424. project Entered the record iAM Smart Digital Identity & Single Sign-On

    Created the first structured Evidence Passport with 8 claims and 3 source dossiers.

    unreviewed history →
  425. project Entered the record Klimastraße Cologne-Nippes

    Created the first structured Evidence Passport with 10 claims and 3 source dossiers.

    unreviewed history →
  426. project Entered the record Carris Real-Time Bus & Tram Tracking

    Created the first structured Evidence Passport with 9 claims and 7 source dossiers.

    unreviewed history →
  427. project Entered the record Glasgow Operations Centre

    Created the first structured Evidence Passport with 9 claims and 7 source dossiers.

    unreviewed history →
  428. project Entered the record Jakarta Neighbourhood Flood Sirens and Sensor Posts

    Created the first structured Evidence Passport with 8 claims and 7 source dossiers.

    unreviewed history →
  429. project Entered the record Katri Vala Heat Pump Plant

    Created the first structured Evidence Passport with 7 claims and 3 source dossiers.

    unreviewed history →
  430. project Entered the record Water Intelligent Network (WIN) Leak Monitoring

    Created the first structured Evidence Passport with 10 claims and 4 source dossiers.

    unreviewed history →
  431. project Entered the record CCIMU: One Room for Signals, Buses and Plates — and Two-Thirds of the Signal Park Outside It

    Created the first structured Evidence Passport with 8 claims and 7 source dossiers.

    unreviewed history →
  432. project Entered the record Integrated Command and Control Centre (ICCC)

    Created the first structured Evidence Passport with 7 claims and 3 source dossiers.

    unreviewed history →
  433. project Entered the record Shenzhen Digital Enterprise Carbon Account & Green Credit Platform

    Created the first structured Evidence Passport with 8 claims and 4 source dossiers.

    unreviewed history →
  434. project Entered the record Suihaoban Digital Government Super-App

    Created the first structured Evidence Passport with 5 claims and 4 source dossiers.

    unreviewed history →
  435. project Entered the record Xiaoshan Airport Facial-Recognition Security & One-ID Travel

    Created the first structured Evidence Passport with 11 claims and 4 source dossiers.

    unreviewed history →
  436. project Entered the record +CityxChange

    Created the first structured Evidence Passport with 5 claims and 4 source dossiers.

    unreviewed history →
  437. project Entered the record CityScore Performance Dashboard

    Created the first structured Evidence Passport with 4 claims and 3 source dossiers.

    unreviewed history →
  438. project Entered the record DigiTel Resident Card

    Created the first structured Evidence Passport with 5 claims and 4 source dossiers.

    unreviewed history →
  439. project Entered the record Railbelt Battery Storage & Fire Island Wind Integration

    Created the first structured Evidence Passport with 4 claims and 3 source dossiers.

    unreviewed history →
  440. project Entered the record Smart City 2030 — Wiesbaden Goes Smart

    Created the first structured Evidence Passport with 5 claims and 4 source dossiers.

    unreviewed history →
  441. project Entered the record Building Energy Performance Standards and the benchmarking behind them

    Created the first structured Evidence Passport with 8 claims and 10 source dossiers.

    unreviewed history →
  442. project Entered the record CGE: São Paulo's rain alerts and street-level flood-point map

    Created the first structured Evidence Passport with 7 claims and 11 source dossiers.

    unreviewed history →
  443. project Entered the record LUUP Shared E-Scooters & E-Assist Bikes

    Created the first structured Evidence Passport with 7 claims and 4 source dossiers.

    unreviewed history →
  444. project Entered the record S-Pole — Multipurpose Smart Streetlight Network

    Created the first structured Evidence Passport with 7 claims and 4 source dossiers.

    unreviewed history →
  445. project Entered the record Tallinn Mobile Parking Payment (m-Parking)

    Created the first structured Evidence Passport with 5 claims and 4 source dossiers.

    unreviewed history →
  446. project Entered the record Comlurb's Tracked Waste Collection Fleet

    Created the first structured Evidence Passport with 7 claims and 8 source dossiers.

    unreviewed history →
  447. project Entered the record HCMC Intelligent Traffic Control Center

    Created the first structured Evidence Passport with 5 claims and 4 source dossiers.

    unreviewed history →
  448. project Entered the record Nansha Port Phase IV Automated Container Terminal

    Created the first structured Evidence Passport with 8 claims and 4 source dossiers.

    unreviewed history →
  449. project Entered the record Number Coding: Metro Manila's Plate-Based Driving Ban

    Created the first structured Evidence Passport with 6 claims and 11 source dossiers.

    unreviewed history →
  450. project Entered the record RTA Smart Parking: Sensor-Guided Vacant-Space Finder

    Created the first structured Evidence Passport with 4 claims and 4 source dossiers.

    unreviewed history →
  451. project Entered the record Mi Teleférico Cable Car Network & Contactless Ticketing

    Created the first structured Evidence Passport with 6 claims and 5 source dossiers.

    unreviewed history →
  452. project Entered the record Smarter Together Munich

    Created the first structured Evidence Passport with 6 claims and 4 source dossiers.

    unreviewed history →
  453. project Entered the record Sohjoa / Sohjoa Baltic Autonomous Minibus Pilots

    Created the first structured Evidence Passport with 5 claims and 4 source dossiers.

    unreviewed history →
  454. project Entered the record Suvilahti Solar Power Plant (Panel Rental)

    Created the first structured Evidence Passport with 7 claims and 4 source dossiers.

    unreviewed history →
  455. project Entered the record TfL Lane Rental Scheme

    Created the first structured Evidence Passport with 7 claims and 4 source dossiers.

    unreviewed history →
  456. project Entered the record Dubai Metro

    Created the first structured Evidence Passport with 7 claims and 5 source dossiers.

    unreviewed history →
  457. project Entered the record GeniLac Lake-Water Thermal Grid

    Created the first structured Evidence Passport with 7 claims and 4 source dossiers.

    unreviewed history →
  458. project Entered the record New Administrative Capital

    Created the first structured Evidence Passport with 8 claims and 6 source dossiers.

    unreviewed history →
  459. project Entered the record Open Transit Data Portal & Live Bus Feeds

    Created the first structured Evidence Passport with 8 claims and 4 source dossiers.

    unreviewed history →
  460. project Entered the record Tata Power-DDL Metered Grid & Loss Reduction, North Delhi

    Created the first structured Evidence Passport with 7 claims and 4 source dossiers.

    unreviewed history →
  461. project Entered the record BA Elige: Buenos Aires's Online Participatory Budget

    Created the first structured Evidence Passport with 10 claims and 9 source dossiers.

    unreviewed history →
  462. project Entered the record DEWA Smart Grid: Advanced Metering & Self-Healing Restoration

    Created the first structured Evidence Passport with 8 claims and 6 source dossiers.

    unreviewed history →
  463. project Entered the record Green Line Train Protection System

    Created the first structured Evidence Passport with 8 claims and 11 source dossiers.

    unreviewed history →
  464. project Entered the record Shanghai's Virtual Power Plant demand response

    Created the first structured Evidence Passport with 8 claims and 5 source dossiers.

    unreviewed history →
  465. project Entered the record Telemanaged Smart Irrigation of Parks & Green Spaces

    Created the first structured Evidence Passport with 7 claims and 4 source dossiers.

    unreviewed history →
  466. project Entered the record Multi-Pole-in-One Street Furniture Consolidation

    Created the first structured Evidence Passport with 9 claims and 5 source dossiers.

    unreviewed history →
  467. project Entered the record Recicla Lima

    Created the first structured Evidence Passport with 8 claims and 5 source dossiers.

    unreviewed history →
  468. project Entered the record Tallinn Self-Driving Shuttle Pilots

    Created the first structured Evidence Passport with 11 claims and 5 source dossiers.

    unreviewed history →
  469. project Entered the record TOKYO Data Highway Smart Pole Network

    Created the first structured Evidence Passport with 7 claims and 5 source dossiers.

    unreviewed history →
  470. project Entered the record VBZ «Self-e» Automated Shuttle Trial

    Created the first structured Evidence Passport with 9 claims and 5 source dossiers.

    unreviewed history →
  471. project Entered the record Compass Card Contactless Fare Payment

    Created the first structured Evidence Passport with 10 claims and 7 source dossiers.

    unreviewed history →
  472. project Entered the record Ecobici Bike Share

    Created the first structured Evidence Passport with 8 claims and 7 source dossiers.

    unreviewed history →
  473. project Entered the record MVG Rad Bike-Share

    Created the first structured Evidence Passport with 10 claims and 6 source dossiers.

    unreviewed history →
  474. project Entered the record Seoul's Digital Water Meter Rollout

    Created the first structured Evidence Passport with 11 claims and 5 source dossiers.

    unreviewed history →
  475. project Entered the record Thames Water Smart Metering & AI Leak Detection

    Created the first structured Evidence Passport with 9 claims and 5 source dossiers.

    unreviewed history →
  476. project Entered the record Bengaluru Urban Flood Early-Warning Network

    Created the first structured Evidence Passport with 8 claims and 5 source dossiers.

    unreviewed history →
  477. project Entered the record MVGO: MVG's Multimodal Mobility App

    Created the first structured Evidence Passport with 9 claims and 7 source dossiers.

    unreviewed history →
  478. project Entered the record Signalen: Open-Source Public-Space Reporting Platform

    Created the first structured Evidence Passport with 11 claims and 6 source dossiers.

    unreviewed history →
  479. project Entered the record SWM Citywide LoRaWAN IoT Network

    Created the first structured Evidence Passport with 9 claims and 5 source dossiers.

    unreviewed history →
  480. project Entered the record Ülemiste City Smart Business District

    Created the first structured Evidence Passport with 11 claims and 6 source dossiers.

    unreviewed history →
  481. project Entered the record Delhi Metro's Driverless Lines: Magenta & Pink

    Created the first structured Evidence Passport with 11 claims and 6 source dossiers.

    unreviewed history →
  482. project Entered the record Mandatory Air Quality Sensors at Mumbai Construction Sites

    Created the first structured Evidence Passport with 10 claims and 6 source dossiers.

    unreviewed history →
  483. project Entered the record ORDEN Regional Data Platform and my door OSAKA

    Created the first structured Evidence Passport with 10 claims and 6 source dossiers.

    unreviewed history →
  484. project Entered the record Oslo's Time- and Emission-Differentiated Toll Ring

    Created the first structured Evidence Passport with 12 claims and 8 source dossiers.

    unreviewed history →
  485. project Entered the record Shanghai Metro's Driverless GoA4 Lines

    Created the first structured Evidence Passport with 10 claims and 6 source dossiers.

    unreviewed history →
  486. project Entered the record Beijing's Financial Public Data Zone

    Created the first structured Evidence Passport with 9 claims and 6 source dossiers.

    unreviewed history →
  487. project Entered the record Bengaluru Potable-Water Restrictions and Reuse Rules

    Created the first structured Evidence Passport with 12 claims and 10 source dossiers.

    unreviewed history →
  488. project Entered the record Delhi EV Policy & Discom-Tendered Public Charging

    Created the first structured Evidence Passport with 10 claims and 6 source dossiers.

    unreviewed history →
  489. project Entered the record DTC Electric Bus Fleet & DEVi Feeder Service

    Created the first structured Evidence Passport with 11 claims and 8 source dossiers.

    unreviewed history →
  490. project Entered the record Mumbai Climate Action Plan

    Created the first structured Evidence Passport with 13 claims and 8 source dossiers.

    unreviewed history →
  491. project Entered the record Doorstep Delivery of Public Services

    Created the first structured Evidence Passport with 12 claims and 6 source dossiers.

    unreviewed history →
  492. project Entered the record Lakes Monitoring System and the Kere Mitra Volunteers

    Created the first structured Evidence Passport with 11 claims and 6 source dossiers.

    unreviewed history →
  493. project Entered the record Namma Yatri Zero-Commission Ride Hailing

    Created the first structured Evidence Passport with 10 claims and 6 source dossiers.

    unreviewed history →
  494. project Entered the record Yanfang Line: Driverless Metro on Home-Grown Signalling

    Created the first structured Evidence Passport with 11 claims and 6 source dossiers.

    unreviewed history →
  495. project Entered the record Beijing Electronic Roadside Parking Charges

    Created the first structured Evidence Passport with 12 claims and 9 source dossiers.

    unreviewed history →
  496. project Entered the record Beijing High-Level Autonomous Driving Demonstration Area (Yizhuang)

    Created the first structured Evidence Passport with 11 claims and 8 source dossiers.

    unreviewed history →
  497. project Entered the record Mandatory Waste Sorting & Its Smart-Bin Layer

    Created the first structured Evidence Passport with 12 claims and 10 source dossiers.

    unreviewed history →
  498. project Entered the record Regulating Dockless Bike-Share by Data: Monitoring Platform & Electronic Fences

    Created the first structured Evidence Passport with 11 claims and 9 source dossiers.

    unreviewed history →
  499. project Entered the record BMTC Bus Tracking and Open Transit Data

    Created the first structured Evidence Passport with 11 claims and 7 source dossiers.

    unreviewed history →
  500. project Entered the record Mumbai One Integrated Ticketing App

    Created the first structured Evidence Passport with 11 claims and 7 source dossiers.

    unreviewed history →
  501. project Entered the record Shanghai Public Data Open Platform & SODA Contest

    Created the first structured Evidence Passport with 10 claims and 7 source dossiers.

    unreviewed history →
  502. project Entered the record Zero-Emission Freight Zone with ANPR Enforcement

    Created the first structured Evidence Passport with 11 claims and 7 source dossiers.

    unreviewed history →
  503. project Publication date recorded for 7 sources Osaka Metro Walk-Through Facial Recognition Gates

    Renamed the operator press-release source so its label carries the publication date (11 March 2025) rather than the service start date (25 March 2025), which check-consistency flagged as a date conflict.

    unreviewed history →
  504. project 12 claims added 22@ Barcelona Innovation District

    Full claim mapping over snippet, impact and lesson; sourced impact and lesson added; source dates and attributions corrected from the same reading.

    unreviewed history →
  505. project Evidence grade changed: peer-reviewed → independent Nova Xarxa Orthogonal Bus Network

    Full claim mapping over snippet, impact and lesson; sourced impact and lesson added; source dates and attributions corrected from the same reading.

    unreviewed history →
  506. project 9 claims added Superblock Sant Antoni

    Full claim mapping over snippet, impact and lesson; sourced impact and lesson added; source dates and attributions corrected from the same reading.

    unreviewed history →
  507. project 9 claims added ZBE Rondes de Barcelona Low Emission Zone

    Full claim mapping over snippet, impact and lesson; sourced impact and lesson added; source dates and attributions corrected from the same reading.

    unreviewed history →
  508. project Evidence grade changed: independent → media Copenhagen's Real-Time Building Energy & Water Surveillance System

    Full claim mapping over snippet, impact and lesson; sourced impact and lesson added; source dates recorded.

    unreviewed history →
  509. project 13 claims added Grand Paris Low-Emission Zone (ZFE-m)

    Full claim mapping over snippet, impact and lesson; sourced impact and lesson added; source dates recorded.

    unreviewed history →
  510. project 1 source added High-density air-quality monitoring and source-apportionment network

    Full claim mapping over snippet, impact and lesson; sourced impact and lesson added; unverifiable PM2.5 figure pair withdrawn and replaced with the monitoring centre's own reported series; source dates recorded and the entry re-read.

    unreviewed history →
  511. project Evidence grade changed: independent → media Kashiwa-no-ha Smart City

    Full claim mapping over snippet, impact and lesson; sourced impact and lesson added; source dates recorded.

    unreviewed history →
  512. project Entered the record Prepaid Smart Water Meter Rollout

    Created the first structured Evidence Passport with 15 claims and 8 source dossiers.

    unreviewed history →
  513. project Entered the record Stratumseind Living Lab — Adaptive Nightlife Lighting

    Created the first structured Evidence Passport with 10 claims and 9 source dossiers.

    unreviewed history →
  514. project 6 claims added e-Health Surabaya — Online Queueing for Public Clinics

    Added a six-claim evidence mapping and a sourced lesson; the 63-clinic figure is now attributed to the evaluation that states it rather than to the city explainer that does not, and the impact carries the evaluation's full list of shortcomings, including that the clinic staffs a person to operate the kiosk.

    unreviewed history →
  515. project 5 claims added Mumbai Water Distribution Improvement Programme

    Added a five-claim evidence mapping and a sourced lesson; the impact now carries the wind-up terms and the state of the network afterwards alongside the audit's 18.60 per cent.

    unreviewed history →
  516. project 6 claims added National Steps Challenge & HealthHub Digital Health

    Added a six-claim evidence mapping and a sourced lesson; the impact now carries the study's maintenance-phase increase (934 steps) and median engagement (74 days) beside the headline 1,579, which is the part that says how long the effect lasted.

    unreviewed history →
  517. project 6 claims added Oslo Climate Budget

    Added a six-claim evidence mapping and a sourced lesson; the 2030 projection is now the single figure its source states (65 per cent) rather than a range, and the entry records that the emissions account behind the 28 per cent is the national environment agency's, not the city's.

    unreviewed history →
  518. project 7 claims added S-DoT — Smart Seoul Data of Things Sensor Network

    Added an eight-claim evidence mapping and a sourced lesson; corrected a quotation that had merged two sentences of the study (the wall-mounted sensors 'could not represent the surrounding areas', not 'the surrounding local climate zones'), added the wall-station count and the resolution comparison, and corrected the city announcement's date from 2021-03-06 to the 3 June 2021 the page itself gives.

    unreviewed history →
  519. project 5 claims added Lyon Confluence

    Added a five-claim evidence mapping and a sourced lesson; the Lyon-only figures are now anchored on the paper's own section, read through the publisher's PDF host, and the entry says in the lesson why the widely quoted 37.6 kWh/m2a belongs to the three cities together.

    unreviewed history →
  520. project 1 source added Free Public Transport for Registered Residents

    Added a six-claim evidence mapping and a sourced lesson; replaced registration and income-tax figures whose source no longer answers with the mechanism as an international-organisation case study states it, and gave the impact the peer-reviewed measurement (public transport use up 14 per cent) together with the authors' own explanation for why the effect is small.

    unreviewed history →
  521. project 5 claims added Helsinki 3D+ Open City Model

    Added a five-claim evidence mapping and a sourced lesson; replaced an 80,000-building figure that no cited source states with the city's own description of the atlas — an indicative consumption estimate for nearly every building and solar calculations for nearly a million roof and wall surfaces — and added the semantic-identifier property that makes the model joinable.

    unreviewed history →
  522. project Evidence grade changed: independent → media BudapestGO Mobility Platform Integration

    Added a seven-claim evidence mapping and a sourced lesson; corrected the attribution of the adoption figures, which are Mastercard's and not the transport authority's, and recorded that the EU best-practice page naming the monthly user figures lists the transport authority itself as the submitting organisation. Evidence grade moved from independent to media.

