Water Intelligent Network (WIN) Leak Monitoring
This overview was generated with AI from the public sources listed below and checked against them before publication. It has not had a complete human fact-check — treat it as a starting point and follow the sources.
How this atlas is made · What “last verified” means · What “source-checked” means · The full record behind this page
✎ Corrected 27 Aug 2026 Publication date recorded for 4 sources. What changed →
Since 2015 the Water Supplies Department has divided Hong Kong's freshwater network into about 2,400 District Metering Areas, each fitted with flow and pressure sensors feeding a central analytics system that pinpoints leaks and manages pressure. All 2,400 zones were completed by March 2025, covering about 80% of the fresh water distribution network; trunk mains and the remaining distribution mains are being added in phases. Overall mains leakage fell from over 25% (2000) to 13.4% (2024), and the department's stated target is to bring the leakage rate of government water mains, about 15% in 2017, below 10% by 2030.
what does this mean?
The strongest source is the operator's or the city's own reporting — an official report, dataset or press release. It grades who did the looking — not how well the project went. All four grades →📊 Impact
Mains leakage cut from over 25% (2000) to 13.4% (2024) and annual water-main bursts from around 2,500 (2000) to 27 (2024); all 2,400 DMAs completed by March 2025, covering about 80% of the fresh water distribution network.
🎓 Lesson
The headline decline is real and the attribution is not clean: the leakage rate started falling in 2000, when the department replaced and rehabilitated about 3,000 km of aged mains in a programme that ran until 2015 — the year the sensor network began. WIN inherited a network that had just been rebuilt, and no published analysis separates what the pipes did from what the metering did. Two other things are worth reading off the same answer: the network still covers only about 80% of fresh water distribution mains, and the 10%-by-2030 target is set against a different measure (government water mains, about 15% in 2017) than the 13.4% usually quoted.
Sources
Show your work What this page rests on and what it can’t tell you · all 10 claims with their sources · the forensic record
Evidence Passport · public beta 10 addressable claims, 4 source dossiers, one permanent baseline. The passport is unreviewed — an AI-assisted structural migration, not a human or expert endorsement. Every revision keeps a permanent copy under revision history.
Inspect the claims, one by one — verbatim text, sources and caveats for all 10
The text below is copied verbatim from the published record. Each claim names the source dossiers that carry it; caveats stay attached to the claim they qualify.
clm-cc3fb9ab72f31fc9
quantitative
Since 2015 the Water Supplies Department has divided Hong Kong's freshwater network into about 2,400 District Metering Areas
Sources carrying this claim
clm-63a9c501a03c90dd
descriptive
each fitted with flow and pressure sensors feeding a central analytics system that pinpoints leaks and manages pressure
Sources carrying this claim
clm-67219a87052d1212
quantitative
All 2,400 zones were completed by March 2025, covering about 80% of the fresh water distribution network; trunk mains and the remaining distribution mains are being added in phases
Sources carrying this claim
clm-829216dbba705faf
quantitative
Overall mains leakage fell from over 25% (2000) to 13.4% (2024)
Sources carrying this claim
clm-cf525ddfc390ca3b
quantitative
the department's stated target is to bring the leakage rate of government water mains, about 15% in 2017, below 10% by 2030
Sources carrying this claim
clm-7cd105de767b6e3a
quantitative
Mains leakage cut from over 25% (2000) to 13.4% (2024) and annual water-main bursts from around 2,500 (2000) to 27 (2024)
Sources carrying this claim
clm-ed53e183cbb9c909
quantitative
all 2,400 DMAs completed by March 2025, covering about 80% of the fresh water distribution network
Sources carrying this claim
clm-189acd4a9b9521f6
quantitative
the leakage rate started falling in 2000, when the department replaced and rehabilitated about 3,000 km of aged mains in a programme that ran until 2015 — the year the sensor network began
Sources carrying this claim
clm-e52239a40911a7a3
quantitative
the network still covers only about 80% of fresh water distribution mains
Sources carrying this claim
clm-fe6b79293f4f4fcb
quantitative
the 10%-by-2030 target is set against a different measure (government water mains, about 15% in 2017) than the 13.4% usually quoted
Sources carrying this claim
Forensic record — source dossiers, gaps, hashes and the exact revision this page renders
This layer records what is known about each source, what is still missing, and the exact snapshot this page is rendering. A missing date, archive or hash stays visible as missing.
