clm-7f66126c7b3cbbcb
quantitative
Line 6 opened on 2 November 2017 and Line 3 on 22 January 2019 as unattended lines
Permanent project revision
Revision 2026-08-20-claim-baseline · effective 2026-07-26
Superseded. A later revision exists: 2026-08-21-vendor-grade-correction →
Created the first structured Evidence Passport with 12 claims and 10 source dossiers.
sha256:ff1af89448d24dc80e110f4eecc533ca43fedb62c572d72a1f0468c3905b3276
add /evidencePassport — Added claim-level evidence mapping and source dossiers.add /revisionHistory — Established a permanent, hash-addressed baseline revision.The text below is copied verbatim from the published record. Each claim names the source dossiers that carry it; caveats stay attached to the claim they qualify.
clm-7f66126c7b3cbbcb
quantitative
Line 6 opened on 2 November 2017 and Line 3 on 22 January 2019 as unattended lines
clm-207db1c2af96fa7b
quantitative
the CAF AS-2014 trains built for them have no driver's cab, only a concealed console for taking a train over by hand when something fails
clm-ee71d806220de97b
quantitative
Thales supplied SelTrac communications-based train control across both lines, 37 km, 28 stations and 37 trains, and describes it as running in fully driverless mode, GoA4, designed for a 90-second headway behind platform screen doors
clm-ccb1adac1e94c49e
quantitative
Metro's own expansion engineering manager called the pair "Conduccion sin Operador" ten months before Line 6 opened
clm-692e6d3e9af06974
quantitative
a Chilean outlet reported in 2019 that the driver had been replaced by a control room passengers never see, at a cost the union put at about 150 jobs per new line
clm-1d23079b3e4a4594
quantitative
Line 1 was retrofitted with Alstom's Urbalis CBTC under a 2010 contract meant to cut the headway from 105 to 80 seconds, a capacity upgrade rather than a step towards running without staff
clm-d71f7f893a8d33fe
quantitative
Thales puts the two automated lines at 37 km, 28 stations and 37 trains running SelTrac CBTC in fully driverless mode (GoA4), with a 90-second design headway and capacity above 29,300 passengers per hour per direction
clm-6dfa42e267fbc57a
quantitative
Railway Technology valued the December 2013 CAF-Thales trains-and-signalling contract at US$451.9M including 20 years of maintenance
clm-472ff0f0750dfc11
quantitative
Metro's record 721 million trips and 2.47 million weekday trips in 2018 fell to 544.4 million and 1.84 million in 2022
clm-4a596b50b9645ae1
quantitative
stood at 640 million and about 2.1 million in 2024, when the company's loss deepened to CLP 358 billion
clm-538ceecc3e07c5f3
quantitative
Metro reported 99% compliance with its scheduled service for 2025 and said in June 2026 that demand had come close to historical levels
clm-d88bc3f75fe07db2
descriptive
The test of a driverless claim is not the grade a supplier certifies but whether the trains were built with a cab
This layer records what is known about each source, what is still missing, and the exact snapshot this page is rendering. A missing date, archive or hash stays visible as missing.
Awaiting operator and domain-expert review; publication of this revision implies neither.
sha256:ff1af89448d24dc80e110f4eecc533ca43fedb62c572d72a1f0468c3905b3276
src-dec75548579a5610The load-bearing automation sentence: lines 3 and 6, 37 km, 28 stations and 37 trains equipped with SelTrac CBTC "with a fully driverless mode of operation (GoA4)", automatic interoperability between the two lines, 90-second design headway, capacity above 29,300 passengers per hour per direction. Two direct fetches returned an empty body; the text was read from the search index and matches Thales' separate Santiago press release.
src-4b053226626de615Fetched. The operator's own language, from Hector Gonzalez Garrido, engineering manager of Metro's expansion division, ten months before Line 6 opened: "Conduccion sin Operador, automatizando los procesos mediante la utilizacion de tecnologia de ultima generacion". Also describes front evacuation, which is only possible on a train without a cab. Does not name the CBTC supplier or a headway.
src-ea43fd4b7d8ac028Fetched. The simulator supplier that trains Metro's staff, and the source for what unattended running means here: the trains are UTO, "each UTO train has a concealed control panel to enable the train to be operated manually when necessary", and Metro has had the simulator since 2016 to train staff for lines 3 and 6, with intensive training before the Line 3 opening on 22 January 2019. It describes intervention during incidents, not a driver riding each service.
src-c4b439c2bd3426b7Fetched. Independent Chilean outlet and the entry's counterweight: "el conductor del tren ha sido reemplazado por una sala de control invisible para los pasajeros"; union president Eric Campos puts the loss at about 150 jobs per new line; roughly 140 Metro staff work on Line 6, fewer than on older lines. Corroborates that no driver travels with the train.
src-94134e55a72e753cTrade press dating the Line 6 opening to 2 November 2017 by President Bachelet, Cerrillos to Los Leones, 15.3 km underground, 10 stations, CAF-Thales trainsets, Thales CBTC designed for 90-second headways. Direct fetch returned 403; the headline, outlet and content were confirmed through search. A companion article, "Santiago opens second driverless metro line", covers Line 3.
src-285f525be2ed583cFetched. Dates the contract to 15 December 2013 and values it at US$451.9M for lines 3 and 6, CAF supplying trains and Thales the SelTrac CBTC, with a 20-year maintenance agreement. It also quotes a throughput of about 50,000 passengers per hour, a differently defined figure from Thales' 29,300 per hour per direction; the entry uses only the Thales figure and neither is presented as the other's confirmation.
src-e4e60f40a7a0387cSource for the Line 1 retrofit: an Alstom contract of about US$70M covering design, manufacture, installation, commissioning and three years of maintenance of Urbalis CBTC, awarded in January 2010, intended to cut the interval between trains from 105 to 80 seconds and raise passengers per hour by 20%, installed without interrupting service. Direct fetch returned HTTP 429; the figures were read from the search index. No automation grade is stated, and the entry claims none for Line 1 beyond the fact that its trains keep drivers.
src-6b52108fc8a88ed5Fetched. Currency check and operator-reported service figures for 2025: 99% compliance with programmed service, average wait of 1 minute 40 seconds, internal incidents down 43.5%, an investment plan of about US$1.3bn over ten years, Line 7 at 39% with more than 16 km of tunnel excavated, Line 6 extension at 36.6%, and general manager Felipe Bravo saying demand came close to historical levels. It gives no annual ridership or financial totals.
src-975c06f2aa5acfbfFetched. The pre-2019 baseline: 721 million trips and 2.47 million weekday trips in 2018, against 544.4 million and 1.84 million in 2022, 24.5% below the peak, with Metro attributing the shortfall to the economy, hybrid work, online services and a shift to cars and bicycles.
src-0b2750cb8cde85b4Fetched. Press reporting of Metro's own 2024 results: 640 million trips, up 41 million (+6.8%) on 2023, 2.1 million on a working day, passenger revenue of CLP 456.411bn (+19.1%), and a loss deepening to CLP 358bn from CLP 222bn, driven by financial costs up 70.9%.