    unreviewed history →
  523. project Evidence grade changed: peer-reviewed → media Shanghai New Energy Vehicle Data Monitoring Centre

    Added a seven-claim evidence mapping and a sourced lesson; rebuilt the impact on the 2018 investigation's own counts and on the current measures' disclosure duty, and withdrew cumulative vehicle and battery figures that were attributed to a paper the publisher does not let us retrieve and whose abstract does not carry them. Evidence grade moved from peer-reviewed to media accordingly.

    unreviewed history →
  524. project Entered the record Citywide CCTV Rollout and Delhi Police Facial Recognition

    Created the first structured Evidence Passport with 8 claims and 8 source dossiers.

    unreviewed history →
  525. project 5 claims added EPB Gig City — Fiber-Optic Smart Grid & Community Broadband

    Replaced the single legacy claim with a complete claim array covering every material assertion in snippet, impact and lesson; added a sourced lesson, dated the sources and replaced dead ones.

    unreviewed history →
  526. project 2 sources added GRAP: Air Quality Readings as a Legal Trigger

    Replaced the single legacy claim with a complete claim array covering every material assertion in snippet, impact and lesson; added a sourced lesson, dated the sources and replaced dead ones.

    unreviewed history →
  527. project 7 claims added Rio Operations Center (COR)

    Replaced the single legacy claim with a complete claim array covering every material assertion in snippet, impact and lesson; added a sourced lesson, dated the sources and replaced dead ones.

    unreviewed history →
  528. project 1 source added Smart Kalasatama

    Replaced the single legacy claim with a complete claim array covering every material assertion in snippet, impact and lesson; added a sourced lesson, dated the sources and replaced dead ones.

    unreviewed history →
  529. project Entered the record TransMilenio Zero-Emission Electric Bus Fleet

    Created the first structured Evidence Passport with 6 claims and 4 source dossiers.

    unreviewed history →
  530. project 5 claims added VinclesBCN — Tablets Against Unwanted Loneliness

    Added a five-claim evidence mapping and a sourced lesson; put the milestone dates on the city's own timeline (award autumn 2014, pilot November 2016 to June 2017, a thousand users December 2018, 3,067 users and 198 groups December 2021) and gave the impact the study's non-use finding, which is the part that says who the service did not reach; removed a publication date on the living timeline page, which carried a year the page only mentions.

    unreviewed history →
  531. project 7 claims added Hyperlocal Air Mapping: Sensor Network and Mobile Monitoring

    Added a seven-claim evidence mapping and a sourced lesson.

    unreviewed history →
  532. project Evidence grade changed: independent → official Copenhagen's LED Streetlight Retrofit & Remote Control Network

    Added a nine-claim evidence mapping and a sourced lesson; corrected the committee minutes' date from 2013-02-25, which is a meeting the minutes merely refer to, to the meeting they record on 2013-11-04; separated the contractually guaranteed 57 per cent saving from the more-than-55 per cent the city later claimed, recorded the city's own note that the saving since 2010 comes from two programmes, and moved the evidence grade from independent to official because every figure is the city's own.

    unreviewed history →
  533. project 1 source added Madrid Central / Madrid 360 Low-Emission Zone

    Added a seven-claim evidence mapping and a sourced lesson; replaced a wholly qualitative impact with the measured NO2 record (22 of 24 stations down in 2019 against the 2010-2018 mean, Plaza del Carmen down 10 micrograms or 22 per cent and under the legal limit for the first time, 10 per cent citywide) and corrected the peer-reviewed source's journal, which is Transportation Research Part D, not Part A.

    unreviewed history →
  534. project 1 source added Low Traffic Neighbourhoods (LTNs)

    Added a six-claim evidence mapping and a sourced lesson; corrected the attribution of the 113-scheme figure, which belongs to the London dataset and a 2025 casualty study, not to the traffic meta-analysis, whose sample is 46 schemes in 11 boroughs; added that peer-reviewed casualty study and the government review's own removal and support figures.

    unreviewed history →
  535. project Entered the record Osaka Metro Walk-Through Facial Recognition Gates

    Created the first structured Evidence Passport with 10 claims and 7 source dossiers.

    unreviewed history →
  536. project 7 claims added Owl Bus (Night Bus) — Big-Data Route Design

    Added a seven-claim evidence mapping and a sourced lesson; dated the city's own page.

    unreviewed history →
  537. project 3 sources added Autolib' Electric Car-Sharing

    Added a nine-claim evidence mapping and a sourced lesson; added the outcome the entry was missing — the Paris administrative court of appeal ordered the syndicate on 21 February 2025 to pay just over 66 million euros, split across 98 municipalities by station count — and the contractual term that produced it (the first 60 million euros of losses on the operator, the rest on the municipalities pro rata). Removed a source whose page no longer exists and added three that carry the ruling and the contract terms.

    unreviewed history →
  538. project 9 claims added Jiesu Jiban: 12345 complaint hotline and district scorecards

    Added a nine-claim evidence mapping and a sourced lesson; restated the peer-reviewed finding in the study's own terms (the system creates acceleration and co-produces responsibility without accountability for the central government) in place of a paraphrase the abstract does not support; dated the 2021 regulation to the page that publishes it.

    unreviewed history →
  539. project 8 claims added Beijing License Plate Lottery & Vehicle Quota System

    Added an eight-claim evidence mapping and a sourced lesson; recorded China Daily's dating of the lottery's start to 2010 as a contradiction of the entry's 2011.

    unreviewed history →
  540. project Entered the record Dhaka WASA District Metered Areas and SCADA

    Created the first structured Evidence Passport with 19 claims and 10 source dossiers.

    unreviewed history →
  541. project Entered the record Array of Things

    Created the first structured Evidence Passport with 9 claims and 5 source dossiers.

    unreviewed history →
  542. project Entered the record Bengaluru Adaptive Traffic Control System

    Created the first structured Evidence Passport with 8 claims and 6 source dossiers.

    unreviewed history →
  543. project Entered the record Ilumina SP Centralized LED Mesh Retrofit

    Created the first structured Evidence Passport with 8 claims and 3 source dossiers.

    unreviewed history →
  544. project Entered the record Rotterdam Municipal Digital Twin

    Created the first structured Evidence Passport with 5 claims and 2 source dossiers.

    unreviewed history →
  545. project Entered the record Smart Nation Initiative

    Created the first structured Evidence Passport with 7 claims and 5 source dossiers.

    unreviewed history →
  546. project Entered the record Tokyo Digital Twin

    Created the first structured Evidence Passport with 6 claims and 3 source dossiers.

    unreviewed history →
  547. project Entered the record Algiers Intelligent Traffic Management

    Created the first structured Evidence Passport with 12 claims and 4 source dossiers.

    unreviewed history →
  548. project Entered the record Busan Urban Flood Warning System (Busan Safety ON)

    Created the first structured Evidence Passport with 10 claims and 9 source dossiers.

    unreviewed history →
  549. project Entered the record Green Wave for Cyclists (Grøn Bølge)

    Created the first structured Evidence Passport with 9 claims and 3 source dossiers.

    unreviewed history →
  550. project Entered the record Mobility Data Specification (MDS)

    Created the first structured Evidence Passport with 9 claims and 5 source dossiers.

    unreviewed history →
  551. project Entered the record Osaka Metro Open-Loop Contactless Fare Payment

    Created the first structured Evidence Passport with 7 claims and 5 source dossiers.

    unreviewed history →
  552. project Entered the record Bycyklen: Tablet-and-GPS Bike-Share

    Created the first structured Evidence Passport with 9 claims and 4 source dossiers.

    unreviewed history →
  553. project Entered the record District Smart Lighting P3 Modernization

    Created the first structured Evidence Passport with 6 claims and 5 source dossiers.

    unreviewed history →
  554. project Entered the record GEPTIS: Bengaluru's Geospatial Property Tax Map

    Created the first structured Evidence Passport with 7 claims and 5 source dossiers.

    unreviewed history →
  555. project Entered the record Open Data Zürich: CC0 Government Data Catalogue

    Created the first structured Evidence Passport with 7 claims and 5 source dossiers.

    unreviewed history →
  556. project Entered the record Tap&Go Cashless Urban Transit Network

    Created the first structured Evidence Passport with 7 claims and 4 source dossiers.

    unreviewed history →
  557. project Entered the record TraceTogether & SafeEntry Digital Contact Tracing

    Created the first structured Evidence Passport with 10 claims and 5 source dossiers.

    unreviewed history →
  558. project Entered the record Tsunami-Alert Automatic Tide Gate Closure

    Created the first structured Evidence Passport with 7 claims and 5 source dossiers.

    unreviewed history →
  559. project Entered the record Area C ANPR Automated Congestion Boundary

    Created the first structured Evidence Passport with 6 claims and 4 source dossiers.

    unreviewed history →
  560. project 9 claims added Namma Metro Yellow Line: A Finished Line Waiting for Its Trains

    Added a nine-claim evidence mapping and a sourced lesson; removed an incorrect derived multiple (the delay cost was stated as more than eight times the saving; 1,866 against 410 crore is between four and five) and replaced the line length with a rounding all three sources support; added the June 2026 fleet status.

    unreviewed history →
  561. project Entered the record Rapid Pass Fare Card and Its Clearing House

    Created the first structured Evidence Passport with 18 claims and 11 source dossiers.

    unreviewed history →
  562. project Entered the record Bangkok Flood Control Centre: Drainage Telemetry & Street-Level Forecasting

    Created the first structured Evidence Passport with 10 claims and 7 source dossiers.

    unreviewed history →
  563. project 6 claims added Eindhoven's Data Code and Sensor Register

    Added a seven-claim evidence mapping and a sourced lesson; restated the impact with the Utrecht inventory figure and the successor project's own status; recorded the IoT charter's revision date.

    unreviewed history →
  564. project Entered the record RAJUK Electronic Construction Permitting System (ECPS)

    Created the first structured Evidence Passport with 16 claims and 9 source dossiers.

    unreviewed history →
  565. project 10 claims added Addis Ababa Light Rail Transit

    Added a ten-claim evidence mapping and a sourced lesson; corrected the date of the independent 2026 assessment from 2014-01-13 to its actual posting date of 2026-05-12 and named the peer-reviewed study it summarises; restated ridership and fleet figures as the operator's own, with the independent count beside them; rewrote a source note that had been left in German.

    unreviewed history →
  566. project Entered the record Cowry Card Contactless Transit Payment

    Created the first structured Evidence Passport with 10 claims and 5 source dossiers.

    unreviewed history →
  567. project Entered the record e-Traffic Prosecution and AI Camera Enforcement

    Created the first structured Evidence Passport with 14 claims and 10 source dossiers.

    unreviewed history →
  568. project Entered the record Prepaid Electricity Metering by DPDC and DESCO

    Created the first structured Evidence Passport with 12 claims and 8 source dossiers.

    unreviewed history →
  569. project 9 claims added Shanghai Mandatory Household Waste Sorting

    Added a ten-claim evidence mapping and a sourced lesson drawing on the peer-reviewed finding that thirty years of voluntary sorting achieved little before the 2019 obligation.

    unreviewed history →
  570. project Entered the record Whim — Mobility-as-a-Service App

    Created the first structured Evidence Passport with 11 claims and 5 source dossiers.

    unreviewed history →
  571. project 9 claims added Delhi Smog Towers, Connaught Place & Anand Vihar

    Added a nine-claim evidence mapping; corrected the impact to the pollution board's own arithmetic before the tribunal (17 per cent within 100 metres, 47,229 towers for Delhi's 1,483 square kilometres) in place of a figure that conflated two IIT-Bombay measurement bands; attributed the 2023 funding halt to the environment minister who alleged it; wrote a sourced lesson; dated the 2020 Atmosphere paper.

    unreviewed history →
  572. project Entered the record Multi-Functional Smart Lamppost Blueprint

    Created the first structured Evidence Passport with 9 claims and 4 source dossiers.

    unreviewed history →
  573. project Entered the record Pre-Monsoon Aedes Larval Survey and Ward-Targeted Drives

    Created the first structured Evidence Passport with 16 claims and 13 source dossiers.

    unreviewed history →
  574. project Entered the record Digital Matatus: Nairobi's Matatu Routes Mapped into GTFS

    Created the first structured Evidence Passport with 10 claims and 6 source dossiers.

    unreviewed history →
  575. project Entered the record Sidewalk Toronto (Quayside)

    Created the first structured Evidence Passport with 8 claims and 6 source dossiers.

    unreviewed history →
  576. project Entered the record SCATS — Sydney Coordinated Adaptive Traffic System

    Created the first structured Evidence Passport with 9 claims and 4 source dossiers.

    unreviewed history →
  577. project Entered the record Weight-Based Food Waste Fee (RFID Smart Bins)

    Created the first structured Evidence Passport with 8 claims and 4 source dossiers.

    unreviewed history →
  578. project Entered the record ISKI Centralized SCADA Water Balancing Strategy

    Created the first structured Evidence Passport with 7 claims and 4 source dossiers.

    unreviewed history →
  579. project Entered the record Automated Camera Enforcement (ACE) on buses

    Created the first structured Evidence Passport with 11 claims and 7 source dossiers.

    unreviewed history →
  580. project Entered the record FloodNet street-level flood sensors

    Created the first structured Evidence Passport with 14 claims and 6 source dossiers.

    unreviewed history →
  581. project Entered the record CAMS Air Monitoring and the Degraded Air Shed Rule

    Created the first structured Evidence Passport with 17 claims and 12 source dossiers.

    unreviewed history →
  582. project Entered the record LinkNYC

    Created the first structured Evidence Passport with 14 claims and 11 source dossiers.

    unreviewed history →
  583. project Entered the record Damp Busters: Citizen-Built Damp Sensors

    Created the first structured Evidence Passport with 15 claims and 6 source dossiers.

    unreviewed history →
  584. project Entered the record Bristol Operations Centre

    Created the first structured Evidence Passport with 15 claims and 11 source dossiers.

    unreviewed history →
  585. project Entered the record Open Data Bristol: one licence stated, forty-four in the metadata

    Created the first structured Evidence Passport with 20 claims and 9 source dossiers.

    unreviewed history →
  586. project Entered the record Bristol Heat Network — District Heating the Council Built and Sold

    Created the first structured Evidence Passport with 21 claims and 12 source dossiers.

    unreviewed history →
  587. project Entered the record Think Family Database and Insight Bristol's Risk-Scoring Models

    Created the first structured Evidence Passport with 22 claims and 10 source dossiers.

    unreviewed history →
  588. project Entered the record Bristol Clean Air Zone (Class D)

    Created the first structured Evidence Passport with 16 claims and 7 source dossiers.

    unreviewed history →
  589. project Entered the record Amsterdam Algorithm Register

    Created the first structured Evidence Passport with 12 claims and 4 source dossiers.

    unreviewed history →
  590. project Entered the record Escudo Jalisco C5: State Camera Network and Plate Reading

    Created the first structured Evidence Passport with 9 claims and 3 source dossiers.

    unreviewed history →
  591. project Entered the record Jalisco Transit Routes Published as GTFS

    Created the first structured Evidence Passport with 4 claims and 1 source dossier.

    unreviewed history →
  592. project Entered the record Light Rail Line 3 and Its Urbalis CBTC Signalling

    Created the first structured Evidence Passport with 8 claims and 2 source dossiers.

    unreviewed history →
  593. project Entered the record Mi Bici Public Bicycle System and Its Open Trip Data

    Created the first structured Evidence Passport with 8 claims and 4 source dossiers.

    unreviewed history →
  594. project Entered the record Mi Movilidad Card and the Price of a Transfer

    Created the first structured Evidence Passport with 9 claims and 3 source dossiers.

    unreviewed history →
  595. project Entered the record SIMAJ Air Monitoring and the Atmospheric Contingency Plan

    Created the first structured Evidence Passport with 9 claims and 4 source dossiers.

    unreviewed history →
  596. project Entered the record Visor Urbano: Digital Construction and Business Permits

    Created the first structured Evidence Passport with 11 claims and 5 source dossiers.

    unreviewed history →
  597. project Publication date recorded for 3 sources Maasvlakte II Automated Container Terminals

    Corrected fundingModel from "private-investment" to "private", a value the taxonomy defines. The old value was outside the enum, so this entry formed a funding bucket of its own in every count that groups by it.

    unreviewed history →
  598. project Publication date recorded for 2 sources Street Activity Sensors: the count is kept, the video is not

    Corrected fundingModel from "municipal-budget" to "public", a value the taxonomy defines. The old value was outside the enum, so this entry formed a funding bucket of its own in every count that groups by it.

    unreviewed history →
  599. project Publication date recorded for 4 sources Maeslant Barrier: the Closure Decision Is Not a Person's

    Corrected fundingModel from "public-budget" to "public", a value the taxonomy defines. The old value was outside the enum, so this entry formed a funding bucket of its own in every count that groups by it.

    unreviewed history →
  600. project Publication date recorded for 8 sources GoPass: DART's Four-Agency Ticketing App & the Card That Came Seven Years Later

    Corrected fundingModel from "municipal" to "public", a value the taxonomy defines. The old value was outside the enum, so this entry formed a funding bucket of its own in every count that groups by it.

    unreviewed history →
  601. project Entered the record Octopus Contactless Fare & Payment Card

    Created the first structured Evidence Passport with 11 claims and 5 source dossiers.

    unreviewed history →
  602. project Entered the record Superblock Poblenou

    Created the first structured Evidence Passport with 12 claims and 3 source dossiers.

    unreviewed history →
  603. project Entered the record Vienna's Citizens' Solar & Wind Power Plants

    Created the first structured Evidence Passport with 7 claims and 3 source dossiers.

    unreviewed history →
  604. project 3 sources added Rio de Janeiro BRT: Four Corridors, a Revoked Concession & a Public Rebuild

    Replaced the operator page the entry rested on for its data layer: brt.rio is a parked domain now, both articles 404, and no snapshot exists — the city's own release on the control centre's opening carries the same description and is the stronger source. Corrected a misattribution: the 250,000-by-2030 target was cited to a release that does not contain it. Removed three source notes and three public caveats that described this project's fetching problems rather than the sources.

    unreviewed history →
  605. project 1 source added Bilhete Único: São Paulo's three-hour bus and rail fare integration

    Corrected a source URL that had never existed: the stored address carried the accented forms of cartao and debito, which the operator's site does not use. The ASCII address answers and carries the quoted sentence verbatim; the source was never dead.

    unreviewed history →
  606. project Entered the record Decidim Participation Platform

    Created the first structured Evidence Passport with 9 claims and 6 source dossiers.

