clm-c146b87f64a6c1ba
descriptive
fully automated, with no driver
Permanent project revision
Revision 2026-08-20-source-dates · effective 2026-07-26
Current revision. This is the snapshot used by the live entity page.
Recorded sources[].date on every source that states one and an explicit null on the living pages that state none, so the entry can say how old its evidence is.
sha256:4cdf18e2ad9afa4b1c5f7f4de0a6debbc018f959d777e69a22cff280e6c21b11
replace /snapshot/projectFingerprint — Updated projectFingerprint to the current sourced project record.replace /snapshot/sources — Updated sources to the current sourced project record.The text below is copied verbatim from the published record. Each claim names the source dossiers that carry it; caveats stay attached to the claim they qualify.
clm-c146b87f64a6c1ba
descriptive
fully automated, with no driver
clm-1641ddd8ec354d98
quantitative
The line is 23.9 km long and has 21 stations
clm-d51adc16fbc0fbf3
quantitative
It projected 176,358 riders a day in the opening year, rising to 322,545 by 2031
clm-5a486192c78904a8
quantitative
On the day it opened, the line carried 30,084 riders
clm-6971ce29b4ec1bf2
quantitative
Gimhae's support payment for 2020 alone was 48.6 billion won
clm-62c33287a7b57542
quantitative
against ridership of 34,752 a day where the forecast had promised 272,220
clm-2220b670135f5898
quantitative
By 2024 the annual payment across both cities had reached 84.1 billion won
clm-d391f2ab0dd7bc97
quantitative
Gimhae carries 63.19 percent of the cost and Busan 36.81 percent
clm-d0039e28a7bb5ba5
quantitative
Busan and Gimhae paid 906.8 billion won in support payments over 2011-2025
clm-7cb5af254cce4956
quantitative
they are contractually liable for at least 1.0898 trillion won more through 2041
clm-47888f53eb33ce56
quantitative
The original minimum revenue guarantee ran from September 2011 to March 2017, when it was replaced by a cost-compensation arrangement running through 2041
clm-bc0955a3ff20e6f2
quantitative
The renegotiation cut the projected remaining burden by roughly 304 billion won
clm-9babc150669e37d8
descriptive
The trains are two-car sets built by Hyundai Rotem
clm-15075be2ed3db22a
quantitative
from 30,084 a day at opening to 45,821 in 2024
clm-ff55c3ebc98c686c
quantitative
Uijeongbu's light rail, which opened in 2012, carried well under half its projected ridership and costs its city on the order of 20 billion won a year
clm-e65fa8b4f3f0e034
descriptive
in Yongin, a former mayor's liability in damages over the city's light rail was confirmed by the Supreme Court
This layer records what is known about each source, what is still missing, and the exact snapshot this page is rendering. A missing date, archive or hash stays visible as missing.
Awaiting operator and domain-expert review; publication of this revision implies neither.
sha256:4cdf18e2ad9afa4b1c5f7f4de0a6debbc018f959d777e69a22cff280e6c21b11
src-c2af622a9a9f920cSentence-level source for the forecast and its author: the Korea Transport Institute projected 176,358 riders/day at 2011 opening, 211,147 by 2014 and 322,545 by 2031; actual opening-day ridership was 30,084 (20% of forecast); 2024 ridership 45,932/day; 2024 support payments 84.2bn won; April 2017 switch from MRG to 25-year cost compensation (MCC) running to 2041; public liability cut from 1.7963tn to 1.4919tn won.
src-ef495553f07849e9Authoritative city source for the contractual mechanism: press release of 5 April 2017 announcing abolition of the minimum revenue guarantee and its replacement by minimum cost compensation; revised agreement signed 24 March 2017, effective 1 April 2017; concessionaire, operating company and maintenance contractor merged into direct operation; private return cut from 14.56% to 3.34%; savings of about 304.4bn won to 2041.
src-aed164cc97a8ee6cMost recent source, April 2026: the two cities paid 906.8bn won in support payments over 2011-2025 (Gimhae 572.4bn, Busan 334.4bn) and must pay at least 1.0898tn won more from 2026 to 2041; confirms the subsidy is an active political issue in the 2026 Gimhae mayoral race, including a 17 March 2026 meeting with the transport minister.
src-1510a1616ac15422Independent confirmation of the payment split and the 2024 gap: cumulative support of 519.1bn won (Gimhae) and 302.8bn won (Busan) since 2011; 2024 payments of 52.9bn and 31.2bn won; forecast of 306,000 riders/day for 2024 against about 45,000 actual; Gimhae's request for national cost-sharing in the 2027 budget.
src-c84463cc3335f411Source for the 2024 and 2025 ridership figures used in the entry: 45,821 riders/day in 2024, equal to 14.9% of the 306,000 forecast for that year, and 45,689/day over January-May 2025.
src-4647d109f777759cSource for the opening date (revenue service from 17 September 2011) and for the COVID trough used as the recovery baseline: 34,752 riders/day in 2020, with 48.6bn won paid in support that year.
src-a0159a68aed0f6c5Official site of the BTO concessionaire that has run the line directly since the 2017 restructuring; confirms the line is in normal operation in 2026.
src-0a5ad2fb460befb7Used only for the technical specification: 23.9 km, 21 stations, standard gauge, 750 V DC third rail, Thales SelTrac CBTC moving-block signalling and fully automated driverless operation. Note that this page presents 176,000 riders/day as design capacity; the Korean sources above show it is in fact the opening-year demand forecast.