Open original source ↗
- Stable source ID
src-77901fa1fc0b5db1
- Publisher
- Name not classified · iskraemeco.com
- Type / language
- web-page · language not classified
- Published
- 2024-12-20
- Updated
- 2025-01-16
- Source last checked
- No source-level check date
- Record last verified
- 2026-07-26
- Dossier created
- 2026-10-15
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
Open the recorded source note
Records the factory acceptance test of the IE.5 single-phase meters at Kranj, Slovenia, with NCEDC, TEPSCO, EEHC and Elsewedy Electric T&D present. The page shows no date on screen; its metadata dates the post 20 December 2024 (revised 16 January 2025), so the test had taken place by then. It is cited as confirmation that the meters reached acceptance testing, not as a measure of rollout progress.
Descriptive only — not page/paragraph exact
- Claims linked
- Background source; no baseline claim points here