    unreviewed history →
  607. project 3 sources added Decide Madrid

    Dated the participatory-budget peak to the edition that reached it, dated the threshold finding to the study that measured it, sourced the software's reuse figure to the page that states it, repaired a dead source URL and a source note that credited a press release with a threshold it never mentions, and replaced the single evidence anchor with a complete claim array plus source dates.

    unreviewed history →
  608. project 1 source added Buenos Aires's Fugitive Facial Recognition System, stopped by the courts

    Corrected a rollout sequence no source describes and a contemporaneous account contradicts, added the civil-liberties report that documents what the cameras actually covered, and replaced the single evidence anchor with a complete claim array plus source dates.

    unreviewed history →
  609. project Evidence grade changed: independent → peer-reviewed Electronic Road Pricing (ERP) Network

    Removed a speed figure that appears in no published account of the scheme and replaced it with the measured one, stopped dating the speed-band policy to a year no source attaches to it, separated the switch-over date from the removal of the gantries, raised the evidence grade to peer-reviewed, and recorded a complete claim array with source dates.

    unreviewed history →
  610. project Entered the record Central London Congestion Charging Scheme

    Created the first structured Evidence Passport with 13 claims and 6 source dossiers.

    unreviewed history →
  611. project 2 sources added ShotSpotter Acoustic Gunshot Detection

    Narrowed the description of what the Inspector General actually reviewed (confirmed and dispatched alerts, not every alert), sourced the district denominator and the South/West Sides framing, corrected a source note that credited the report with recommendations it never issued, and recorded a complete claim array with source dates.

    unreviewed history →
  612. project Entered the record City Data Exchange

    Created the first structured Evidence Passport with 9 claims and 5 source dossiers.

    unreviewed history →
  613. project Operator changed Shenzhen's All-Electric Bus Fleet

    Separated the bus and taxi fleets (the World Bank dates the taxi conversion to 2019, not 2017), removed the unsourced charging-point count and the arithmetic built on it, corrected the operator field to the city's three municipal bus companies, and recorded a complete claim array with source dates.

    unreviewed history →
  614. project Entered the record GoPass: DART's Four-Agency Ticketing App & the Card That Came Seven Years Later

    Created the first structured Evidence Passport with 21 claims and 8 source dossiers.

    unreviewed history →
  615. project Entered the record ewz.LoRaWAN — Zurich's Municipal IoT Network

    Created the first structured Evidence Passport with 7 claims and 6 source dossiers.

    unreviewed history →
  616. project Entered the record Beeline Crowd-Sourced Bus Platform

    Created the first structured Evidence Passport with 8 claims and 4 source dossiers.

    unreviewed history →
  617. project Entered the record Nagoya Smart Water Meter Trial

    Created the first structured Evidence Passport with 7 claims and 5 source dossiers.

    unreviewed history →
  618. project Entered the record Ville en Alerte — Flood Sensor Network and GEMAPI Duty Room

    Created the first structured Evidence Passport with 19 claims and 5 source dossiers.

    unreviewed history →
  619. project Entered the record Melbourne's Solar-Powered Smart Litter Bin Network

    Created the first structured Evidence Passport with 10 claims and 4 source dossiers.

    unreviewed history →
  620. project Entered the record Bordeaux Metropole DataHub: 562 Datasets Under the Licence Ouverte

    Created the first structured Evidence Passport with 17 claims and 5 source dossiers.

    unreviewed history →
  621. project Entered the record Ten Gigabit Adelaide Fibre Network

    Created the first structured Evidence Passport with 12 claims and 5 source dossiers.

    unreviewed history →
  622. project Entered the record Green Mark & Super Low Energy Buildings

    Created the first structured Evidence Passport with 12 claims and 3 source dossiers.

    unreviewed history →
  623. project Entered the record LED it Shine: Citywide Smart Street Lighting Retrofit

    Created the first structured Evidence Passport with 11 claims and 6 source dossiers.

    unreviewed history →
  624. project Entered the record Virtual Shibuya

    Created the first structured Evidence Passport with 8 claims and 4 source dossiers.

    unreviewed history →
  625. project Entered the record Intelligent Traffic Lights (iVRI) on the Eindhoven Ring

    Created the first structured Evidence Passport with 6 claims and 7 source dossiers.

    unreviewed history →
  626. project Entered the record Marunouchi Naka-dori Low-Speed Mobility & Hub Trials

    Created the first structured Evidence Passport with 5 claims and 4 source dossiers.

    unreviewed history →
  627. project Entered the record Green Infrastructure Living Laboratory (GSI Performance Monitoring)

    Created the first structured Evidence Passport with 11 claims and 3 source dossiers.

    unreviewed history →
  628. project Entered the record Haneda Innovation City Level 4 Autonomous Bus

    Created the first structured Evidence Passport with 5 claims and 3 source dossiers.

    unreviewed history →
  629. project Entered the record BEST electric bus fleet

    Created the first structured Evidence Passport with 11 claims and 5 source dossiers.

    unreviewed history →
  630. project Entered the record MTA Zero-Emission Bus Transition

    Created the first structured Evidence Passport with 18 claims and 9 source dossiers.

    unreviewed history →
  631. project Entered the record Adaptive Ramp Metering on Sheikh Zayed bin Sultan Street

    Created the first structured Evidence Passport with 8 claims and 4 source dossiers.

    unreviewed history →
  632. project Entered the record PAAS — Bratislava Parking Assistant

    Created the first structured Evidence Passport with 9 claims and 5 source dossiers.

    unreviewed history →
  633. project Entered the record Janmarg BRTS: Fleet Telematics and Smartcard Fares

    Created the first structured Evidence Passport with 13 claims and 6 source dossiers.

    unreviewed history →
  634. project Entered the record Paris2Connect: shared sensor infrastructure & urban digital twin (13th arr.)

    Created the first structured Evidence Passport with 9 claims and 4 source dossiers.

    unreviewed history →
  635. project Entered the record Johan Cruijff ArenA Battery Storage & Vehicle-to-Grid Pilot

    Created the first structured Evidence Passport with 10 claims and 4 source dossiers.

    unreviewed history →
  636. project Entered the record SRT (Smart Roadway Transit) Nagoya Station–Sakae Busway

    Created the first structured Evidence Passport with 8 claims and 4 source dossiers.

    unreviewed history →
  637. project Entered the record Hyundai Mobis Level 4 Autonomous Test Drives, Songdo–Yeongjongdo

    Created the first structured Evidence Passport with 9 claims and 4 source dossiers.

    unreviewed history →
  638. project Entered the record Rome Mobility Control Centre

    Created the first structured Evidence Passport with 9 claims and 4 source dossiers.

    unreviewed history →
  639. project Entered the record OSAKAKO Vertiport

    Created the first structured Evidence Passport with 10 claims and 4 source dossiers.

    unreviewed history →
  640. project Entered the record West Lake Smart Crowd & Traffic Management Platform

    Created the first structured Evidence Passport with 11 claims and 5 source dossiers.

    unreviewed history →
  641. project Entered the record Qianhai Digital Twin City CIM Platform

    Created the first structured Evidence Passport with 10 claims and 4 source dossiers.

    unreviewed history →
  642. project Entered the record Umekita Underground Platforms: Movable Platform Doors and a Face-Recognition Gate Trial

    Created the first structured Evidence Passport with 14 claims and 7 source dossiers.

    unreviewed history →
  643. project Entered the record EASY Card, contactless bank cards and a daily fare cap

    Created the first structured Evidence Passport with 12 claims and 11 source dossiers.

    unreviewed history →
  644. project Entered the record Optical Waste Sorting by Bag Colour (Haraldrud & Klemetsrud)

    Created the first structured Evidence Passport with 14 claims and 8 source dossiers.

    unreviewed history →
  645. project Entered the record Vienna Open Government Data Portal (data.wien.gv.at)

    Created the first structured Evidence Passport with 9 claims and 3 source dossiers.

    unreviewed history →
  646. project Entered the record Bossnett - Underground Vacuum Waste Collection

    Created the first structured Evidence Passport with 11 claims and 4 source dossiers.

    unreviewed history →
  647. project Entered the record Hammarby Sjöstad's Underground Vacuum Waste Network

    Created the first structured Evidence Passport with 12 claims and 6 source dossiers.

    unreviewed history →
  648. project Entered the record Copenhagen's Cloudburst Management Plan

    Created the first structured Evidence Passport with 10 claims and 4 source dossiers.

    unreviewed history →
  649. project Entered the record Smart City Takeshiba

    Created the first structured Evidence Passport with 3 claims and 2 source dossiers.

    unreviewed history →
  650. project 2 sources added Tsunashima Sustainable Smart Town

    Sourced the comparison with Fujisawa: added the two operator pages that carry Panasonic Group's role in its consortium and its own lifestyle-first description, and rewrote both passages to what those pages say.

    unreviewed history →
  651. project Record revised Miami-Dade's Chief Heat Officer and Extreme Heat Action Plan

    Removed a factual claim about Athens naming Europe's first heat officer that no source of this entry covers.

    unreviewed history →
  652. project Publication date recorded for 14 sources Cairo Metro Contactless Fare Card

    Removed factual claims about the Kigali and Lagos fare cards that no source of this entry covers.

    unreviewed history →
  653. project Record revised Ventra: Chicago's Open-Loop Fare System and Its Broken Launch

    Removed a factual claim about Osaka's open-loop rollout that no source of this entry covers, together with the year span derived from it.

    unreviewed history →
  654. project Publication date recorded for 7 sources Cape Town Open Data Portal

    Replaced an unsourced comparison with Toronto and Bogota by the entry's own measurement of its licence consistency.

    unreviewed history →
  655. project Publication date recorded for 12 sources Metrobus: BRT lanes laid over the existing bus network

    Removed a factual claim about Bogotá's BRT design that no source of this entry covers; the design contrast is kept generically.

    unreviewed history →
  656. project 1 claim added DataSF and San Francisco's Open Data Law

    Removed a factual claim about Chicago's open-data order and its compliance reports that no source of this entry covers.

    unreviewed history →
  657. project Record revised Clipper: One Card for Two Dozen Bay Area Operators, and the Rebuild That Ran Late

    Removed a factual claim about Los Angeles's fare governance that no source of this entry covers; the contrast it drew is kept in structural terms.

    unreviewed history →
  658. project Entered the record Tencent Net City

    Created the first structured Evidence Passport with 6 claims and 4 source dossiers.

    unreviewed history →
  659. project Entered the record London Adaptive Traffic Signals (FUSION / Real Time Optimiser)

    Created the first structured Evidence Passport with 8 claims and 4 source dossiers.

    unreviewed history →
  660. project Entered the record Jelbi — BVG's Integrated Mobility App

    Created the first structured Evidence Passport with 8 claims and 4 source dossiers.

    unreviewed history →
  661. project Entered the record Greencity 2000-Watt District Energy System

    Created the first structured Evidence Passport with 8 claims and 5 source dossiers.

    unreviewed history →
  662. project Entered the record Tianjin Zero-Carbon Smart Terminal

    Created the first structured Evidence Passport with 9 claims and 4 source dossiers.

    unreviewed history →
  663. project Entered the record Tallinn LED & Smart Street Lighting

    Created the first structured Evidence Passport with 8 claims and 4 source dossiers.

    unreviewed history →
  664. project Entered the record Golemio Urban Waste Sensor Mesh

    Created the first structured Evidence Passport with 4 claims and 3 source dossiers.

    unreviewed history →
  665. project Entered the record e-kontrola: Warsaw's Plate-Scanning Parking Enforcement Cars

    Created the first structured Evidence Passport with 7 claims and 4 source dossiers.

    unreviewed history →
  666. project Entered the record Plan Vélo Digital Infrastructure Mesh

    Created the first structured Evidence Passport with 6 claims and 3 source dossiers.

    unreviewed history →
  667. project Entered the record Frankfurt Airport Biometric Boarding

    Created the first structured Evidence Passport with 10 claims and 4 source dossiers.

    unreviewed history →
  668. project Entered the record Cosma21 / [ui!] UrbanPulse Urban Data Platform

    Created the first structured Evidence Passport with 6 claims and 3 source dossiers.

    unreviewed history →
  669. project Entered the record Antananarivo Urban Cable Car (Orange Line)

    Created the first structured Evidence Passport with 10 claims and 5 source dossiers.

    unreviewed history →
  670. project Entered the record Mapa de Manaus: Resurveying a Property Register Frozen Since 2010

    Created the first structured Evidence Passport with 16 claims and 4 source dossiers.

    unreviewed history →
  671. project Entered the record Nukissiorfiit's PULSE Digital Utility Platform

    Created the first structured Evidence Passport with 8 claims and 4 source dossiers.

    unreviewed history →
  672. project Entered the record Open Bangkok: Data Catalogue & Policy Scorecard

    Created the first structured Evidence Passport with 13 claims and 9 source dossiers.

    unreviewed history →
  673. project Entered the record BERDO: Boston's Building Emissions Caps

    Created the first structured Evidence Passport with 9 claims and 8 source dossiers.

    unreviewed history →
  674. project Entered the record EPB Quantum Network Infrastructure

    Created the first structured Evidence Passport with 6 claims and 4 source dossiers.

    unreviewed history →
  675. project Entered the record Quito Metro Line 1: CITYFLO 350 Automatic Train Control Signalling

    Created the first structured Evidence Passport with 9 claims and 6 source dossiers.

    unreviewed history →
  676. project Entered the record Kampala Traffic Control Centre (MODERATO)

    Created the first structured Evidence Passport with 14 claims and 5 source dossiers.

    unreviewed history →
  677. project Entered the record Istanbul Traffic Control Center & Adaptive Signals (İSBAK)

    Created the first structured Evidence Passport with 7 claims and 4 source dossiers.

    unreviewed history →
  678. project Entered the record Area B — Milan's Low-Emission Zone

    Created the first structured Evidence Passport with 12 claims and 3 source dossiers.

    unreviewed history →
  679. project Entered the record VLT Carioca — Catenary-Free Tram on a Card-Only Fare

    Created the first structured Evidence Passport with 13 claims and 7 source dossiers.

    unreviewed history →
  680. project Entered the record Muni Metro Advanced Train Control System & Its Replacement

    Created the first structured Evidence Passport with 13 claims and 12 source dossiers.

    unreviewed history →
  681. project Entered the record StadtRAD Hamburg Bike Share

    Created the first structured Evidence Passport with 8 claims and 6 source dossiers.

    unreviewed history →
  682. project Entered the record aspern Seestadt Smart City Lab

    Created the first structured Evidence Passport with 8 claims and 4 source dossiers.

    unreviewed history →
  683. project Entered the record Toyota Woven City

    Created the first structured Evidence Passport with 5 claims and 3 source dossiers.

    unreviewed history →
  684. project Entered the record Smart Rescue Defikopter

    Created the first structured Evidence Passport with 6 claims and 3 source dossiers.

    unreviewed history →
  685. project Entered the record DIGI-V Intelligent Traffic Control

    Created the first structured Evidence Passport with 8 claims and 3 source dossiers.

    unreviewed history →
  686. project Entered the record Paillon, Magnan and Cagne-Malvan: the Métropole's hydrometeorological watch

    Created the first structured Evidence Passport with 13 claims and 3 source dossiers.

    unreviewed history →
  687. project Entered the record West Alexandria's Grid Control Centre and the Meters That Have Not Arrived

    Created the first structured Evidence Passport with 14 claims and 3 source dossiers.

    unreviewed history →
  688. project Entered the record ATM Open-Loop Contactless Ticketing

    Created the first structured Evidence Passport with 8 claims and 3 source dossiers.

    unreviewed history →
  689. project Entered the record Wiener Netze Smart Meter Rollout

    Created the first structured Evidence Passport with 11 claims and 6 source dossiers.

    unreviewed history →
  690. project Entered the record SIGEM Municipal Management System

    Created the first structured Evidence Passport with 5 claims and 3 source dossiers.

    unreviewed history →
  691. project Entered the record Wiener Netze / Wien Energie LoRaWAN Sensor Network

    Created the first structured Evidence Passport with 9 claims and 5 source dossiers.

    unreviewed history →
  692. project Entered the record Digital Twin Mainz

    Created the first structured Evidence Passport with 7 claims and 3 source dossiers.

    unreviewed history →
  693. project Entered the record Vivacity AI Traffic-Sensor Network

    Created the first structured Evidence Passport with 13 claims and 5 source dossiers.

    unreviewed history →
  694. project Entered the record Citywide Smart Lighting & Sensor Network

    Created the first structured Evidence Passport with 8 claims and 5 source dossiers.

    unreviewed history →
  695. project Entered the record MiNT — Madrid Inteligente Urban Services Platform

    Created the first structured Evidence Passport with 11 claims and 3 source dossiers.

    unreviewed history →
  696. project Entered the record GeoHub Open Geospatial Data Platform

    Created the first structured Evidence Passport with 6 claims and 3 source dossiers.

    unreviewed history →
  697. project Entered the record Siemensstadt Square (Siemensstadt 2.0)

    Created the first structured Evidence Passport with 11 claims and 4 source dossiers.

    unreviewed history →
  698. project Entered the record Barcelona Pneumatic Waste Collection Network

    Created the first structured Evidence Passport with 8 claims and 4 source dossiers.

    unreviewed history →
  699. project Entered the record Harbin Daoli Automated District Heating Network

    Created the first structured Evidence Passport with 10 claims and 3 source dossiers.

    unreviewed history →
  700. project Entered the record Navigo Contactless Ticketing

    Created the first structured Evidence Passport with 7 claims and 5 source dossiers.

    unreviewed history →
  701. project Entered the record Shams Dubai Rooftop Solar

    Created the first structured Evidence Passport with 8 claims and 3 source dossiers.

    unreviewed history →
  702. project Entered the record AI Pressure-Sensor Leak Detection (Alto Boqueirão & Tatuquara)

    Created the first structured Evidence Passport with 10 claims and 3 source dossiers.

    unreviewed history →
  703. project Entered the record Oyster & Contactless Fare Payment

    Created the first structured Evidence Passport with 10 claims and 5 source dossiers.

    unreviewed history →
  704. project Entered the record EstaR Digital — App-Based Regulated Parking

    Created the first structured Evidence Passport with 9 claims and 3 source dossiers.

    unreviewed history →
  705. project Entered the record River-Crossing Bridge Structural Health Monitoring Network

    Created the first structured Evidence Passport with 13 claims and 2 source dossiers.

    unreviewed history →
  706. project Entered the record Copenhagen Bathing Water Forecast & Overflow Warning System

    Created the first structured Evidence Passport with 8 claims and 3 source dossiers.

    unreviewed history →
  707. project Entered the record Dakar Bus Rapid Transit (electric BRT)

    Created the first structured Evidence Passport with 9 claims and 4 source dossiers.

    unreviewed history →
  708. project Entered the record CESC Advanced Metering Infrastructure & Smart Meter Pilot (Kolkata)

    Created the first structured Evidence Passport with 10 claims and 4 source dossiers.

