splits Istanbul's drinking-water network into district metering areas that can be watched and managed remotely
Permanent project revision
Revision 2026-08-27-source-dating · effective 2026-08-26
Current revision. This is the snapshot used by the live entity page.
Every source on this entry now carries a date key: a publication date where the publisher states one, otherwise an explicit null with the reason on the record.
sha256:35e326ac7e9a593fd28478863f7d658951f0b2bd76c713304e85e46bb1717573
replace /snapshot/projectFingerprint — Updated projectFingerprint to the current sourced project record.replace /snapshot/sources — Updated sources to the current sourced project record.The text below is copied verbatim from the published record. Each claim names the source dossiers that carry it; caveats stay attached to the claim they qualify.
clm-2b977a6e668d21f4
descriptive
splits Istanbul's drinking-water network into district metering areas that can be watched and managed remotely
clm-244d7c8591ed2606
quantitative
fell from 22.31% in 2019 to 18.63% at the end of 2024
clm-84c260a1d9980505
quantitative
hydraulic modelling of 18,500 kilometres of mains and the installation of 420 metering areas
clm-6630bdff5e7ad540
quantitative
22.31% in 2019, 20.68% in 2020, 20.52% in 2021, 19.45% in 2022, 18.94% in 2023 and 18.63% at the end of 2024
clm-bdbe482b5cbf8ae2
quantitative
The utility puts its spending on the programme at more than 1 billion lira
clm-1de8e022e976008f
quantitative
says the saving is worth about 50 days of Istanbul's water demand
clm-87ec6aeb13f87647
quantitative
the Istanbul branch of the Chamber of Environmental Engineers, which put the loss at 22.3% in its own 2020 study, says the level to aim for is 5%
This layer records what is known about each source, what is still missing, and the exact snapshot this page is rendering. A missing date, archive or hash stays visible as missing.
Awaiting operator and domain-expert review; publication of this revision implies neither.
sha256:35e326ac7e9a593fd28478863f7d658951f0b2bd76c713304e85e46bb1717573
src-65cd0c60eac0cb95The utility's own description of the SCADA layer over the network. No publication date is recorded: the page did not answer when this entry was checked.
src-9d5ab9122ccdaddbReports the utility's full annual loss series 2019-2024, the investment total, and the modelling and metering-area counts behind it.
src-2c8783b3d6de98b0The Chamber of Environmental Engineers' own measurement of Istanbul's losses and the level it says the city should be aiming for.
src-27ec8b884a537b4bBackground on the network. Continuously revised, so it states no publication date.