clm-7dc4e7088b28112c
quantitative
Nagoya opened SRT (Smart Roadway Transit) on 13 February 2026
Permanent project revision
Revision 2026-08-22-evidence-baseline · effective 2026-08-02
Current revision. This is the snapshot used by the live entity page.
Created the first structured Evidence Passport with 8 claims and 4 source dossiers.
sha256:4d2b8e913afc567cad1e561bed3f7890bb8756615474f0a327d9e033f2aa1748
add /evidencePassport — Added claim-level evidence mapping and source dossiers.add /revisionHistory — Established a permanent, hash-addressed baseline revision.The text below is copied verbatim from the published record. Each claim names the source dossiers that carry it; caveats stay attached to the claim they qualify.
clm-7dc4e7088b28112c
quantitative
Nagoya opened SRT (Smart Roadway Transit) on 13 February 2026
clm-1cabfdd8d70844a1
quantitative
a 5.6 km, seven-stop corridor linking Nagoya Station and Sakae
clm-a335403c88052fc8
descriptive
with Meitetsu Bus operating the vehicles
clm-690cc8b8628b5b8b
quantitative
Its 18-metre, 122-passenger articulated bus
clm-3f0b48e8b4538b38
descriptive
carries a real-time position-tracking system riders can check online
clm-2c388b81f6f6c4f7
descriptive
plus digital signage at stops
clm-8c5b69229d117000
descriptive
For now the line runs only Friday through Monday
clm-8bbc75f5eb123691
descriptive
several trips a day
This layer records what is known about each source, what is still missing, and the exact snapshot this page is rendering. A missing date, archive or hash stays visible as missing.
Awaiting operator and domain-expert review; publication of this revision implies neither.
sha256:4d2b8e913afc567cad1e561bed3f7890bb8756615474f0a327d9e033f2aa1748
src-921444118bfe5e35official city project site (route, real-time tracking); JS-rendered, could not be fetched directly, referenced via search snippets
src-eb96349f5e7aad14confirms operator (Meitetsu Bus), 13 February 2026 launch, Nagoya Station–Sakae route
src-3b45f4a1348fa2dddescribes the real-time vehicle position tracking system and stop-side digital signage
src-54ada2d7f7587aa2context: city-led project, 5.6 km/seven-stop route, launch date, BRT/LRT comparison