    unreviewed history →
  709. project Entered the record Colombo Port Navis N4 Terminal Operating System

    Created the first structured Evidence Passport with 10 claims and 3 source dossiers.

    unreviewed history →
  710. project Entered the record Kyiv Metro Open-Loop Bank-Card Fares & Token Retirement

    Created the first structured Evidence Passport with 11 claims and 4 source dossiers.

    unreviewed history →
  711. project Entered the record STB Open-Loop Contactless Fare Payment

    Created the first structured Evidence Passport with 11 claims and 3 source dossiers.

    unreviewed history →
  712. project Entered the record Beijing TOCC Traffic Coordination Center

    Created the first structured Evidence Passport with 4 claims and 3 source dossiers.

    unreviewed history →
  713. project Entered the record Tashkent Water Transformation Plan (SUEZ)

    Created the first structured Evidence Passport with 8 claims and 2 source dossiers.

    unreviewed history →
  714. project Publication date recorded for 11 sources Bilhete Único Carioca: taking the fare data back from the bus operators

    Record the publication date of each source that states one; a source that publishes no date is marked null, and one that shows only a revision carries `updated` instead. One source label named the date the service changed rather than the date of the document and was reworded, so the recorded publication date and the label can no longer contradict each other.

    unreviewed history →
  715. project Publication date recorded for 7 sources Traffy Fondue: Bangkok's LINE-Based Problem Reporting

    Record the publication date of each source that states one; a source that publishes no date is marked null, and one that shows only a revision carries `updated` instead. One source label named the date of the EVENT rather than of the document and was reworded, so the recorded publication date and the label can no longer contradict each other.

    unreviewed history →
  716. project Publication date recorded for 9 sources No-Contact Apprehension Policy Camera Enforcement

    Record the publication date of each source that states one; a source that publishes no date is marked null, and one that shows only a revision carries `updated` instead. The publisher's own permalink names the local day; the UTC metadata stamp names the wrong one.

    unreviewed history →
  717. project Publication date recorded for 15 sources NextMuni: Real-Time Muni Predictions & the Fight Over Who Owned Them

    Record the publication date of each source that states one; a source that publishes no date is marked null, and one that shows only a revision carries `updated` instead. The SFMTA page prints its own byline — 8 June 2022 — while its CMS metadata carries the node's creation date; the visible line wins.

    unreviewed history →
  718. project Publication date recorded for 9 sources Washington Metro's automatic train operation, switched off for 15 years

    Record the publication date of each source that states one; a source that publishes no date is marked null, and one that shows only a revision carries `updated` instead.

    unreviewed history →
  719. project Publication date recorded for 12 sources DC Water's Clean Rivers Tunnels & the Consent Decree Behind Them

    Record the publication date of each source that states one; a source that publishes no date is marked null, and one that shows only a revision carries `updated` instead.

    unreviewed history →
  720. project Publication date recorded for 13 sources DC 311 and the Open311 API It Started

    Record the publication date of each source that states one; a source that publishes no date is marked null, and one that shows only a revision carries `updated` instead.

    unreviewed history →
  721. project Publication date recorded for 8 sources Shanghai Data Exchange

    Record the publication date of each source that states one; a source that publishes no date is marked null, and one that shows only a revision carries `updated` instead.

    unreviewed history →
  722. project Publication date recorded for 15 sources Surveillance Technology Ordinance & Facial Recognition Ban

    Record the publication date of each source that states one; a source that publishes no date is marked null, and one that shows only a revision carries `updated` instead.

    unreviewed history →
  723. project Publication date recorded for 14 sources Clipper: One Card for Two Dozen Bay Area Operators, and the Rebuild That Ran Late

    Record the publication date of each source that states one; a source that publishes no date is marked null, and one that shows only a revision carries `updated` instead.

    unreviewed history →
  724. project Publication date recorded for 10 sources Smart Sampa Camera Network & Facial Recognition

    Record the publication date of each source that states one; a source that publishes no date is marked null, and one that shows only a revision carries `updated` instead.

    unreviewed history →
  725. project Publication date recorded for 13 sources Bilhete Único: São Paulo's three-hour bus and rail fare integration

    Record the publication date of each source that states one; a source that publishes no date is marked null, and one that shows only a revision carries `updated` instead.

    unreviewed history →
  726. project Publication date recorded for 11 sources Bike Sampa: a bike share the city permits rather than buys

    Record the publication date of each source that states one; a source that publishes no date is marked null, and one that shows only a revision carries `updated` instead.

    unreviewed history →
  727. project Publication date recorded for 11 sources Santiago's Suspended Smart Electricity Meter Rollout

    Record the publication date of each source that states one; a source that publishes no date is marked null, and one that shows only a revision carries `updated` instead.

    unreviewed history →
  728. project Publication date recorded for 10 sources Santiago Metro Automation: Two Cabless Lines and CBTC on the Rest

    Record the publication date of each source that states one; a source that publishes no date is marked null, and one that shows only a revision carries `updated` instead.

    unreviewed history →
  729. project Publication date recorded for 12 sources Rio de Janeiro BRT: Four Corridors, a Revoked Concession & a Public Rebuild

    Record the publication date of each source that states one; a source that publishes no date is marked null, and one that shows only a revision carries `updated` instead.

    unreviewed history →
  730. project Publication date recorded for 10 sources NYC311 Service Requests & Open Data

    Record the publication date of each source that states one; a source that publishes no date is marked null, and one that shows only a revision carries `updated` instead.

    unreviewed history →
  731. project Publication date recorded for 8 sources Mumbai Power Grid Islanding Scheme

    Record the publication date of each source that states one; a source that publishes no date is marked null, and one that shows only a revision carries `updated` instead.

    unreviewed history →
  732. project Publication date recorded for 8 sources Montreal Non-Residential Water Metering, After the Cancelled Contract

    Record the publication date of each source that states one; a source that publishes no date is marked null, and one that shows only a revision carries `updated` instead.

    unreviewed history →
  733. project Publication date recorded for 8 sources Photo radar in Montreal: cameras the province owns

    Record the publication date of each source that states one; a source that publishes no date is marked null, and one that shows only a revision carries `updated` instead.

    unreviewed history →
  734. project Publication date recorded for 15 sources BIXI Montréal: city-owned bikes, non-profit operator, operator-held data

    Record the publication date of each source that states one; a source that publishes no date is marked null, and one that shows only a revision carries `updated` instead.

    unreviewed history →
  735. project Publication date recorded for 8 sources Metromover: fare-free driverless people mover in downtown Miami

    Record the publication date of each source that states one; a source that publishes no date is marked null, and one that shows only a revision carries `updated` instead.

    unreviewed history →
  736. project Publication date recorded for 9 sources Miami-Dade's Chief Heat Officer and Extreme Heat Action Plan

    Record the publication date of each source that states one; a source that publishes no date is marked null, and one that shows only a revision carries `updated` instead.

    unreviewed history →
  737. project Publication date recorded for 11 sources Miami 311: A County Line and a City Record That Stops in 2024

    Record the publication date of each source that states one; a source that publishes no date is marked null, and one that shows only a revision carries `updated` instead.

    unreviewed history →
  738. project Publication date recorded for 12 sources Movilidad Integrada: One Fare Card Across Eight Transport Systems

    Record the publication date of each source that states one; a source that publishes no date is marked null, and one that shows only a revision carries `updated` instead.

    unreviewed history →
  739. project Publication date recorded for 9 sources EFCOS: Metro Manila's Flood Telemetry and Floodway Gates

    Record the publication date of each source that states one; a source that publishes no date is marked null, and one that shows only a revision carries `updated` instead.

    unreviewed history →
  740. project Publication date recorded for 10 sources Lagos State Parametric Flood Insurance Policy

    Record the publication date of each source that states one; a source that publishes no date is marked null, and one that shows only a revision carries `updated` instead.

    unreviewed history →
  741. project Publication date recorded for 10 sources Lagos State Public Camera Network and ANPR Enforcement

    Record the publication date of each source that states one; a source that publishes no date is marked null, and one that shows only a revision carries `updated` instead.

    unreviewed history →
  742. project Publication date recorded for 11 sources TAP: One Fare Card for Los Angeles County, and the Caps That Came With It

    Record the publication date of each source that states one; a source that publishes no date is marked null, and one that shows only a revision carries `updated` instead.

    unreviewed history →
  743. project Publication date recorded for 14 sources Vumacam: Johannesburg's Privately Owned Camera and Plate-Reading Network

    Record the publication date of each source that states one; a source that publishes no date is marked null, and one that shows only a revision carries `updated` instead.

    unreviewed history →
  744. project Publication date recorded for 9 sources TransJakarta BRT & Mikrotrans Angkot Integration

    Record the publication date of each source that states one; a source that publishes no date is marked null, and one that shows only a revision carries `updated` instead.

    unreviewed history →
  745. project Publication date recorded for 14 sources Ventra: Chicago's Open-Loop Fare System and Its Broken Launch

    Record the publication date of each source that states one; a source that publishes no date is marked null, and one that shows only a revision carries `updated` instead.

    unreviewed history →
  746. project Publication date recorded for 10 sources Divvy: City-Owned Bike Share & Open Trip Data

    Record the publication date of each source that states one; a source that publishes no date is marked null, and one that shows only a revision carries `updated` instead.

    unreviewed history →
  747. project Publication date recorded for 10 sources North Cairo's JICA-Funded Smart Meter Rollout

    Record the publication date of each source that states one; a source that publishes no date is marked null, and one that shows only a revision carries `updated` instead.

    unreviewed history →
  748. project Publication date recorded for 10 sources Cairo Bike: Egypt's First Public Bike Share

    Record the publication date of each source that states one; a source that publishes no date is marked null, and one that shows only a revision carries `updated` instead.

    unreviewed history →
  749. project Publication date recorded for 8 sources Busan New Port West Container Terminal Phase 2-5

    Record the publication date of each source that states one; a source that publishes no date is marked null, and one that shows only a revision carries `updated` instead.

    unreviewed history →
  750. project Publication date recorded for 8 sources Busan Blockchain Regulation-Free Special Zone

    Record the publication date of each source that states one; a source that publishes no date is marked null, and one that shows only a revision carries `updated` instead.

    unreviewed history →
  751. project Publication date recorded for 11 sources Street Bump Road Defect App

    Record the publication date of each source that states one; a source that publishes no date is marked null, and one that shows only a revision carries `updated` instead.

    unreviewed history →
  752. project Publication date recorded for 11 sources Analyze Boston and the 2014 Open Data Executive Order

    Record the publication date of each source that states one; a source that publishes no date is marked null, and one that shows only a revision carries `updated` instead.

    unreviewed history →
  753. project Publication date recorded for 7 sources Bogotá's Shared Bike System (Tembici)

    Record the publication date of each source that states one; a source that publishes no date is marked null, and one that shows only a revision carries `updated` instead.

    unreviewed history →
  754. project Publication date recorded for 14 sources Bangkok Rail Fare & Ticketing Integration

    Record the publication date of each source that states one; a source that publishes no date is marked null, and one that shows only a revision carries `updated` instead.

    unreviewed history →
  755. project Publication date recorded for 10 sources Bangkok PM2.5 Monitoring & Graduated Response

    Record the publication date of each source that states one; a source that publishes no date is marked null, and one that shows only a revision carries `updated` instead.

    unreviewed history →
  756. project Publication date recorded for 5 sources ASKİ SCADA Network and Ankara's Water Losses

    Record the publication date of each source that states one; a source that publishes no date is marked null, and one that shows only a revision carries `updated` instead.

    unreviewed history →
  757. project Publication date recorded for 10 sources TAMM: Abu Dhabi's Government Super-App

    Record the publication date of each source that states one; a source that publishes no date is marked null, and one that shows only a revision carries `updated` instead.

    unreviewed history →
  758. project Publication date recorded for 4 sources Abidjan Intelligent Transport System and Video Enforcement

    Record the publication date of each source that states one; a source that publishes no date is marked null, and one that shows only a revision carries `updated` instead.

    unreviewed history →
  759. project 2 claims added Old Havana OpenStreetMap Mapping Sprint

    Removed or softened wording that no listed source carries, after reading every source while preparing the claim ledger. The six-day duration appears only in Bloomberg coverage that is not listed and could not be read; '360-degree rigs' becomes '360-degree cameras' (the source names no manufacturer); the unevidenced OpenStreetMap database import is gone, and the claim that hedged it with it.

    unreviewed history →
  760. project 5 claims added Multi-function smart poles — folding streetlights, cameras and sensors into one post

    Removed or softened wording that no listed source carries, after reading every source while preparing the claim ledger. One corridor appears in no readable source, the energy saving is 50% counting LED retrofit and dimming together rather than 40% for the retrofit alone, and no source uses 'reserved' or quantifies idle capacity.

    unreviewed history →
  761. project 5 claims added Santander Cycles

    Removed or softened wording that no listed source carries, after reading every source while preparing the claim ledger. TfL contracts the scheme to Serco rather than owning it, only Wikipedia gives the sponsorship month, the October 2022 e-bike launch was 500 bikes rather than 2,000, and the hires figure is a state as of October 2024.

    unreviewed history →
  762. project 3 claims added Amman Bus Rapid Transit & Open-Loop Ticketing

    Removed or softened wording that no listed source carries, after reading every source while preparing the claim ledger. No listed source mentions QR tickets, a card supplier or gates, and the third line is described as proposed in the prose of the same article that tabulates it.

    unreviewed history →
  763. project 1 claim added Amman Smart Water Metering (Miyahuna/Itron NRW Reduction)

    Removed or softened wording that no listed source carries, after reading every source while preparing the claim ledger. Roya reports 123,000 as a target rather than as meters already replaced, and the closing inference about the loss gap was the entry's own.

    unreviewed history →
  764. project 1 claim added Mumbai Metro Aqua Line (Line 3) — Automated Underground Corridor

    Removed or softened wording that no listed source carries, after reading every source while preparing the claim ledger. The source lists platform screen doors as contract scope without stating that all 27 stations have them.

    unreviewed history →
  765. project 3 claims added Kismayo Solar Mini-Grid for Refugee Returnees

    Removed or softened wording that no listed source carries, after reading every source while preparing the claim ledger. No source calls this Kismayo's first mini-grid or states the 2018 capacity that 'far larger' compares against, and both sources name WESCO rather than a national main grid.

    unreviewed history →
  766. project 3 claims added Metro Line 7 GoA4 Automated Operation

    Removed or softened wording that no listed source carries, after reading every source while preparing the claim ledger. Only the year 2023 is sourced for the south section, CRRC states no car count per train, and its SIL4 statement covers the vehicles' onboard safety functions rather than the signalling system.

    unreviewed history →
  767. project 2 claims added Incheon Metro Line 2's Road to Fully Unattended Operation

    Removed or softened wording that no listed source carries, after reading every source while preparing the claim ledger. No source describes the trains as cabinless, the Incheon paragraph says only 'new signalling equipment', and under UTO the safety officers moved to the stations rather than disappearing.

    unreviewed history →
  768. project 1 claim added TOCC — Chengdu's citywide transport data coordination centre

    Removed or softened wording that no listed source carries, after reading every source while preparing the claim ledger. The source describes extra empty trains in short-turn operation, not rerouting.

    unreviewed history →
  769. project 2 claims added AI-Driven Demand Response for Copenhagen's District Heating

    Corrected a figure conflation in the snippet that the impact field already carried: the 22% belongs to maximum peak power, the morning-peak value is 14%.

    unreviewed history →
  770. project 3 claims added Belgrade Sitraffic Adaptive Traffic Control

    Removed or softened wording that no listed source carries, after reading every source while preparing the claim ledger. The 26% covers travel time and stops together in one direction, and the 40% applies to Ruzveltova, not to prioritised routes generally; no source describes a delay of several years.

    unreviewed history →
  771. project Record revised MMDA Metrobase Traffic Command Centre & Public Traffic Feed

    Removed or softened wording that no listed source carries, after reading every source while preparing the claim ledger. No source mentions the MMDA's social channels, and the absence claim ('no one has measured') becomes the supported statement that no newer measurement has been published.

    unreviewed history →
  772. project 1 source added HARUMI FLAG Hydrogen Infrastructure

    Added Panasonic's Part 1 article as a source and rephrased the resident figure as what it is: the developer's projection of 'as many as 12,000 residents by 2024', not a count.

    unreviewed history →
  773. project 1 claim added Circular Building Material Passports

    Removed or softened wording that no listed source carries, after reading every source while preparing the claim ledger. The location (Zuidas), the superlative ('Madaster's first') and the year 2017 are gone: none of the three sources carries them.

    unreviewed history →
  774. project Entered the record AI-Driven Demand Response for Copenhagen's District Heating

    Created the first structured Evidence Passport with 14 claims and 3 source dossiers.

    unreviewed history →
  775. project Entered the record Amman Bus Rapid Transit & Open-Loop Ticketing

    Created the first structured Evidence Passport with 13 claims and 4 source dossiers.

    unreviewed history →
  776. project Entered the record Amman Smart Water Metering (Miyahuna/Itron NRW Reduction)

    Created the first structured Evidence Passport with 14 claims and 6 source dossiers.

    unreviewed history →
  777. project Entered the record Belgrade Sitraffic Adaptive Traffic Control

    Created the first structured Evidence Passport with 11 claims and 3 source dossiers.

    unreviewed history →
  778. project Entered the record Circular Building Material Passports

    Created the first structured Evidence Passport with 7 claims and 3 source dossiers.

    unreviewed history →
  779. project Entered the record HARUMI FLAG Hydrogen Infrastructure

    Created the first structured Evidence Passport with 8 claims and 3 source dossiers.

    unreviewed history →
  780. project Entered the record Incheon Metro Line 2's Road to Fully Unattended Operation

    Created the first structured Evidence Passport with 12 claims and 4 source dossiers.

    unreviewed history →
  781. project Entered the record Kismayo Solar Mini-Grid for Refugee Returnees

    Created the first structured Evidence Passport with 9 claims and 5 source dossiers.

    unreviewed history →
  782. project Entered the record Metro Line 7 GoA4 Automated Operation

    Created the first structured Evidence Passport with 15 claims and 5 source dossiers.

    unreviewed history →
  783. project Entered the record MMDA Metrobase Traffic Command Centre & Public Traffic Feed

    Created the first structured Evidence Passport with 11 claims and 6 source dossiers.

    unreviewed history →
  784. project Entered the record Multi-function smart poles — folding streetlights, cameras and sensors into one post

    Created the first structured Evidence Passport with 13 claims and 3 source dossiers.

    unreviewed history →
  785. project Entered the record Mumbai Metro Aqua Line (Line 3) — Automated Underground Corridor

    Created the first structured Evidence Passport with 13 claims and 7 source dossiers.

    unreviewed history →
  786. project Entered the record Old Havana OpenStreetMap Mapping Sprint

