ISKI Centralized SCADA Water Balancing Strategy
This overview was generated with AI from the public sources listed below and checked against them before publication. It has not had a complete human fact-check — treat it as a starting point and follow the sources.
How this atlas is made · What “last verified” means · What “source-checked” means · The full record behind this page
✎ Corrected 27 Aug 2026 Publication date recorded for 4 sources. What changed →
ISKI's SCADA system splits Istanbul's drinking-water network into district metering areas that can be watched and managed remotely, so pressure and flow anomalies point to where a leak is. The utility's loss and leakage rate fell from 22.31% in 2019 to 18.63% at the end of 2024, after hydraulic modelling of 18,500 kilometres of mains and the installation of 420 metering areas.
what does this mean?
The strongest source is the operator's or the city's own reporting — an official report, dataset or press release. It grades who did the looking — not how well the project went. All four grades →📊 Impact
ISKI's published annual series for water loss and leakage: 22.31% in 2019, 20.68% in 2020, 20.52% in 2021, 19.45% in 2022, 18.94% in 2023 and 18.63% at the end of 2024. The utility puts its spending on the programme at more than 1 billion lira, and says the saving is worth about 50 days of Istanbul's water demand.
🎓 Lesson
Leak reduction is a grind, not a project: six annual figures, more than a billion lira, hydraulic modelling of 18,500 kilometres of mains and 420 metering areas wired into SCADA. And better is not good - the Istanbul branch of the Chamber of Environmental Engineers, which put the loss at 22.3% in its own 2020 study, says the level to aim for is 5%.
Sources
Show your work What this page rests on and what it can’t tell you · all 7 claims with their sources · the forensic record
Evidence Passport · public beta 7 addressable claims, 4 source dossiers, one permanent baseline. The passport is unreviewed — an AI-assisted structural migration, not a human or expert endorsement. Every revision keeps a permanent copy under revision history.
Inspect the claims, one by one — verbatim text, sources and caveats for all 7
The text below is copied verbatim from the published record. Each claim names the source dossiers that carry it; caveats stay attached to the claim they qualify.
clm-2b977a6e668d21f4
descriptive
splits Istanbul's drinking-water network into district metering areas that can be watched and managed remotely
Sources carrying this claim
clm-244d7c8591ed2606
quantitative
fell from 22.31% in 2019 to 18.63% at the end of 2024
Sources carrying this claim
clm-84c260a1d9980505
quantitative
hydraulic modelling of 18,500 kilometres of mains and the installation of 420 metering areas
Sources carrying this claim
clm-6630bdff5e7ad540
quantitative
22.31% in 2019, 20.68% in 2020, 20.52% in 2021, 19.45% in 2022, 18.94% in 2023 and 18.63% at the end of 2024
Sources carrying this claim
clm-bdbe482b5cbf8ae2
quantitative
The utility puts its spending on the programme at more than 1 billion lira
Sources carrying this claim
clm-1de8e022e976008f
quantitative
says the saving is worth about 50 days of Istanbul's water demand
Sources carrying this claim
clm-87ec6aeb13f87647
quantitative
the Istanbul branch of the Chamber of Environmental Engineers, which put the loss at 22.3% in its own 2020 study, says the level to aim for is 5%
Sources carrying this claim
Forensic record — source dossiers, gaps, hashes and the exact revision this page renders
This layer records what is known about each source, what is still missing, and the exact snapshot this page is rendering. A missing date, archive or hash stays visible as missing.
Awaiting operator and domain-expert review; publication of this revision implies neither.
sha256:35e326ac7e9a593fd28478863f7d658951f0b2bd76c713304e85e46bb1717573
- 7
- of 7 claims mapped
- 4
- source dossiers
- 2
- publication dates recorded
- 0
- archives linked
- 0
- exact locators
- 0
- content captures hashed
Governance facts carried by the record
- Operator
- İSKİ (Istanbul Water and Sewerage Administration)
- Actor types
- utility
- Funding model
- utility
- Funding description
- Not recorded
- Cost
- Not recorded
- Ownership
- Not recorded
- Decision rights
- Not recorded
- Exit conditions
- Not recorded
4 source dossiers
ISKI (operator) - SCADA technology
- Stable source ID
src-65cd0c60eac0cb95- Publisher
- Name not classified · iski.istanbul
- Type / language
- web-page · language not classified
- Published
- Not recorded
- Updated
- Not recorded
- Source last checked
- No source-level check date
- Record last verified
- 2026-08-26
- Dossier created
- 2026-08-27
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
- Descriptive only — not page/paragraph exact
Open the recorded source note
The utility's own description of the SCADA layer over the network. No publication date is recorded: the page did not answer when this entry was checked.
