Guangzhou Port Group's Nansha Phase IV terminal, opened 28 July 2022, was presented at its opening as the Guangdong-Hong Kong-Macao Greater Bay Area's first fully automated container terminal
Permanent project revision
Revision 2026-09-27-popular-uplift-2 · effective 2026-09-27
Current revision. This is the snapshot used by the live entity page.
Popular-entry uplift: sources re-read and dated, full claim array, stale or unsupported passages corrected against the sources, and the 2026 status checked.
sha256:1ea6e763455eccd648820ba320710368223f348a0c9553c3233ed52c3bd5f278
replace /snapshot/projectFingerprint — Updated projectFingerprint to the current sourced project record.replace /snapshot/asOf — Updated asOf to the current sourced project record.replace /snapshot/claims — Updated claims to the current sourced project record.replace /snapshot/sources — Updated sources to the current sourced project record.The text below is copied verbatim from the published record. Each claim names the source dossiers that carry it; caveats stay attached to the claim they qualify.
clm-241e8af29ce47d83
quantitative
Guangzhou Port Group's Nansha Phase IV terminal, opened 28 July 2022, was presented at its opening as the Guangdong-Hong Kong-Macao Greater Bay Area's first fully automated container terminal
clm-ce07d12cff4b6569
descriptive
automated quay cranes hand containers to intelligent guided vehicles (IGVs) routed by an AI scheduling system the operator calls the terminal's "Super Brain," with automated yard cranes replacing on-site crews
clm-f4a10994167d2856
descriptive
State media also call it China's first fully automated terminal for river-sea-rail multimodal transport
clm-a8bc7cbc56c87b5a
quantitative
it has four 100,000-tonne berths and 4.9 million TEU/year design capacity
clm-b2519ca8119d1241
quantitative
Container throughput through the automated terminal reached 1.81 million TEUs between January and mid-August 2024, up 102.7% year-on-year
clm-1f221da78fec2327
quantitative
the operator reports roughly 70% lower manpower needs than a conventional terminal
clm-6c20c64d277e85c0
quantitative
Phase V won Ministry of Transport approval for its deep-water shoreline in March 2025
clm-3d2749e0dbee9743
quantitative
began full construction on 15 May 2026
clm-c17027dc3605e04a
descriptive
though neither announcement says whether it will be automated
clm-691c1f34e9512c7c
quantitative
In May 2026 Phase IV was cleared to receive foreign-flagged vessels.
clm-912bfbfab2cd91ea
quantitative
1.81 million TEUs handled by the automated terminal from January to mid-August 2024, up 102.7% year-on-year
clm-f58d1110fec15269
quantitative
operator-reported ~70% lower manpower requirement than a conventional terminal
clm-ba59faa20c0c11da
quantitative
The design figure the operator gives — 4.9 million TEUs a year
clm-1cfcdd2fe54ed547
quantitative
What is published is a manpower saving of about 70%, quoted by the terminal's own general manager
clm-d2729b6cd4bb7f26
quantitative
Phase V won its shoreline approval in March 2025 and went into full construction in May 2026
This layer records what is known about each source, what is still missing, and the exact snapshot this page is rendering. A missing date, archive or hash stays visible as missing.
Awaiting operator and domain-expert review; publication of this revision implies neither.
sha256:1ea6e763455eccd648820ba320710368223f348a0c9553c3233ed52c3bd5f278
src-a3b656520eb61e2dPublished 1 August 2022. Source for the opening date, the IGV and crane choreography, and two operator statements from He Yeke, general manager of Nansha Phase IV: four 100,000-tonne berths with a total annual handling capacity of 4.9 million TEUs, and 'The automated terminal saves about 70 percent of manpower and guarantees a higher level of safety for production.'
src-90b1382770766142Nansha Port area passes 20 million TEUs in 2024; the fully automated Phase IV terminal passed completion acceptance in November 2024, and construction of Phase V was under way. It does not give a throughput figure for the automated terminal itself.
src-81370bec638a4b5cFrom the start of 2024 to mid-August, the Phase IV terminal handled 1.81 million TEUs, up 102.7% year on year; describes the 'Super Brain' scheduling system and calls the terminal China's first fully automated terminal for river-sea-rail multimodal transport. Published before Phase V was approved.
src-516e0d6f860365bdGuangzhou Daily front page: the Ministry of Transport has approved use of deep-water port shoreline for Nansha Phase V — four 200,000-tonne container berths, 15 barge berths, design capacity above 6 million TEU a year. Says nothing about automation.
src-4ee9113cd898ae37Guangzhou's official English portal: full-scale construction of Nansha Phase V began on 15 May 2026, with an estimated investment of 14.447 billion yuan and a design capacity of 6.7 million TEU a year. The announcement does not describe the terminal's level of automation.
src-a55495088c6237b7The Phase IV terminal was among three Nansha terminals approved to receive foreign-flagged vessels on 22 May 2026; the article calls it the world's first fully automated river-sea intermodal container terminal.