    Created the first structured Evidence Passport with 10 claims and 3 source dossiers.

    unreviewed history →
  787. project Entered the record Santander Cycles

    Created the first structured Evidence Passport with 11 claims and 5 source dossiers.

    unreviewed history →
  788. project Entered the record TOCC — Chengdu's citywide transport data coordination centre

    Created the first structured Evidence Passport with 13 claims and 3 source dossiers.

    unreviewed history →
  789. project Evidence grade changed: official → media Santiago Metro Automation: Two Cabless Lines and CBTC on the Rest

    Evidence grade lowered from official to media: the entry cites no source published by the organisation that operates the system — its strongest source is a supplier or the press. Supplier material is not operator self-reporting.

    unreviewed history →
  790. project Evidence grade changed: official → media MRT Kajang & Putrajaya Lines: GoA4 as the Baseline

    Evidence grade lowered from official to media: the entry cites no source published by the organisation that operates the system — its strongest source is a supplier or the press. Supplier material is not operator self-reporting.

    unreviewed history →
  791. project Evidence grade changed: official → media Open-Loop Transit Payments & MultiPass

    Evidence grade lowered from official to media: the entry cites no source published by the organisation that operates the system — its strongest source is a supplier or the press. Supplier material is not operator self-reporting.

    unreviewed history →
  792. project Publication date recorded for 14 sources Registro Bici: Bogotá's Mandatory Bicycle Register

    Reclassified the 6 July 2022 city notice on the unregistered-riding claim: it contradicts the claim rather than supporting it, and is now recorded as a contradictedBy relation (the reader-facing caveat stays). No claim text changed.

    unreviewed history →
  793. project Entered the record City Brain

    Created the first structured Evidence Passport with 11 claims and 5 source dossiers.

    unreviewed history →
  794. project Entered the record BMA AI Adaptive Traffic Signals

    Created the first structured Evidence Passport with 12 claims and 4 source dossiers.

    unreviewed history →
  795. project Entered the record Songdo International Business District

    Created the first structured Evidence Passport with 8 claims and 4 source dossiers.

    unreviewed history →
  796. project Publication date recorded for 9 sources Línea 2 — Lima's Automated Underground Metro

    Corrected one source date: La Republica's article was recorded as 2026-08-18, a day after this entry's own lastVerified. The publisher permalink dates it 2026-08-12.

    unreviewed history →
  797. project Entered the record TAP: One Fare Card for Los Angeles County, and the Caps That Came With It

    Created the first structured Evidence Passport with 8 claims and 11 source dossiers.

    unreviewed history →
  798. project Entered the record Movilidad Integrada: One Fare Card Across Eight Transport Systems

    Created the first structured Evidence Passport with 10 claims and 12 source dossiers.

    unreviewed history →
  799. project Entered the record Divvy: City-Owned Bike Share & Open Trip Data

    Created the first structured Evidence Passport with 8 claims and 10 source dossiers.

    unreviewed history →
  800. project Entered the record Photo radar in Montreal: cameras the province owns

    Created the first structured Evidence Passport with 9 claims and 8 source dossiers.

    unreviewed history →
  801. project Entered the record Bilhete Único Carioca: taking the fare data back from the bus operators

    Created the first structured Evidence Passport with 10 claims and 11 source dossiers.

    unreviewed history →
  802. project Entered the record Rio de Janeiro BRT: Four Corridors, a Revoked Concession & a Public Rebuild

    Created the first structured Evidence Passport with 11 claims and 12 source dossiers.

    unreviewed history →
  803. project Entered the record Vumacam: Johannesburg's Privately Owned Camera and Plate-Reading Network

    Created the first structured Evidence Passport with 14 claims and 14 source dossiers.

    unreviewed history →
  804. project Entered the record DC Water's Clean Rivers Tunnels & the Consent Decree Behind Them

    Created the first structured Evidence Passport with 12 claims and 12 source dossiers.

    unreviewed history →
  805. project Entered the record Bilhete Único: São Paulo's three-hour bus and rail fare integration

    Created the first structured Evidence Passport with 11 claims and 13 source dossiers.

    unreviewed history →
  806. project Entered the record Analyze Boston and the 2014 Open Data Executive Order

    Created the first structured Evidence Passport with 9 claims and 11 source dossiers.

    unreviewed history →
  807. project Entered the record NextMuni: Real-Time Muni Predictions & the Fight Over Who Owned Them

    Created the first structured Evidence Passport with 10 claims and 15 source dossiers.

    unreviewed history →
  808. project Entered the record Ventra: Chicago's Open-Loop Fare System and Its Broken Launch

    Created the first structured Evidence Passport with 10 claims and 14 source dossiers.

    unreviewed history →
  809. project Entered the record Clipper: One Card for Two Dozen Bay Area Operators, and the Rebuild That Ran Late

    Created the first structured Evidence Passport with 10 claims and 14 source dossiers.

    unreviewed history →
  810. project Entered the record Abidjan Intelligent Transport System and Video Enforcement

    Created the first structured Evidence Passport with 7 claims and 4 source dossiers.

    unreviewed history →
  811. project Entered the record Drinking Water Network SCADA

    Created the first structured Evidence Passport with 5 claims and 3 source dossiers.

    unreviewed history →
  812. project Entered the record Shanghai Data Exchange

    Created the first structured Evidence Passport with 4 claims and 8 source dossiers.

    unreviewed history →
  813. project Entered the record ASKİ SCADA Network and Ankara's Water Losses

    Created the first structured Evidence Passport with 6 claims and 5 source dossiers.

    unreviewed history →
  814. project Entered the record Busan Blockchain Regulation-Free Special Zone

    Created the first structured Evidence Passport with 7 claims and 8 source dossiers.

    unreviewed history →
  815. project Entered the record Busan New Port West Container Terminal Phase 2-5

    Created the first structured Evidence Passport with 6 claims and 8 source dossiers.

    unreviewed history →
  816. project Entered the record Traffy Fondue: Bangkok's LINE-Based Problem Reporting

    Created the first structured Evidence Passport with 6 claims and 7 source dossiers.

    unreviewed history →
  817. project Entered the record Mumbai Power Grid Islanding Scheme

    Created the first structured Evidence Passport with 5 claims and 8 source dossiers.

    unreviewed history →
  818. project Entered the record TransJakarta BRT & Mikrotrans Angkot Integration

    Created the first structured Evidence Passport with 7 claims and 9 source dossiers.

    unreviewed history →
  819. project Entered the record Cape Town Open Data Portal

    Created the first structured Evidence Passport with 7 claims and 7 source dossiers.

    unreviewed history →
  820. project Entered the record North Cairo's JICA-Funded Smart Meter Rollout

    Created the first structured Evidence Passport with 10 claims and 10 source dossiers.

    unreviewed history →
  821. project Entered the record NYC311 Service Requests & Open Data

    Created the first structured Evidence Passport with 6 claims and 10 source dossiers.

    unreviewed history →
  822. project Entered the record EFCOS: Metro Manila's Flood Telemetry and Floodway Gates

    Created the first structured Evidence Passport with 7 claims and 9 source dossiers.

    unreviewed history →
  823. project Entered the record Bogotá's Shared Bike System (Tembici)

    Created the first structured Evidence Passport with 6 claims and 7 source dossiers.

    unreviewed history →
  824. project Entered the record Cairo Bike: Egypt's First Public Bike Share

    Created the first structured Evidence Passport with 10 claims and 10 source dossiers.

    unreviewed history →
  825. project Entered the record Bike Sampa: a bike share the city permits rather than buys

    Created the first structured Evidence Passport with 7 claims and 11 source dossiers.

    unreviewed history →
  826. project Entered the record Bangkok PM2.5 Monitoring & Graduated Response

    Created the first structured Evidence Passport with 9 claims and 10 source dossiers.

    unreviewed history →
  827. project Entered the record Metromover: fare-free driverless people mover in downtown Miami

    Created the first structured Evidence Passport with 8 claims and 8 source dossiers.

    unreviewed history →
  828. project Entered the record TAMM: Abu Dhabi's Government Super-App

    Created the first structured Evidence Passport with 10 claims and 10 source dossiers.

    unreviewed history →
  829. project Entered the record No-Contact Apprehension Policy Camera Enforcement

    Created the first structured Evidence Passport with 7 claims and 9 source dossiers.

    unreviewed history →
  830. project Entered the record Bangkok Rail Fare & Ticketing Integration

    Created the first structured Evidence Passport with 8 claims and 14 source dossiers.

    unreviewed history →
  831. project Entered the record Santiago's Suspended Smart Electricity Meter Rollout

    Created the first structured Evidence Passport with 12 claims and 11 source dossiers.

    unreviewed history →
  832. project Entered the record Montreal Non-Residential Water Metering, After the Cancelled Contract

    Created the first structured Evidence Passport with 9 claims and 8 source dossiers.

    unreviewed history →
  833. project Entered the record Lagos State Parametric Flood Insurance Policy

    Created the first structured Evidence Passport with 11 claims and 10 source dossiers.

    unreviewed history →
  834. project Entered the record Lagos State Public Camera Network and ANPR Enforcement

    Created the first structured Evidence Passport with 8 claims and 10 source dossiers.

    unreviewed history →
  835. project Entered the record Santiago Metro Automation: Two Cabless Lines and CBTC on the Rest

    Created the first structured Evidence Passport with 12 claims and 10 source dossiers.

    unreviewed history →
  836. project Entered the record Miami-Dade's Chief Heat Officer and Extreme Heat Action Plan

    Created the first structured Evidence Passport with 9 claims and 9 source dossiers.

    unreviewed history →
  837. project Entered the record Washington Metro's automatic train operation, switched off for 15 years

    Created the first structured Evidence Passport with 8 claims and 9 source dossiers.

    unreviewed history →
  838. project Entered the record Street Bump Road Defect App

    Created the first structured Evidence Passport with 8 claims and 11 source dossiers.

    unreviewed history →
  839. project Entered the record Miami 311: A County Line and a City Record That Stops in 2024

    Created the first structured Evidence Passport with 9 claims and 11 source dossiers.

    unreviewed history →
  840. project Entered the record Smart Sampa Camera Network & Facial Recognition

    Created the first structured Evidence Passport with 9 claims and 10 source dossiers.

    unreviewed history →
  841. project Entered the record BIXI Montréal: city-owned bikes, non-profit operator, operator-held data

    Created the first structured Evidence Passport with 12 claims and 15 source dossiers.

    unreviewed history →
  842. project Entered the record DataSF and San Francisco's Open Data Law

    Created the first structured Evidence Passport with 9 claims and 13 source dossiers.

    unreviewed history →
  843. project Entered the record DC 311 and the Open311 API It Started

    Created the first structured Evidence Passport with 10 claims and 13 source dossiers.

    unreviewed history →
  844. project Entered the record Surveillance Technology Ordinance & Facial Recognition Ban

    Created the first structured Evidence Passport with 13 claims and 15 source dossiers.

    unreviewed history →
  845. project Publication date recorded for 5 sources 1022 Citizen Reporting Portal

    Record the publication date of each source that states one; sources that publish no date are marked null.

    unreviewed history →
  846. project Publication date recorded for 5 sources Air Quality Monitoring Network

    Record the publication date of each source that states one; sources that publish no date are marked null.

    unreviewed history →
  847. project Publication date recorded for 7 sources City Bus GPS Fleet Tracking & Official App

    Record the publication date of each source that states one; sources that publish no date are marked null.

    unreviewed history →
  848. project Publication date recorded for 6 sources Citywide Facial-Recognition Camera Network

    Record the publication date of each source that states one; sources that publish no date are marked null.

    unreviewed history →
  849. project Publication date recorded for 7 sources Driverless Shuttle Pilots in Open Traffic

    Record the publication date of each source that states one; sources that publish no date are marked null.

    unreviewed history →
  850. project Publication date recorded for 6 sources Face Pay — Facial-Recognition Fares in the Metro

    Record the publication date of each source that states one; sources that publish no date are marked null.

    unreviewed history →
  851. project Publication date recorded for 7 sources Hanoi Metro: Two Lines, a Driver in Every Cab

    Record the publication date of each source that states one; sources that publish no date are marked null.

    unreviewed history →
  852. project Publication date recorded for 3 sources Heat Action Plan

    Record the publication date of each source that states one; sources that publish no date are marked null.

    unreviewed history →
  853. project Publication date recorded for 9 sources Hoy No Circula: Mexico City's Plate-Based Driving Restriction

    Record the publication date of each source that states one; sources that publish no date are marked null.

    unreviewed history →
  854. project Publication date recorded for 5 sources K-Electric's Published Feeder-Level Load-Shedding Regime

    Record the publication date of each source that states one; sources that publish no date are marked null.

    unreviewed history →
  855. project Publication date recorded for 5 sources Karachi Safe City: Cameras 13 Years After the Announcement

    Record the publication date of each source that states one; sources that publish no date are marked null.

    unreviewed history →
  856. project Publication date recorded for 4 sources Maeslant Barrier: the Closure Decision Is Not a Person's

    Record the publication date of each source that states one; sources that publish no date are marked null.

    unreviewed history →
  857. project Publication date recorded for 3 sources MRT Kajang & Putrajaya Lines: GoA4 as the Baseline

    Record the publication date of each source that states one; sources that publish no date are marked null.

    unreviewed history →
  858. project Publication date recorded for 4 sources NOX-Block Lamppost EV Charging

    Record the publication date of each source that states one; sources that publish no date are marked null.

    unreviewed history →
  859. project Publication date recorded for 6 sources Open-Loop Transit Payments & MultiPass

    Record the publication date of each source that states one; sources that publish no date are marked null.

    unreviewed history →
  860. project Publication date recorded for 5 sources Orange Line Metro: Automated Trains, Drivers in the Cab

    Record the publication date of each source that states one; sources that publish no date are marked null.

    unreviewed history →
  861. project Publication date recorded for 5 sources Particulate Emissions Trading Scheme

    Record the publication date of each source that states one; sources that publish no date are marked null.

    unreviewed history →
  862. project Publication date recorded for 7 sources PPWSA: Metering Out a 72% Water Loss

    Record the publication date of each source that states one; sources that publish no date are marked null.

    unreviewed history →
  863. project Publication date recorded for 5 sources Riyadh Parking: Priced Curbs & Camera Patrols

    Record the publication date of each source that states one; sources that publish no date are marked null.

    unreviewed history →
  864. project Publication date recorded for 6 sources SAWACO Water-Loss Reduction & District Metering

    Record the publication date of each source that states one; sources that publish no date are marked null.

    unreviewed history →
  865. project Publication date recorded for 6 sources SMART Tunnel: Motorway That Yields to Floodwater

    Record the publication date of each source that states one; sources that publish no date are marked null.

    unreviewed history →
  866. project Publication date recorded for 4 sources Sydney Water's Smart Meter Pilot and Rollout Plan

    Record the publication date of each source that states one; sources that publish no date are marked null.

    unreviewed history →
  867. project Publication date recorded for 3 sources Tsunashima Sustainable Smart Town

    Record the publication date of each source that states one; sources that publish no date are marked null.

    unreviewed history →
  868. project Publication date recorded for 1 source Yokohama Smart City Project (YSCP)

    Record the publication date of each source that states one; sources that publish no date are marked null.

    unreviewed history →
  869. project Publication date recorded for 3 sources Citywide LoRaWAN Network & DOdata Hub

    Record the publication date of each source that states one; sources that publish no date are marked null.

    unreviewed history →
  870. project Publication date recorded for 2 sources Easy Ride and the Minato Mirai Autonomous Mobility Pilot

    Record the publication date of each source that states one; sources that publish no date are marked null.

    unreviewed history →
  871. project Publication date recorded for 2 sources Futamatagawa–Sakonyama Autonomous Bus Trial

    Record the publication date of each source that states one; sources that publish no date are marked null.

    unreviewed history →
  872. project Publication date recorded for 3 sources Heat Action Plan

    Record the publication date of each source that states one; sources that publish no date are marked null.

    unreviewed history →
  873. project Publication date recorded for 2 sources Minato Mirai 21 Visitor Measurement

    Record the publication date of each source that states one; sources that publish no date are marked null.

    unreviewed history →
  874. project Publication date recorded for 3 sources Open Data Portal with Zero-Attribution Default

    Record the publication date of each source that states one; sources that publish no date are marked null.

    unreviewed history →
  875. project Publication date recorded for 1 source Particulate Emissions Trading Scheme

    Record the publication date of each source that states one; sources that publish no date are marked null.

    unreviewed history →
  876. project Publication date recorded for 1 source Ukai and Tapi Flood Early Warning System

    Record the publication date of each source that states one; sources that publish no date are marked null.

    unreviewed history →
  877. project Publication date recorded for 2 sources Yokohama Open Data Portal

    Record the publication date of each source that states one; sources that publish no date are marked null.

    unreviewed history →
  878. project Publication date recorded for 1 source Day Zero: Cape Town's Drought Demand Management

    Record the publication date of each source that states one; sources that publish no date are marked null.

    unreviewed history →
  879. project Publication date recorded for 1 source Línea 2 — Lima's Automated Underground Metro

    Record the publication date of each source that states one; sources that publish no date are marked null.

    unreviewed history →
  880. project Publication date recorded for 3 sources LWMC Waste Fleet GPS Tracking & Suthra Punjab Dashboard

    Record the publication date of each source that states one; sources that publish no date are marked null.

    unreviewed history →
  881. project Publication date recorded for 3 sources Maasvlakte II Automated Container Terminals

    Record the publication date of each source that states one; sources that publish no date are marked null.

    unreviewed history →
  882. project Publication date recorded for 3 sources MRT Kajang & Putrajaya Lines: GoA4 as the Baseline

    Record the publication date of each source that states one; sources that publish no date are marked null.

    unreviewed history →
  883. project Publication date recorded for 1 source Transit Telematics and the Surat Money Card

    Record the publication date of each source that states one; sources that publish no date are marked null.

    unreviewed history →
  884. project Publication date recorded for 3 sources Tsunashima Sustainable Smart Town

    Record the publication date of each source that states one; sources that publish no date are marked null.

    unreviewed history →
  885. project Publication date recorded for 4 sources H-Bahn Driverless Suspended Monorail

    Record the publication date of each source that states one; sources that publish no date are marked null.

    unreviewed history →
  886. project Publication date recorded for 4 sources KWSC Online Tanker Booking and Unified App

    Record the publication date of each source that states one; sources that publish no date are marked null.

    unreviewed history →
  887. project Publication date recorded for 4 sources NOX-Block Lamppost EV Charging

    Record the publication date of each source that states one; sources that publish no date are marked null.

    unreviewed history →
  888. project Publication date recorded for 4 sources Ravi Riverfront: A New City Mostly Still on Paper

    Record the publication date of each source that states one; sources that publish no date are marked null.

