clm-e950a4fe8452d2ed
quantitative
8.7 km, 7 stations, 198 twelve-seat cabins between Anosy and Ambatobe
Permanent project revision
Revision 2026-10-05-p4-quality-run · effective 2026-10-05
Current revision. This is the snapshot used by the live entity page.
Quality run to P4: claim array, source dates, present-tense audit. The line has stayed shut since 25 September 2025, but the snippet's June 2026 picture is incomplete: on 12 and 20 June 2026 the transport ministry called a restart a priority with an end-2026 target, and France's ambassador said Paris was open to talks on the debt. The presidency's inauguration page is gone (404); RFI's launch report replaces it and adds that the line opened four hours a day on generators for
sha256:638797f86bf70a09af134c6607579245fb89999d8f6d3047039f93a789f694b3
replace /snapshot/projectFingerprint — Updated projectFingerprint to the current sourced project record.replace /snapshot/asOf — Updated asOf to the current sourced project record.replace /snapshot/claims — Updated claims to the current sourced project record.replace /snapshot/sources — Updated sources to the current sourced project record.The text below is copied verbatim from the published record. Each claim names the source dossiers that carry it; caveats stay attached to the claim they qualify.
clm-e950a4fe8452d2ed
quantitative
8.7 km, 7 stations, 198 twelve-seat cabins between Anosy and Ambatobe
clm-812dc7b3e76a3a92
quantitative
opened in August 2025
clm-505307e8b0cf2a68
quantitative
has not carried a passenger since 25 September 2025
clm-c722970e39ceaff6
descriptive
protesters vandalized and burned stations on the first day of the Gen Z uprising
clm-0f935584a37f9fcf
descriptive
that brought down President Rajoelina
clm-5a95da79bbc53b0f
descriptive
a movement itself sparked by the city's chronic water and power cuts
clm-63403b2a1e1515f8
descriptive
transition president Michaël Randrianirina confirmed there is no restart plan ('with what electricity are we going to run it?')
clm-73a6e791c55d45cc
descriptive
calling the line no priority for Madagascar
clm-88f635f56e96593a
quantitative
his government has asked France to cancel the roughly €152 million in loans that financed the build
clm-57c731f49f3c8690
quantitative
a request Paris had neither accepted nor rejected by February 2026
clm-5b8777df9ce04f9a
quantitative
Ten days after his broadcast, the transport ministry called a restart a priority and set a goal of reopening the network, Ivandry–Ambatobe first, by the end of 2026
clm-a029e2f5a7d20ab8
descriptive
France's ambassador said Paris was open to talks
clm-1708dba54ca4527e
quantitative
No reopening had been reported by October 2026
clm-b3d83de071f60a79
descriptive
the line opened running four hours a day on diesel generators because Antananarivo could not yet power it
clm-882b87cf584008b4
descriptive
the question its own transition president put — with what electricity are we going to run it — has outlived both the service and the government that ordered it
This layer records what is known about each source, what is still missing, and the exact snapshot this page is rendering. A missing date, archive or hash stays visible as missing.
Awaiting operator and domain-expert review; publication of this revision implies neither.
sha256:638797f86bf70a09af134c6607579245fb89999d8f6d3047039f93a789f694b3
src-9668565993630d71Technical specifications: 198 twelve-seat cabins, builder Colas-POMA.
src-a37b2834cfc02f72Randrianirina on state TV: no restart plan, not a priority, diesel generators not viable, debt-cancellation request pending — 'jusqu'ici, rien n'avance'.
src-71330f05f7da22a8Standstill since 25 Sept 2025 after Gen Z vandalism; €152M in two French loans (Trésor + BPI France export guarantee, agreement 20 Sept 2021); France has neither accepted nor rejected cancellation.
src-c4b31e7bfb7c4376Protests began 25 Sept 2025 over chronic water/power cuts; cable-car stations burned; Rajoelina impeached 14 Oct; Randrianirina inaugurated 17 Oct 2025.
src-ec675af0f6f1648eRFI report: the orange cabins had opened to the public the week before, running four hours a day partly because of the capital's daily power cuts, on diesel generators; the government promised full operation once 100 MW of solar capacity was in place. Replaces the presidency's inauguration page, which no longer exists.
src-c5c7ca05a2fb6671Transport ministry: restarting the cable car is among its priorities; Ivandry–Ambatobe to reopen first, whole network targeted by end-2026; loans to be repaid until 2034.
src-b7caa1c951dfd311French ambassador Arnaud Guillois says France is available to discuss the cable-car debt and notes the minister's wish to see it running again by year-end.