clm-e950a4fe8452d2ed
quantitative
8.7 km, 7 stations, 198 twelve-seat cabins between Anosy and Ambatobe
Permanent project revision
Revision 2026-08-22-evidence-baseline · effective 2026-08-07
Current revision. This is the snapshot used by the live entity page.
Created the first structured Evidence Passport with 10 claims and 5 source dossiers.
sha256:aee1cac88c5a26b041d2ec7c8480bc3b00a1afb8f54d36bcd19e8c39621cccf5
add /evidencePassport — Added claim-level evidence mapping and source dossiers.add /revisionHistory — Established a permanent, hash-addressed baseline revision.The text below is copied verbatim from the published record. Each claim names the source dossiers that carry it; caveats stay attached to the claim they qualify.
clm-e950a4fe8452d2ed
quantitative
8.7 km, 7 stations, 198 twelve-seat cabins between Anosy and Ambatobe
clm-812dc7b3e76a3a92
quantitative
opened in August 2025
clm-505307e8b0cf2a68
quantitative
has not carried a passenger since 25 September 2025
clm-c722970e39ceaff6
descriptive
protesters vandalized and burned stations on the first day of the Gen Z uprising
clm-0f935584a37f9fcf
descriptive
that brought down President Rajoelina
clm-5a95da79bbc53b0f
descriptive
a movement itself sparked by the city's chronic water and power cuts
clm-63403b2a1e1515f8
descriptive
transition president Michaël Randrianirina confirmed there is no restart plan ('with what electricity are we going to run it?')
clm-73a6e791c55d45cc
descriptive
calling the line no priority for Madagascar
clm-88f635f56e96593a
quantitative
his government has asked France to cancel the roughly €152 million in loans that financed the build
clm-5527dd05d426a8c8
descriptive
a request Paris has so far neither accepted nor rejected
This layer records what is known about each source, what is still missing, and the exact snapshot this page is rendering. A missing date, archive or hash stays visible as missing.
Awaiting operator and domain-expert review; publication of this revision implies neither.
sha256:aee1cac88c5a26b041d2ec7c8480bc3b00a1afb8f54d36bcd19e8c39621cccf5
src-ae0b796578aded2cInauguration and line specifications (8.7 km, 7 stations, Anosy-Ambatobe).
src-9668565993630d71Technical specifications: 198 twelve-seat cabins, builder Colas-POMA.
src-a37b2834cfc02f72Randrianirina on state TV: no restart plan, not a priority, diesel generators not viable, debt-cancellation request pending — 'jusqu'ici, rien n'avance'.
src-71330f05f7da22a8Standstill since 25 Sept 2025 after Gen Z vandalism; €152M in two French loans (Trésor + BPI France export guarantee, agreement 20 Sept 2021); France has neither accepted nor rejected cancellation.
src-c4b31e7bfb7c4376Protests began 25 Sept 2025 over chronic water/power cuts; cable-car stations burned; Rajoelina impeached 14 Oct; Randrianirina inaugurated 17 Oct 2025.