    unreviewed history →
  889. project Publication date recorded for 5 sources 1022 Citizen Reporting Portal

    Record the publication date of each source that states one; sources that publish no date are marked null.

    unreviewed history →
  890. project Publication date recorded for 5 sources Air Quality Monitoring Network

    Record the publication date of each source that states one; sources that publish no date are marked null.

    unreviewed history →
  891. project Publication date recorded for 1 source Buenos Aires's Fugitive Facial Recognition System, stopped by the courts

    Record the publication date of each source that states one; sources that publish no date are marked null.

    unreviewed history →
  892. project Publication date recorded for 5 sources iHanoi Citizen App

    Record the publication date of each source that states one; sources that publish no date are marked null.

    unreviewed history →
  893. project Record revised Lamppost-as-a-Platform Sensor Trial

    Record the publication date of each source that states one; sources that publish no date are marked null.

    unreviewed history →
  894. project Publication date recorded for 4 sources Maeslant Barrier: the Closure Decision Is Not a Person's

    Record the publication date of each source that states one; sources that publish no date are marked null.

    unreviewed history →
  895. project Record revised Masdar City

    Record the publication date of each source that states one; sources that publish no date are marked null.

    unreviewed history →
  896. project Publication date recorded for 4 sources NSW Air Quality Monitoring Network (Sydney Stations)

    Record the publication date of each source that states one; sources that publish no date are marked null.

    unreviewed history →
  897. project Publication date recorded for 5 sources NSW Spatial Digital Twin

    Record the publication date of each source that states one; sources that publish no date are marked null.

    unreviewed history →
  898. project Publication date recorded for 4 sources Sydney Water's Smart Meter Pilot and Rollout Plan

    Record the publication date of each source that states one; sources that publish no date are marked null.

    unreviewed history →
  899. project Publication date recorded for 3 sources Virtual Singapore: National 3D City Model and Digital Twin

    Record the publication date of each source that states one; sources that publish no date are marked null.

    unreviewed history →
  900. project Publication date recorded for 1 source Yangshan Port Phase IV automated container terminal

    Record the publication date of each source that states one; sources that publish no date are marked null.

    unreviewed history →
  901. project Entered the record Autolib' Electric Car-Sharing

    Created the first structured Evidence Passport with 1 claim and 4 source dossiers.

    unreviewed history →
  902. project Record revised Beijing License Plate Lottery & Vehicle Quota System

    Record publication (and where stated, revision) dates for this entry's sources.

    unreviewed history →
  903. project Entered the record BudapestGO Mobility Platform Integration

    Created the first structured Evidence Passport with 1 claim and 4 source dossiers.

    unreviewed history →
  904. project Record revised C4 Command Centre & the 123 Emergency Line

    Record publication (and where stated, revision) dates for this entry's sources.

    unreviewed history →
  905. project Publication date recorded for 1 source CHI311 Service Requests and the Audit of "Completed"

    Record publication (and where stated, revision) dates for this entry's sources.

    unreviewed history →
  906. project Entered the record Copenhagen's Real-Time Building Energy & Water Surveillance System

    Created the first structured Evidence Passport with 1 claim and 3 source dossiers.

    unreviewed history →
  907. project Record revised Court-Ordered Air Quality Monitoring

    Record publication (and where stated, revision) dates for this entry's sources.

    unreviewed history →
  908. project Entered the record e-Health Surabaya — Online Queueing for Public Clinics

    Created the first structured Evidence Passport with 1 claim and 3 source dossiers.

    unreviewed history →
  909. project Entered the record E-Madzi Automated Water Kiosks

    Created the first structured Evidence Passport with 1 claim and 4 source dossiers.

    unreviewed history →
  910. project Entered the record Electronic Road Pricing (ERP) Network

    Created the first structured Evidence Passport with 1 claim and 5 source dossiers.

    unreviewed history →
  911. project Entered the record Free Public Transport for Registered Residents

    Created the first structured Evidence Passport with 1 claim and 4 source dossiers.

    unreviewed history →
  912. project Publication date recorded for 1 source Ganjil-Genap: Jakarta's Odd-Even Plate Rationing

    Record publication (and where stated, revision) dates for this entry's sources.

    unreviewed history →
  913. project Entered the record Grand Paris Low-Emission Zone (ZFE-m)

    Created the first structured Evidence Passport with 1 claim and 4 source dossiers.

    unreviewed history →
  914. project Publication date recorded for 1 source GRAP: Air Quality Readings as a Legal Trigger

    Record publication (and where stated, revision) dates for this entry's sources.

    unreviewed history →
  915. project Entered the record Guangzhou Bus Rapid Transit Corridor

    Created the first structured Evidence Passport with 1 claim and 4 source dossiers.

    unreviewed history →
  916. project Entered the record Hangzhou Data Open Platform

    Created the first structured Evidence Passport with 1 claim and 4 source dossiers.

    unreviewed history →
  917. project Entered the record Helsinki 3D+ Open City Model

    Created the first structured Evidence Passport with 1 claim and 4 source dossiers.

    unreviewed history →
  918. project Entered the record High-density air-quality monitoring and source-apportionment network

    Created the first structured Evidence Passport with 1 claim and 3 source dossiers.

    unreviewed history →
  919. project Publication date recorded for 1 source Holding Its Own Customers Below the National Load-Shedding Stage

    Record publication (and where stated, revision) dates for this entry's sources.

    unreviewed history →
  920. project Publication date recorded for 3 sources iParking: the Parking App That Never Controlled a Space

    Record publication (and where stated, revision) dates for this entry's sources.

    unreviewed history →
  921. project Publication date recorded for 1 source Jakarta MRT North-South Line Phase 1

    Record publication (and where stated, revision) dates for this entry's sources.

    unreviewed history →
  922. project Entered the record Kashiwa-no-ha Smart City

    Created the first structured Evidence Passport with 1 claim and 2 source dossiers.

    unreviewed history →
  923. project Entered the record Low Traffic Neighbourhoods (LTNs)

    Created the first structured Evidence Passport with 1 claim and 4 source dossiers.

    unreviewed history →
  924. project Entered the record luftdaten.info / Sensor.Community citizen air sensors

    Created the first structured Evidence Passport with 1 claim and 5 source dossiers.

    unreviewed history →
  925. project Entered the record Lyon Confluence

    Created the first structured Evidence Passport with 1 claim and 4 source dossiers.

    unreviewed history →
  926. project Entered the record Madrid Central / Madrid 360 Low-Emission Zone

    Created the first structured Evidence Passport with 1 claim and 4 source dossiers.

    unreviewed history →
  927. project Entered the record Mumbai Water Distribution Improvement Programme

    Created the first structured Evidence Passport with 1 claim and 4 source dossiers.

    unreviewed history →
  928. project Publication date recorded for 1 source Namma Metro Yellow Line: A Finished Line Waiting for Its Trains

    Record publication (and where stated, revision) dates for this entry's sources.

    unreviewed history →
  929. project Entered the record National Steps Challenge & HealthHub Digital Health

    Created the first structured Evidence Passport with 1 claim and 4 source dossiers.

    unreviewed history →
  930. project Entered the record Nova Xarxa Orthogonal Bus Network

    Created the first structured Evidence Passport with 1 claim and 4 source dossiers.

    unreviewed history →
  931. project Entered the record OP Digital: Belo Horizonte's Online Participatory Budget

    Created the first structured Evidence Passport with 1 claim and 3 source dossiers.

    unreviewed history →
  932. project Entered the record Oslo Climate Budget

    Created the first structured Evidence Passport with 1 claim and 3 source dossiers.

    unreviewed history →
  933. project Entered the record Owl Bus (Night Bus) — Big-Data Route Design

    Created the first structured Evidence Passport with 1 claim and 4 source dossiers.

    unreviewed history →
  934. project Entered the record Pasig River: Court-Ordered Water Quality Monitoring

    Created the first structured Evidence Passport with 1 claim and 4 source dossiers.

    unreviewed history →
  935. project Entered the record Passenger Vehicle Quota Lottery & Auction

    Created the first structured Evidence Passport with 1 claim and 4 source dossiers.

    unreviewed history →
  936. project Entered the record S-DoT — Smart Seoul Data of Things Sensor Network

    Created the first structured Evidence Passport with 1 claim and 3 source dossiers.

    unreviewed history →
  937. project Entered the record Shanghai New Energy Vehicle Data Monitoring Centre

    Created the first structured Evidence Passport with 1 claim and 5 source dossiers.

    unreviewed history →
  938. project Entered the record Shenzhen's All-Electric Bus Fleet

    Created the first structured Evidence Passport with 1 claim and 4 source dossiers.

    unreviewed history →
  939. project Entered the record SIES-M Integrated Emergency & Security Camera Network

    Created the first structured Evidence Passport with 1 claim and 3 source dossiers.

    unreviewed history →
  940. project Entered the record Smart Kalasatama

    Created the first structured Evidence Passport with 1 claim and 4 source dossiers.

    unreviewed history →
  941. project Entered the record Smarter Dengue Early Warning System

    Created the first structured Evidence Passport with 1 claim and 4 source dossiers.

    unreviewed history →
  942. project Entered the record Stockholm Congestion Charging Zone

    Created the first structured Evidence Passport with 1 claim and 3 source dossiers.

    unreviewed history →
  943. project Entered the record Superblock Sant Antoni

    Created the first structured Evidence Passport with 1 claim and 3 source dossiers.

    unreviewed history →
  944. project Entered the record Tehran Air Quality Monitoring Network & Pollution Emergency Closures

    Created the first structured Evidence Passport with 1 claim and 4 source dossiers.

    unreviewed history →
  945. project Entered the record Telangana State Police Integrated Command & Control Centre (ICCC)

    Created the first structured Evidence Passport with 1 claim and 4 source dossiers.

    unreviewed history →
  946. project Record revised Tunis RFR Suburban Rail: ETCS Level 1 Train Control and Central Command Post

    Record publication (and where stated, revision) dates for this entry's sources.

    unreviewed history →
  947. project Entered the record Urban Forest Visual & Email-a-Tree

    Created the first structured Evidence Passport with 1 claim and 4 source dossiers.

    unreviewed history →
  948. project Entered the record Yangon CCTV Traffic Control Centre

    Created the first structured Evidence Passport with 1 claim and 4 source dossiers.

    unreviewed history →
  949. project Entered the record ZBE Rondes de Barcelona Low Emission Zone

    Created the first structured Evidence Passport with 1 claim and 3 source dossiers.

    unreviewed history →
  950. project Entered the record Züri wie neu

    Created the first structured Evidence Passport with 1 claim and 5 source dossiers.

    unreviewed history →
  951. project Entered the record Aayalolo: Accra's BRT That Became a Quality Bus Service

    Created the first structured Evidence Passport with 1 claim and 6 source dossiers.

    unreviewed history →
  952. project Entered the record Águas Guariroba: Sectorised Network Telemetry and a One-Fifth Loss Rate

    Created the first structured Evidence Passport with 1 claim and 5 source dossiers.

    unreviewed history →
  953. project Entered the record AMA Digital Revenue Billing & Short-Code Payments

    Created the first structured Evidence Passport with 1 claim and 6 source dossiers.

    unreviewed history →
  954. project Entered the record Breathe Accra: One Air Sensor per Municipal Assembly

    Created the first structured Evidence Passport with 1 claim and 6 source dossiers.

    unreviewed history →
  955. project Entered the record City of Melbourne Pedestrian Counting System

    Created the first structured Evidence Passport with 1 claim and 6 source dossiers.

    unreviewed history →
  956. project Entered the record CityTaps Prepaid Smart Water Meters

    Created the first structured Evidence Passport with 1 claim and 5 source dossiers.

    unreviewed history →
  957. project Entered the record Copenhagen's LED Streetlight Retrofit & Remote Control Network

    Created the first structured Evidence Passport with 1 claim and 5 source dossiers.

    unreviewed history →
  958. project Entered the record Decide Madrid

    Created the first structured Evidence Passport with 1 claim and 5 source dossiers.

    unreviewed history →
  959. project Entered the record Hamburg Online Administration & Electronic Residence Registration

    Created the first structured Evidence Passport with 1 claim and 6 source dossiers.

    unreviewed history →
  960. project Entered the record Hyperlocal Air Mapping: Sensor Network and Mobile Monitoring

    Created the first structured Evidence Passport with 1 claim and 5 source dossiers.

    unreviewed history →
  961. project Entered the record Lisbon's Environmental Parameters Sensor Network

    Created the first structured Evidence Passport with 1 claim and 5 source dossiers.

    unreviewed history →
  962. project Entered the record Orçamento Participativo — the Origin of Participatory Budgeting

    Created the first structured Evidence Passport with 1 claim and 6 source dossiers.

    unreviewed history →
  963. project Entered the record Oslo Bysykkel City-Bike Network

    Created the first structured Evidence Passport with 1 claim and 5 source dossiers.

    unreviewed history →
  964. project Entered the record Porto Maravilha: CEPAC development-rights financing

    Created the first structured Evidence Passport with 1 claim and 7 source dossiers.

    unreviewed history →
  965. project Entered the record Rio Operations Center (COR)

    Created the first structured Evidence Passport with 1 claim and 5 source dossiers.

    unreviewed history →
  966. project Entered the record Shared E-Scooter Trial and Council Ban

    Created the first structured Evidence Passport with 1 claim and 6 source dossiers.

    unreviewed history →
  967. project Entered the record Transparenzportal: Publish-by-Default Information Register

    Created the first structured Evidence Passport with 1 claim and 6 source dossiers.

    unreviewed history →
  968. project Entered the record Transurbano SIGA Prepaid Bus System

    Created the first structured Evidence Passport with 1 claim and 6 source dossiers.

    unreviewed history →
  969. project Entered the record Tunis RFR Suburban Rail: ETCS Level 1 Train Control and Central Command Post

    Created the first structured Evidence Passport with 1 claim and 7 source dossiers.

    unreviewed history →
  970. project Entered the record Ultra Low Emission Zone (ULEZ)

    Created the first structured Evidence Passport with 1 claim and 6 source dossiers.

    unreviewed history →
  971. project Entered the record VinclesBCN — Tablets Against Unwanted Loneliness

    Created the first structured Evidence Passport with 1 claim and 5 source dossiers.

    unreviewed history →
  972. project Entered the record 22@ Barcelona Innovation District

    Created the first structured Evidence Passport with 1 claim and 4 source dossiers.

    unreviewed history →
  973. project Entered the record Addis Ababa Light Rail Transit

    Created the first structured Evidence Passport with 1 claim and 8 source dossiers.

    unreviewed history →
  974. project Entered the record Beijing License Plate Lottery & Vehicle Quota System

    Created the first structured Evidence Passport with 1 claim and 7 source dossiers.

    unreviewed history →
  975. project Entered the record Buenos Aires's Registered Recuperadores Urbanos & Green Centres

    Created the first structured Evidence Passport with 1 claim and 9 source dossiers.

    unreviewed history →
  976. project Entered the record Cablebus: Cable Cars as Ordinary Public Transit

    Created the first structured Evidence Passport with 1 claim and 8 source dossiers.

    unreviewed history →
  977. project Entered the record Diesel Driving Ban on Max-Brauer-Allee & Stresemannstraße

    Created the first structured Evidence Passport with 1 claim and 7 source dossiers.

    unreviewed history →
  978. project Entered the record Eindhoven's Data Code and Sensor Register

    Created the first structured Evidence Passport with 1 claim and 8 source dossiers.

    unreviewed history →
  979. project Entered the record GRAP: Air Quality Readings as a Legal Trigger

    Created the first structured Evidence Passport with 1 claim and 9 source dossiers.

    unreviewed history →
  980. project Entered the record Holding Its Own Customers Below the National Load-Shedding Stage

    Created the first structured Evidence Passport with 1 claim and 9 source dossiers.

    unreviewed history →
  981. project Entered the record Jiesu Jiban: 12345 complaint hotline and district scorecards

    Created the first structured Evidence Passport with 1 claim and 7 source dossiers.

    unreviewed history →
  982. project Entered the record Melbourne Open Data Portal

    Created the first structured Evidence Passport with 1 claim and 7 source dossiers.

    unreviewed history →
  983. project Entered the record Namma Metro Yellow Line: A Finished Line Waiting for Its Trains

    Created the first structured Evidence Passport with 1 claim and 7 source dossiers.

    unreviewed history →
  984. project Entered the record PRESTO: a provincial fare card on a city transit system

    Created the first structured Evidence Passport with 1 claim and 8 source dossiers.

    unreviewed history →
  985. project Entered the record Real-Time Air Quality Monitoring and Oslo's Once-Fired Diesel Ban

    Created the first structured Evidence Passport with 1 claim and 8 source dossiers.

    unreviewed history →
  986. project Entered the record Restriccion Vehicular: Santiago's Vintage-Tiered Plate Rationing

    Created the first structured Evidence Passport with 1 claim and 8 source dossiers.

    unreviewed history →
  987. project Entered the record RMCAB Air Quality Network & IBOCA Alert Phases

    Created the first structured Evidence Passport with 1 claim and 8 source dossiers.

    unreviewed history →
  988. project Entered the record Rodízio: São Paulo's Plate-Based Peak-Hour Driving Restriction

    Created the first structured Evidence Passport with 1 claim and 8 source dossiers.

    unreviewed history →
  989. project Entered the record São Paulo Open Data Portal and Municipal Data Policy

    Created the first structured Evidence Passport with 1 claim and 8 source dossiers.

    unreviewed history →
  990. project Entered the record Shanghai Mandatory Household Waste Sorting

    Created the first structured Evidence Passport with 1 claim and 8 source dossiers.

    unreviewed history →
  991. project Entered the record Toronto Automated Speed Enforcement (abolished by the province)

    Created the first structured Evidence Passport with 1 claim and 9 source dossiers.

    unreviewed history →
  992. project Entered the record Water ATMs: Prepaid Dispensers in Nairobi's Informal Settlements

    Created the first structured Evidence Passport with 1 claim and 8 source dossiers.

    unreviewed history →
  993. project Publication date recorded for 5 sources ITIS: The Traffic Camera Network Bought Twice

    Record the publication date of each source that states one; sources that publish no date are marked null.

    unreviewed history →
  994. project Publication date recorded for 5 sources K-Electric's Published Feeder-Level Load-Shedding Regime

    Record the publication date of each source that states one; sources that publish no date are marked null.

    unreviewed history →
  995. project Publication date recorded for 5 sources Karachi Safe City: Cameras 13 Years After the Announcement

    Record the publication date of each source that states one; sources that publish no date are marked null.

    unreviewed history →
  996. project Publication date recorded for 5 sources Orange Line Metro: Automated Trains, Drivers in the Cab

    Record the publication date of each source that states one; sources that publish no date are marked null.

    unreviewed history →
  997. project Publication date recorded for 5 sources Prepaid Meters on a Grid Run by Phone