Awaiting operator and domain-expert review; publication of this revision implies neither.
sha256:d7b64735d54f34222ea59360d3386843bc3b52616e87a789501929ae319468c0
- 10
- of 10 claims mapped
- 4
- source dossiers
- 1
- publication dates recorded
- 0
- archives linked
- 0
- exact locators
- 0
- content captures hashed
Governance facts carried by the record
- Operator
- Water Supplies Department, HKSAR
- Actor types
- utility
- Funding model
- utility
- Funding description
- Not recorded
- Cost
- Not recorded
- Ownership
- Not recorded
- Decision rights
- Not recorded
- Exit conditions
- Not recorded
4 source dossiers
Water Supplies Department, WIN page (authority)
- Stable source ID
src-45efefba17fd9fb5- Publisher
- Name not classified · wsd.gov.hk
- Type / language
- web-page · language not classified
- Published
- Not recorded
- Updated
- 2025-06-17
- Source last checked
- No source-level check date
- Record last verified
- 2026-07-17
- Dossier created
- 2026-08-27
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
- Descriptive only — not page/paragraph exact
Open the recorded source note
A standing project page that carries no publication date. The page carries no publication date, only a last revision date of 17 June 2025.
- Claims linked
info.gov.hk LCQ12, 14 May 2025 (authority)
- Stable source ID
src-0c67dc3c487d38bb- Publisher
- Name not classified · info.gov.hk
- Type / language
- web-page · language not classified
- Published
- 2025-05-14
- Updated
- Not recorded
- Source last checked
- No source-level check date
- Record last verified
- 2026-07-17
- Dossier created
- 2026-08-27
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
- Descriptive only — not page/paragraph exact
Open the recorded source note
Leakage-rate figures and DMA completion; mains-burst prevention measures.
Development Bureau, 'My Blog: Water Intelligent Network' (authority)
- Stable source ID
src-b2cb6550769f7f45- Publisher
- Name not classified · devb.gov.hk
- Type / language
- web-page · language not classified
- Published
- Not recorded
- Updated
- Not recorded
- Source last checked
- No source-level check date
- Record last verified
- 2026-07-17
- Dossier created
- 2026-08-27
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
- Descriptive only — not page/paragraph exact
Open the recorded source note
An undated departmental blog entry; it describes the state of the rollout at more than 1,300 DMAs. The page states no publication date.
- Claims linked
Water Supplies Department, Total Water Management review — containing fresh water demand growth (authority)
- Stable source ID
src-e3675219f7c3dc0c- Publisher
- Name not classified · wsd.gov.hk
- Type / language
- web-page · language not classified
- Published
- Not recorded
- Updated
- Not recorded
- Source last checked
- No source-level check date
- Record last verified
- 2026-07-17
- Dossier created
- 2026-08-27
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
- Descriptive only — not page/paragraph exact
Open the recorded source note
A standing strategy page that carries no publication date; source for the leakage-rate target. The page states no publication date.
- Claims linked
Known limits of this passport
- Publisher names and source languages have not yet been classified; domains are recorded without guessing.
- Existing source notes are descriptive locators, not page- or paragraph-exact citations.
- A missing archive, publication date or content hash is shown as null rather than inferred.
- The project-level evidence grade ranks the strongest source in the entry; it is not a truth score for every claim.
Continue exploring
Compare this project
Explore the wider context
📎 Cite this project
1001 Smart Cities (2026). “Water Intelligent Network (WIN) Leak Monitoring” — Hong Kong, Hong Kong. The Smart City Atlas. https://1001smartcities.org/projects/hongkong-water-intelligent-network/ (last verified 2026-07-17). Data: CC BY 4.0.
The underlying data is free to reuse with attribution — see the open data page.