- Claims linked
Sozcu (press)
- Stable source ID
src-9d5ab9122ccdaddb- Publisher
- Name not classified · sozcu.com.tr
- Type / language
- web-page · language not classified
- Published
- 2025-02-22
- Updated
- Not recorded
- Source last checked
- No source-level check date
- Record last verified
- 2026-08-26
- Dossier created
- 2026-08-27
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
- Descriptive only — not page/paragraph exact
Open the recorded source note
Reports the utility's full annual loss series 2019-2024, the investment total, and the modelling and metering-area counts behind it.
Daily Sabah (press)
- Stable source ID
src-2c8783b3d6de98b0- Publisher
- Name not classified · dailysabah.com
- Type / language
- web-page · language not classified
- Published
- 2020-12-22
- Updated
- Not recorded
- Source last checked
- No source-level check date
- Record last verified
- 2026-08-26
- Dossier created
- 2026-08-27
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
- Descriptive only — not page/paragraph exact
Open the recorded source note
The Chamber of Environmental Engineers' own measurement of Istanbul's losses and the level it says the city should be aiming for.
- Claims linked
Wikipedia - Water supply and sanitation in Istanbul (reference)
- Stable source ID
src-27ec8b884a537b4b- Publisher
- Name not classified · en.wikipedia.org
- Type / language
- web-page · language not classified
- Published
- Not recorded
- Updated
- Not recorded
- Source last checked
- No source-level check date
- Record last verified
- 2026-08-26
- Dossier created
- 2026-08-27
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
- Descriptive only — not page/paragraph exact
Open the recorded source note
Background on the network. Continuously revised, so it states no publication date.
- Claims linked
- Background source; no baseline claim points here
Known limits of this passport
- Publisher names and source languages have not yet been classified; domains are recorded without guessing.
- Existing source notes are descriptive locators, not page- or paragraph-exact citations.
- A missing archive, publication date or content hash is shown as null rather than inferred.
- The project-level evidence grade ranks the strongest source in the entry; it is not a truth score for every claim.
Continue exploring
Compare this project
Same architecture, four answers: how much water is lost?
Four utilities run the recognised playbook — SCADA, district metering, pressure and night-flow monitoring. What separates them is not the technology but what they can show for it, and whether they publish a loss rate at all.
| Project | Since | Status | Outcome | Evidence | Run by | Cost | What the instrumentation produced |
|---|---|---|---|---|---|---|---|
| Casablanca Real-Time Water Network Monitoring (Aquadvanced)Casablanca, 🇲🇦 | — | Live | Ongoing | Official | Utility or public operator | not public | The whole network under permanent district metering with thousands of fixed acoustic sensors — every performance figure self-reported by the private operator. |
| ISKI Centralized SCADA Water Balancing StrategyIstanbul, 🇹🇷 | 2008 | Live | Ongoing | Official | Utility or public operator | not public | The same playbook with the steadiest published result: non-revenue water down from 22.31 per cent to 18.63 per cent over five years. |
| ASKİ SCADA Network and Ankara's Water LossesAnkara, 🇹🇷 | — | Live | Ongoing | Official | Utility or public operator | not public | Identical architecture, opposite outcome: the utility's own strategic plan opens at a 42 per cent loss rate. |
| SEAAL Water and Sewerage Remote-Control CentreAlgiers, 🇩🇿 | 2008 | Live | Ongoing | Media | Utility or public operator | not public | Hundreds of sites polled since 2008 and no network-efficiency or loss rate published at all — the one number that would settle it. |
Explore the wider context
📎 Cite this project
1001 Smart Cities (2026). “ISKI Centralized SCADA Water Balancing Strategy” — Istanbul, Turkey. The Smart City Atlas. https://1001smartcities.org/projects/istanbul-scada-water/ (last verified 2026-08-26). Data: CC BY 4.0.
The underlying data is free to reuse with attribution — see the open data page.