    Record the publication date of each source that states one; sources that publish no date are marked null.

    unreviewed history →
  998. project Publication date recorded for 5 sources Punjab EPA Air Monitoring Network & Smog Emergency Orders

    Record the publication date of each source that states one; sources that publish no date are marked null.

    unreviewed history →
  999. project Entered the record Arroyo Maldonado relief tunnels & Buenos Aires's storm alert network

    Created the first structured Evidence Passport with 1 claim and 10 source dossiers.

    unreviewed history →
  1000. project Entered the record Buenos Aires Subte: CBTC Resignalling & Control Centre

    Created the first structured Evidence Passport with 1 claim and 13 source dossiers.

    unreviewed history →
  1001. project Entered the record C4 Command Centre & the 123 Emergency Line

    Created the first structured Evidence Passport with 1 claim and 10 source dossiers.

    unreviewed history →
  1002. project Entered the record Court-Ordered Air Quality Monitoring

    Created the first structured Evidence Passport with 1 claim and 10 source dossiers.

    unreviewed history →
  1003. project Entered the record Ganjil-Genap: Jakarta's Odd-Even Plate Rationing

    Created the first structured Evidence Passport with 1 claim and 11 source dossiers.

    unreviewed history →
  1004. project Entered the record GhanaPostGPS National Digital Addressing System

    Created the first structured Evidence Passport with 1 claim and 8 source dossiers.

    unreviewed history →
  1005. project Entered the record Jakarta MRT North-South Line Phase 1

    Created the first structured Evidence Passport with 1 claim and 15 source dossiers.

    unreviewed history →
  1006. project Entered the record Kigali's Air Quality Monitoring Network

    Created the first structured Evidence Passport with 1 claim and 10 source dossiers.

    unreviewed history →
  1007. project Entered the record Las Condes: Municipal Cameras, Drone Patrols and Facial Recognition

    Created the first structured Evidence Passport with 1 claim and 11 source dossiers.

    unreviewed history →
  1008. project Entered the record Metrobus: Mexico City's BRT Network and Its Open Real-Time Feed

    Created the first structured Evidence Passport with 1 claim and 12 source dossiers.

    unreviewed history →
  1009. project Entered the record Mexico City Water Network Sectorisation and Telemetry

    Created the first structured Evidence Passport with 1 claim and 10 source dossiers.

    unreviewed history →
  1010. project Entered the record SIMAT Air Monitoring and the Valley of Mexico Contingency Programme

    Created the first structured Evidence Passport with 1 claim and 10 source dossiers.

    unreviewed history →
  1011. project Entered the record The Matatu Cash Light Fare Mandate

    Created the first structured Evidence Passport with 1 claim and 10 source dossiers.

    unreviewed history →
  1012. project Entered the record Toronto Hydro Smart Meters and Ontario's Time-of-Use Pricing

    Created the first structured Evidence Passport with 1 claim and 12 source dossiers.

    unreviewed history →
  1013. project Publication date recorded for 5 sources Masdar City

    Record the publication date of each source that states one; sources that publish no date are marked null.

    unreviewed history →
  1014. project Publication date recorded for 5 sources Riyadh Advanced Traffic Control System

    Record the publication date of each source that states one; sources that publish no date are marked null.

    unreviewed history →
  1015. project Publication date recorded for 1 source Riyadh Bus Network & darb App

    Record the publication date of each source that states one; sources that publish no date are marked null.

    unreviewed history →
  1016. project Publication date recorded for 6 sources Bankak: a Banking App as Wartime Lifeline

    Record the publication date of each source that states one; sources that publish no date are marked null.

    unreviewed history →
  1017. project Publication date recorded for 10 sources Buenos Aires's Fugitive Facial Recognition System, stopped by the courts

    Record the publication date of each source that states one; sources that publish no date are marked null.

    unreviewed history →
  1018. project Publication date recorded for 7 sources City Bus GPS Fleet Tracking & Official App

    Record the publication date of each source that states one; sources that publish no date are marked null.

    unreviewed history →
  1019. project Publication date recorded for 6 sources Citywide Facial-Recognition Camera Network

    Record the publication date of each source that states one; sources that publish no date are marked null.

    unreviewed history →
  1020. project Publication date recorded for 10 sources Day Zero: Cape Town's Drought Demand Management

    Record the publication date of each source that states one; sources that publish no date are marked null.

    unreviewed history →
  1021. project Publication date recorded for 8 sources Delhi Smog Towers, Connaught Place & Anand Vihar

    Record the publication date of each source that states one; sources that publish no date are marked null.

    unreviewed history →
  1022. project Publication date recorded for 7 sources Driverless Shuttle Pilots in Open Traffic

    Record the publication date of each source that states one; sources that publish no date are marked null.

    unreviewed history →
  1023. project Publication date recorded for 5 sources e-Parking & the Energy Piggy Bank

    Record the publication date of each source that states one; sources that publish no date are marked null.

    unreviewed history →
  1024. project Publication date recorded for 6 sources Face Pay — Facial-Recognition Fares in the Metro

    Record the publication date of each source that states one; sources that publish no date are marked null.

    unreviewed history →
  1025. project Publication date recorded for 7 sources Hanoi Metro: Two Lines, a Driver in Every Cab

    Record the publication date of each source that states one; sources that publish no date are marked null.

    unreviewed history →
  1026. project Publication date recorded for 6 sources HCMC Metro Line 1 (Bến Thành–Suối Tiên)

    Record the publication date of each source that states one; sources that publish no date are marked null.

    unreviewed history →
  1027. project Publication date recorded for 9 sources Hoy No Circula: Mexico City's Plate-Based Driving Restriction

    Record the publication date of each source that states one; sources that publish no date are marked null.

    unreviewed history →
  1028. project Publication date recorded for 6 sources Johannesburg Water: Pressure Control and Night-Flow Telemetry Against Water Losses

    Record the publication date of each source that states one; sources that publish no date are marked null.

    unreviewed history →
  1029. project Publication date recorded for 7 sources Lamppost-as-a-Platform Sensor Trial

    Record the publication date of each source that states one; sources that publish no date are marked null.

    unreviewed history →
  1030. project Publication date recorded for 9 sources Línea 2 — Lima's Automated Underground Metro

    Record the publication date of each source that states one; sources that publish no date are marked null.

    unreviewed history →
  1031. project Publication date recorded for 8 sources Nusantara — Smart Forest Capital

    Record the publication date of each source that states one; sources that publish no date are marked null.

    unreviewed history →
  1032. project Publication date recorded for 6 sources Open-Loop Transit Payments & MultiPass

    Record the publication date of each source that states one; sources that publish no date are marked null.

    unreviewed history →
  1033. project Publication date recorded for 6 sources Paid Parking Zone with Camera-Car Enforcement

    Record the publication date of each source that states one; sources that publish no date are marked null.

    unreviewed history →
  1034. project Publication date recorded for 6 sources Peoples Bus Service Live-Tracking App

    Record the publication date of each source that states one; sources that publish no date are marked null.

    unreviewed history →
  1035. project Publication date recorded for 7 sources PPWSA: Metering Out a 72% Water Loss

    Record the publication date of each source that states one; sources that publish no date are marked null.

    unreviewed history →
  1036. project Publication date recorded for 6 sources Remote Electronic Voting (DEG)

    Record the publication date of each source that states one; sources that publish no date are marked null.

    unreviewed history →
  1037. project Publication date recorded for 8 sources Riyadh Bus Network & darb App

    Record the publication date of each source that states one; sources that publish no date are marked null.

    unreviewed history →
  1038. project Publication date recorded for 5 sources Riyadh Parking: Priced Curbs & Camera Patrols

    Record the publication date of each source that states one; sources that publish no date are marked null.

    unreviewed history →
  1039. project Publication date recorded for 6 sources SAWACO Water-Loss Reduction & District Metering

    Record the publication date of each source that states one; sources that publish no date are marked null.

    unreviewed history →
  1040. project Publication date recorded for 6 sources SMART Tunnel: Motorway That Yields to Floodwater

    Record the publication date of each source that states one; sources that publish no date are marked null.

    unreviewed history →
  1041. project Publication date recorded for 6 sources Sydney Metro Driverless Rapid Transit

    Record the publication date of each source that states one; sources that publish no date are marked null.

    unreviewed history →
  1042. project Publication date recorded for 5 sources Transport for NSW Real-Time Open Data Hub

    Record the publication date of each source that states one; sources that publish no date are marked null.

    unreviewed history →
  1043. project Publication date recorded for 10 sources Virtual Singapore: National 3D City Model and Digital Twin

    Record the publication date of each source that states one; sources that publish no date are marked null.

    unreviewed history →
  1044. project Publication date recorded for 6 sources Yangshan Port Phase IV automated container terminal

    Record the publication date of each source that states one; sources that publish no date are marked null.

    unreviewed history →
  1045. project Publication date recorded for 1 source BOS:311 and Boston's Service-Request Record

    Removed a source revision date that postdates the entry's own last verification: the page changed after we read it, so the recorded value described a version this entry never used.

    unreviewed history →
  1046. project Entered the record Clean Air Action Plan and Ambient Monitoring

    Created the first structured Evidence Passport with 6 claims and 4 source dossiers.

    unreviewed history →
  1047. project Publication date recorded for 1 source ConnectAtlanta / Video Integration Center

    Removed a source revision date that postdates the entry's own last verification: the page changed after we read it, so the recorded value described a version this entry never used.

    unreviewed history →
  1048. project Publication date recorded for 1 source CTA Bus Tracker, Train Tracker & the Developer Feeds

    Removed a source revision date that postdates the entry's own last verification: the page changed after we read it, so the recorded value described a version this entry never used.

    unreviewed history →
  1049. project Entered the record Particulate Emissions Trading Scheme

    Created the first structured Evidence Passport with 9 claims and 5 source dossiers.

    unreviewed history →
  1050. project Entered the record SMAC Integrated Command and Control Centre

    Created the first structured Evidence Passport with 6 claims and 4 source dossiers.

    unreviewed history →
  1051. project Entered the record Transit Telematics and the Surat Money Card

    Created the first structured Evidence Passport with 5 claims and 4 source dossiers.

    unreviewed history →
  1052. project Entered the record Ukai and Tapi Flood Early Warning System

    Created the first structured Evidence Passport with 5 claims and 4 source dossiers.

    unreviewed history →
  1053. project Publication date recorded for 1 source Vision Zero Boston: 25 mph default limit and open crash records

    Removed a source revision date that postdates the entry's own last verification: the page changed after we read it, so the recorded value described a version this entry never used.

    unreviewed history →
  1054. project Entered the record Dubai Digital Twin: 195,000 buildings, and no public door

    Created the first structured Evidence Passport with 4 claims and 2 source dossiers.

    unreviewed history →
  1055. project Entered the record Street Activity Sensors: the count is kept, the video is not

    Created the first structured Evidence Passport with 4 claims and 2 source dossiers.

    unreviewed history →
  1056. project Entered the record The MyCity Chatbot: proven wrong in public, switched off two years later

    Created the first structured Evidence Passport with 7 claims and 3 source dossiers.

    unreviewed history →
  1057. project Publication date recorded for 3 sources 311 and MyKCMO: The Whole Request Record, Channel Included

    Recorded the two dates each source states — publication in date, a stated revision in updated, an explicit null where the source gives neither.

    unreviewed history →
  1058. project Publication date recorded for 4 sources A Free Streetcar Counted by Infrared

    Recorded the two dates each source states — publication in date, a stated revision in updated, an explicit null where the source gives neither.

    unreviewed history →
  1059. project Entered the record Alerta Rio: rain gauges, thresholds & favela sirens

    Created the first structured Evidence Passport with 1 claim and 8 source dossiers.

    unreviewed history →
  1060. project Entered the record Automated Traffic Enforcement Cameras and the Collection Gap

    Created the first structured Evidence Passport with 1 claim and 9 source dossiers.

    unreviewed history →
  1061. project Entered the record bip! — Santiago's Fare Card and Its Published Evasion Index

    Created the first structured Evidence Passport with 5 claims and 11 source dossiers.

    unreviewed history →
  1062. project Entered the record Bogotá Metro Line 1 — elevated first line, built for driverless running

    Created the first structured Evidence Passport with 6 claims and 13 source dossiers.

    unreviewed history →
  1063. project Entered the record BOS:311 and Boston's Service-Request Record

    Created the first structured Evidence Passport with 1 claim and 12 source dossiers.

    unreviewed history →
  1064. project Publication date recorded for 8 sources Busan-Gimhae Light Rail and Its Revenue Guarantee

    Recorded sources[].date on every source that states one and an explicit null on the living pages that state none, so the entry can say how old its evidence is.

    unreviewed history →
  1065. project Entered the record C5 Camera, Panic-Button and Seismic-Alert Network

    Created the first structured Evidence Passport with 1 claim and 10 source dossiers.

    unreviewed history →
  1066. project Entered the record Cairo Metro Contactless Fare Card

    Created the first structured Evidence Passport with 7 claims and 14 source dossiers.

    unreviewed history →
  1067. project Publication date recorded for 9 sources Cairo Monorail: the East Nile Line to the New Capital

    Recorded sources[].date on every source that states one and an explicit null on the living pages that state none, so the entry can say how old its evidence is.

    unreviewed history →
  1068. project Publication date recorded for 4 sources Cashless E-Ticketing on the Bus Network

    Recorded sources[].date on every source that states one and an explicit null on the living pages that state none, so the entry can say how old its evidence is.

    unreviewed history →
  1069. project Publication date recorded for 18 sources CharlieCard and the AFC 2.0 Fare System Replacement

    Recorded sources[].date on every source that states one and an explicit null on the living pages that state none, so the entry can say how old its evidence is.

    unreviewed history →
  1070. project Publication date recorded for 6 sources CHI311 Service Requests and the Audit of "Completed"

    Recorded the two dates each source states — publication in date, a stated revision in updated, an explicit null where the source gives neither.

    unreviewed history →
  1071. project Entered the record Chicago's Open Data Executive Order and Portal

    Created the first structured Evidence Passport with 1 claim and 8 source dossiers.

    unreviewed history →
  1072. project Entered the record Climate Ready Boston

    Created the first structured Evidence Passport with 1 claim and 13 source dossiers.

    unreviewed history →
  1073. project Entered the record ConnectAtlanta / Video Integration Center

    Created the first structured Evidence Passport with 1 claim and 4 source dossiers.

    unreviewed history →
  1074. project Entered the record Cool Pavement Programme

    Created the first structured Evidence Passport with 1 claim and 3 source dossiers.

    unreviewed history →
  1075. project Entered the record Critical Episode Management: A Next-Day Forecast With Legal Force

    Created the first structured Evidence Passport with 9 claims and 13 source dossiers.

    unreviewed history →
  1076. project Entered the record CTA Bus Tracker, Train Tracker & the Developer Feeds

    Created the first structured Evidence Passport with 1 claim and 9 source dossiers.

    unreviewed history →
  1077. project Entered the record Dusit Model: Shared Records & Video Clinics Across Four Districts

    Created the first structured Evidence Passport with 1 claim and 5 source dossiers.

    unreviewed history →
  1078. project Publication date recorded for 9 sources El Metropolitano BRT

    Recorded sources[].date on every source that states one and an explicit null on the living pages that state none, so the entry can say how old its evidence is.

    unreviewed history →
  1079. project Entered the record EPB Gig City — Fiber-Optic Smart Grid & Community Broadband

    Created the first structured Evidence Passport with 1 claim and 3 source dossiers.

    unreviewed history →
  1080. project Publication date recorded for 5 sources Green Line BRT and the Breeze Fare System

    Recorded sources[].date on every source that states one and an explicit null on the living pages that state none, so the entry can say how old its evidence is.

    unreviewed history →
  1081. project Entered the record Health Code (健康码) — Hangzhou's Pandemic Status QR

    Created the first structured Evidence Passport with 1 claim and 6 source dossiers.

    unreviewed history →
  1082. project Publication date recorded for 5 sources Kelana Jaya Line: Driverless Since 1998

    Recorded sources[].date on every source that states one and an explicit null on the living pages that state none, so the entry can say how old its evidence is.

    unreviewed history →
  1083. project Entered the record King Street Transit Priority Corridor

    Created the first structured Evidence Passport with 4 claims and 11 source dossiers.

    unreviewed history →
  1084. project Entered the record Lagos Blue Line Rail

    Created the first structured Evidence Passport with 5 claims and 11 source dossiers.

    unreviewed history →
  1085. project Entered the record Local Law 144: Bias Audits for Hiring Algorithms

    Created the first structured Evidence Passport with 1 claim and 6 source dossiers.

    unreviewed history →
  1086. project Entered the record Metro ExpressLanes — Dynamically Priced I-110 & I-10 Lanes

    Created the first structured Evidence Passport with 1 claim and 11 source dossiers.

    unreviewed history →
  1087. project Entered the record METRO's 2015 System Reimagining Bus Network Redesign

    Created the first structured Evidence Passport with 1 claim and 5 source dossiers.

    unreviewed history →
  1088. project Entered the record Metrobus: BRT lanes laid over the existing bus network

    Created the first structured Evidence Passport with 6 claims and 12 source dossiers.

    unreviewed history →
  1089. project Publication date recorded for 4 sources Metrocable & Social Urbanism

    Recorded sources[].date on every source that states one and an explicit null on the living pages that state none, so the entry can say how old its evidence is.

    unreviewed history →
  1090. project Publication date recorded for 5 sources METRORapid Silver Line: Houston's First BRT Corridor

    Recorded sources[].date on every source that states one and an explicit null on the living pages that state none, so the entry can say how old its evidence is.

    unreviewed history →
  1091. project Entered the record NYC Connected Vehicle (V2X) Pilot

    Created the first structured Evidence Passport with 1 claim and 10 source dossiers.

    unreviewed history →
  1092. project Publication date recorded for 7 sources Opal Card & Contactless Tap and Pay

    Recorded sources[].date on every source that states one and an explicit null on the living pages that state none, so the entry can say how old its evidence is.

    unreviewed history →
  1093. project Publication date recorded for 4 sources Open Data KC: A Publishing Duty Written Into Law, and No Licence

    Recorded the two dates each source states — publication in date, a stated revision in updated, an explicit null where the source gives neither.

    unreviewed history →
  1094. project Entered the record Operation LASER & PredPol — Predictive Policing

    Created the first structured Evidence Passport with 1 claim and 11 source dossiers.

    unreviewed history →
  1095. project Entered the record Philly Streetlight Improvement Project (Citywide LED + Lighting Management System)

    Created the first structured Evidence Passport with 1 claim and 5 source dossiers.

    unreviewed history →
  1096. project Entered the record Pico y Placa: Plate Rationing You Can Pay to Escape

    Created the first structured Evidence Passport with 1 claim and 13 source dossiers.

    unreviewed history →
  1097. project Publication date recorded for 4 sources Prospect MAX: The East Side Corridor That Was Built, and the Kiosks That Report Their Own Failures

    Recorded the two dates each source states — publication in date, a stated revision in updated, an explicit null where the source gives neither.

    unreviewed history →
  1098. project Entered the record Recette Virtuelle: Tunis's Online Property-Tax Office

    Created the first structured Evidence Passport with 4 claims and 11 source dossiers.

    unreviewed history →
  1099. project Entered the record Registro Bici: Bogotá's Mandatory Bicycle Register

    Created the first structured Evidence Passport with 7 claims and 14 source dossiers.

    unreviewed history →
  1100. project Entered the record Réseau express métropolitain: a pension fund's driverless metro

    Created the first structured Evidence Passport with 1 claim and 11 source dossiers.

    unreviewed history →
  1101. project Entered the record Roosevelt Boulevard Automated Speed Enforcement

    Created the first structured Evidence Passport with 1 claim and 4 source dossiers.

    unreviewed history →
  1102. project Publication date recorded for 13 sources SFPUC Automated Water Meter Programme

    Recorded the two dates each source states — publication in date, a stated revision in updated, an explicit null where the source gives neither.

    unreviewed history →
  1103. project Entered the record ShakeAlertLA — the City's Earthquake Warning App

    Created the first structured Evidence Passport with 1 claim and 10 source dossiers.

    unreviewed history →
  1104. project Entered the record ShotSpotter Acoustic Gunshot Detection

    Created the first structured Evidence Passport with 1 claim and 11 source dossiers.

    unreviewed history →
  1105. project Publication date recorded for 4 sources ShotSpotter Under a Federally Funded Evaluation

    Recorded the two dates each source states — publication in date, a stated revision in updated, an explicit null where the source gives neither.

    unreviewed history →
  1106. project Entered the record Smart Columbus Operating System (Open Data Platform)

    Created the first structured Evidence Passport with 1 claim and 5 source dossiers.

    unreviewed history →
  1107. project Publication date recorded for 6 sources Smart Sewer: A Federal Consent Decree with a Sensor Network Attached

    Recorded the two dates each source states: publication where it gives one, revision where it gives that instead. The EPA settlement page and the consultant's project page state no publication date at all; the city's own Smart Sewer page stays unanswered because it refuses every automated client.

    unreviewed history →
  1108. project Publication date recorded for 6 sources The Downtown Smart City Corridor and the Expansion Nobody Was Chosen to Build

    Recorded the two dates each source states — publication in date, a stated revision in updated, an explicit null where the source gives neither.

    unreviewed history →
  1109. project Publication date recorded for 11 sources TransMiCable: the cable car that got a control group

    Recorded sources[].date on every source that states one and an explicit null on the living pages that state none, so the entry can say how old its evidence is.

    unreviewed history →
  1110. project Entered the record TransMilenio: Bogotá's BRT Trunk Network & Its Late Control Layer

    Created the first structured Evidence Passport with 1 claim and 15 source dossiers.

    unreviewed history →
  1111. project Publication date recorded for 5 sources Troika Transit Card

    Recorded sources[].date on every source that states one and an explicit null on the living pages that state none, so the entry can say how old its evidence is.

    unreviewed history →
  1112. project Entered the record Vision Zero Boston: 25 mph default limit and open crash records

    Created the first structured Evidence Passport with 1 claim and 13 source dossiers.

    unreviewed history →
  1113. project Entered the record 311 and MyKCMO: The Whole Request Record, Channel Included

    Created the first structured Evidence Passport with 8 claims and 3 source dossiers.

    unreviewed history →
  1114. project Entered the record A Free Streetcar Counted by Infrared

    Created the first structured Evidence Passport with 5 claims and 4 source dossiers.

    unreviewed history →
  1115. project Entered the record Open Data KC: A Publishing Duty Written Into Law, and No Licence

    Created the first structured Evidence Passport with 7 claims and 4 source dossiers.

    unreviewed history →
  1116. project Entered the record Prospect MAX: The East Side Corridor That Was Built, and the Kiosks That Report Their Own Failures

    Created the first structured Evidence Passport with 4 claims and 4 source dossiers.

    unreviewed history →
  1117. project Entered the record ShotSpotter Under a Federally Funded Evaluation

    Created the first structured Evidence Passport with 9 claims and 4 source dossiers.

    unreviewed history →
  1118. project Entered the record Smart Sewer: A Federal Consent Decree with a Sensor Network Attached

    Created the first structured Evidence Passport with 11 claims and 6 source dossiers.

    unreviewed history →
  1119. project Entered the record The Downtown Smart City Corridor and the Expansion Nobody Was Chosen to Build

    Created the first structured Evidence Passport with 7 claims and 6 source dossiers.

    unreviewed history →
  1120. project Entered the record Easy Ride and the Minato Mirai Autonomous Mobility Pilot

    Created the first structured Evidence Passport with 7 claims and 2 source dossiers.

    unreviewed history →
  1121. project Entered the record Futamatagawa–Sakonyama Autonomous Bus Trial

    Created the first structured Evidence Passport with 5 claims and 2 source dossiers.

    unreviewed history →
  1122. project Entered the record Minato Mirai 21 Visitor Measurement

    Created the first structured Evidence Passport with 6 claims and 2 source dossiers.

    unreviewed history →
  1123. project Entered the record Tsunashima Sustainable Smart Town

    Created the first structured Evidence Passport with 5 claims and 3 source dossiers.

    unreviewed history →
  1124. project Entered the record Yokohama Open Data Portal

    Created the first structured Evidence Passport with 3 claims and 2 source dossiers.

    unreviewed history →
  1125. project Entered the record Yokohama Smart City Project (YSCP)

    Created the first structured Evidence Passport with 5 claims and 1 source dossier.

    unreviewed history →
  1126. project Entered the record City Bus GPS Fleet Tracking & Official App

    Created the first structured Evidence Passport with 6 claims and 7 source dossiers.

    unreviewed history →
  1127. project Entered the record PPWSA: Metering Out a 72% Water Loss

    Created the first structured Evidence Passport with 15 claims and 7 source dossiers.

    unreviewed history →
  1128. project Entered the record El Metropolitano BRT

    Created the first structured Evidence Passport with 12 claims and 9 source dossiers.

    unreviewed history →
  1129. project Entered the record Línea 2 — Lima's Automated Underground Metro

    Created the first structured Evidence Passport with 12 claims and 9 source dossiers.

    unreviewed history →
  1130. project Entered the record Riyadh Advanced Traffic Control System

    Created the first structured Evidence Passport with 8 claims and 5 source dossiers.

    unreviewed history →
  1131. project Entered the record Riyadh Parking: Priced Curbs & Camera Patrols

    Created the first structured Evidence Passport with 11 claims and 5 source dossiers.

    unreviewed history →
  1132. project Entered the record Riyadh Bus Network & darb App

    Created the first structured Evidence Passport with 10 claims and 8 source dossiers.

    unreviewed history →
  1133. project Entered the record Citywide Facial-Recognition Camera Network

    Created the first structured Evidence Passport with 11 claims and 6 source dossiers.

    unreviewed history →
  1134. project Entered the record Remote Electronic Voting (DEG)

    Created the first structured Evidence Passport with 14 claims and 6 source dossiers.

    unreviewed history →
  1135. project Entered the record Paid Parking Zone with Camera-Car Enforcement

    Created the first structured Evidence Passport with 14 claims and 6 source dossiers.

    unreviewed history →
  1136. project Entered the record Face Pay — Facial-Recognition Fares in the Metro

    Created the first structured Evidence Passport with 11 claims and 6 source dossiers.

    unreviewed history →
  1137. project Entered the record Troika Transit Card

    Created the first structured Evidence Passport with 9 claims and 5 source dossiers.

    unreviewed history →
  1138. project Entered the record Ravi Riverfront: A New City Mostly Still on Paper

    Created the first structured Evidence Passport with 7 claims and 4 source dossiers.

    unreviewed history →
  1139. project Entered the record LWMC Waste Fleet GPS Tracking & Suthra Punjab Dashboard

    Created the first structured Evidence Passport with 6 claims and 3 source dossiers.

    unreviewed history →
  1140. project Entered the record Punjab EPA Air Monitoring Network & Smog Emergency Orders

    Created the first structured Evidence Passport with 6 claims and 5 source dossiers.

    unreviewed history →
  1141. project Entered the record Orange Line Metro: Automated Trains, Drivers in the Cab

    Created the first structured Evidence Passport with 11 claims and 5 source dossiers.

    unreviewed history →
  1142. project Entered the record ITIS: The Traffic Camera Network Bought Twice

    Created the first structured Evidence Passport with 9 claims and 5 source dossiers.

    unreviewed history →
  1143. project Entered the record MRT Kajang & Putrajaya Lines: GoA4 as the Baseline

    Created the first structured Evidence Passport with 7 claims and 3 source dossiers.

    unreviewed history →
  1144. project Entered the record Kelana Jaya Line: Driverless Since 1998

    Created the first structured Evidence Passport with 9 claims and 5 source dossiers.

    unreviewed history →
  1145. project Entered the record SMART Tunnel: Motorway That Yields to Floodwater

    Created the first structured Evidence Passport with 12 claims and 6 source dossiers.

    unreviewed history →
  1146. project Entered the record Prepaid Meters on a Grid Run by Phone

    Created the first structured Evidence Passport with 11 claims and 5 source dossiers.

    unreviewed history →
  1147. project Entered the record Bankak: a Banking App as Wartime Lifeline

    Created the first structured Evidence Passport with 10 claims and 6 source dossiers.

    unreviewed history →
  1148. project Entered the record KWSC Online Tanker Booking and Unified App

    Created the first structured Evidence Passport with 8 claims and 4 source dossiers.

    unreviewed history →
  1149. project Entered the record K-Electric's Published Feeder-Level Load-Shedding Regime

    Created the first structured Evidence Passport with 10 claims and 5 source dossiers.

    unreviewed history →
  1150. project Entered the record Karachi Safe City: Cameras 13 Years After the Announcement

    Created the first structured Evidence Passport with 10 claims and 5 source dossiers.

    unreviewed history →
  1151. project Entered the record Peoples Bus Service Live-Tracking App

    Created the first structured Evidence Passport with 10 claims and 6 source dossiers.

    unreviewed history →
  1152. project Entered the record Green Line BRT and the Breeze Fare System

    Created the first structured Evidence Passport with 11 claims and 5 source dossiers.

    unreviewed history →
  1153. project Entered the record Open-Loop Transit Payments & MultiPass

    Created the first structured Evidence Passport with 7 claims and 6 source dossiers.

    unreviewed history →
  1154. project Entered the record SAWACO Water-Loss Reduction & District Metering

    Created the first structured Evidence Passport with 9 claims and 6 source dossiers.

    unreviewed history →
  1155. project Entered the record 1022 Citizen Reporting Portal

    Created the first structured Evidence Passport with 9 claims and 5 source dossiers.

    unreviewed history →
  1156. project Entered the record HCMC Metro Line 1 (Bến Thành–Suối Tiên)

    Created the first structured Evidence Passport with 9 claims and 6 source dossiers.

    unreviewed history →
  1157. project Entered the record iParking: the Parking App That Never Controlled a Space

    Created the first structured Evidence Passport with 8 claims and 3 source dossiers.

    unreviewed history →
  1158. project Entered the record Cashless E-Ticketing on the Bus Network

    Created the first structured Evidence Passport with 8 claims and 4 source dossiers.

    unreviewed history →
  1159. project Entered the record Air Quality Monitoring Network

    Created the first structured Evidence Passport with 9 claims and 5 source dossiers.

    unreviewed history →
  1160. project Entered the record iHanoi Citizen App

    Created the first structured Evidence Passport with 8 claims and 5 source dossiers.

    unreviewed history →
  1161. project Entered the record Hanoi Metro: Two Lines, a Driver in Every Cab

    Created the first structured Evidence Passport with 14 claims and 7 source dossiers.

    unreviewed history →
  1162. project Entered the record Open Data Portal with Zero-Attribution Default

    Created the first structured Evidence Passport with 7 claims and 3 source dossiers.

    unreviewed history →
  1163. project Entered the record NOX-Block Lamppost EV Charging

    Created the first structured Evidence Passport with 10 claims and 4 source dossiers.

    unreviewed history →
  1164. project Entered the record Citywide LoRaWAN Network & DOdata Hub

    Created the first structured Evidence Passport with 7 claims and 3 source dossiers.

    unreviewed history →
  1165. project Entered the record H-Bahn Driverless Suspended Monorail

    Created the first structured Evidence Passport with 13 claims and 4 source dossiers.

    unreviewed history →
  1166. project Entered the record Driverless Shuttle Pilots in Open Traffic

    Created the first structured Evidence Passport with 14 claims and 7 source dossiers.

    unreviewed history →
  1167. project Entered the record e-Parking & the Energy Piggy Bank

    Created the first structured Evidence Passport with 6 claims and 5 source dossiers.

    unreviewed history →
  1168. project Entered the record Masdar City

    Created the first structured Evidence Passport with 1 claim and 5 source dossiers.

    unreviewed history →
  1169. project Entered the record Metrocable & Social Urbanism

    Created the first structured Evidence Passport with 8 claims and 4 source dossiers.

    unreviewed history →
  1170. project Entered the record Nusantara — Smart Forest Capital

    Created the first structured Evidence Passport with 1 claim and 8 source dossiers.

    unreviewed history →
  1171. project 9 claims added Virtual Singapore: National 3D City Model and Digital Twin

    Story page upgraded to the full showcase standard: finding block, nine story claims anchored in the article, author record note, and the duplicate lede removed so the teaser is not repeated.

    unreviewed history →
  1172. project Entered the record Yangshan Port Phase IV automated container terminal

    Created the first structured Evidence Passport with 2 claims and 6 source dossiers.

    unreviewed history →
  1173. project 2 claims added Busan-Gimhae Light Rail and Its Revenue Guarantee

    Dollar equivalents added alongside won figures for readers, and the 2020 Gimhae payment split from its ridership comparison so the conversion sits outside the claim anchor; ledger goes from 15 to 16 claims.

    unreviewed history →
  1174. project Entered the record Cairo Monorail: the East Nile Line to the New Capital

    Created the first structured Evidence Passport with 3 claims and 9 source dossiers.

    unreviewed history →
  1175. project Entered the record Hoy No Circula: Mexico City's Plate-Based Driving Restriction

    Created the first structured Evidence Passport with 12 claims and 9 source dossiers.

    unreviewed history →
  1176. project Entered the record Lamppost-as-a-Platform Sensor Trial

    Created the first structured Evidence Passport with 3 claims and 7 source dossiers.

    unreviewed history →
  1177. project Entered the record Maasvlakte II Automated Container Terminals

    Created the first structured Evidence Passport with 2 claims and 3 source dossiers.

    unreviewed history →
  1178. project Entered the record Maeslant Barrier: the Closure Decision Is Not a Person's

    Created the first structured Evidence Passport with 2 claims and 4 source dossiers.

    unreviewed history →
  1179. project Entered the record Busan-Gimhae Light Rail and Its Revenue Guarantee

    Created the first structured Evidence Passport with 15 claims and 8 source dossiers.

    unreviewed history →
  1180. project 26 claims added SFPUC Automated Water Meter Programme

    Extended the claim ledger from 17 to 43: the long-form story page is now claim-anchored throughout (26 story-field claims), so expert mode can mark nearly every factual passage in the article.

    unreviewed history →
  1181. project Entered the record SFPUC Automated Water Meter Programme

    Created the first structured Evidence Passport with 17 claims and 13 source dossiers.

    unreviewed history →
  1182. project Entered the record NSW Air Quality Monitoring Network (Sydney Stations)

    Created the first structured Evidence Passport with 2 claims and 4 source dossiers.

    unreviewed history →
  1183. project Entered the record NSW Spatial Digital Twin

    Created the first structured Evidence Passport with 4 claims and 5 source dossiers.

    unreviewed history →
  1184. project Entered the record Opal Card & Contactless Tap and Pay

    Created the first structured Evidence Passport with 2 claims and 7 source dossiers.

    unreviewed history →
  1185. project Entered the record Sydney Metro Driverless Rapid Transit

    Created the first structured Evidence Passport with 3 claims and 6 source dossiers.

    unreviewed history →
  1186. project Entered the record Sydney Water's Smart Meter Pilot and Rollout Plan

    Created the first structured Evidence Passport with 3 claims and 4 source dossiers.

    unreviewed history →
  1187. project Entered the record Transport for NSW Real-Time Open Data Hub

    Created the first structured Evidence Passport with 3 claims and 5 source dossiers.

    unreviewed history →
  1188. project Entered the record Buenos Aires's Fugitive Facial Recognition System, stopped by the courts

    Created the first structured Evidence Passport with 1 claim and 10 source dossiers.

    unreviewed history →
  1189. project Entered the record CharlieCard and the AFC 2.0 Fare System Replacement

    Created the first structured Evidence Passport with 12 claims and 18 source dossiers.

    unreviewed history →
  1190. project Entered the record CHI311 Service Requests and the Audit of "Completed"

    Created the first structured Evidence Passport with 2 claims and 6 source dossiers.

    unreviewed history →
  1191. project Entered the record Day Zero: Cape Town's Drought Demand Management

    Created the first structured Evidence Passport with 1 claim and 10 source dossiers.

    unreviewed history →
  1192. project Entered the record Delhi Smog Towers, Connaught Place & Anand Vihar

    Created the first structured Evidence Passport with 1 claim and 8 source dossiers.

    unreviewed history →
  1193. project Entered the record Heat Action Plan

    Created the first structured Evidence Passport with 1 claim and 3 source dossiers.

    unreviewed history →
  1194. project Entered the record Johannesburg Water: Pressure Control and Night-Flow Telemetry Against Water Losses

    Created the first structured Evidence Passport with 1 claim and 6 source dossiers.

    unreviewed history →
  1195. project Entered the record METRORapid Silver Line: Houston's First BRT Corridor

    Created the first structured Evidence Passport with 2 claims and 5 source dossiers.

    unreviewed history →
  1196. project Entered the record TransMiCable: the cable car that got a control group

    Created the first structured Evidence Passport with 1 claim and 11 source dossiers.

    unreviewed history →
  1197. project Entered the record Virtual Singapore: National 3D City Model and Digital Twin

    Created the first structured Evidence Passport with 5 claims and 10 source dossiers.

    unreviewed history →

Weekly publication record

🧾 Verification log — 111 claims individually verified by the author

Most of this atlas is AI-generated and says so. On top of that sits a slower, personal layer: the author opens a claim's source, reads the passage it rests on, and marks it verified — one claim at a time, through an authenticated review tool, each session ending in a public pull request. This is the running tally of that work.