Permanent project revision

Sydney Metro Driverless Rapid Transit

Revision 2026-08-20-source-dates-b2 · effective 2026-08-12

Current revision. This is the snapshot used by the live entity page.

unreviewed

Record the publication date of each source that states one; sources that publish no date are marked null.

sha256:417c4f82c02a1af8b0e09773e4a4fec6ea510c38b0c3afbc31910297430c1e97

Change set

  • replace /snapshot/projectFingerprint — Updated projectFingerprint to the current sourced project record.
  • replace /snapshot/sources — Updated sources to the current sourced project record.
3
of 3 claims mapped
6
source dossiers
2
publication dates recorded
0
archives linked
0
exact locators
0
content captures hashed

Claims, one by one

The text below is copied verbatim from the published record. Each claim names the source dossiers that carry it; caveats stay attached to the claim they qualify.

Claim 1 clm-95f9d9600f528b52 quantitative
Sydney Metro's Northwest line opened 26 May 2019 as Australia's first fully automated, driverless metro service, with platform screen doors at every station and trains supervised from a control centre.
Published field
snippet · verbatim
Mapping
mapped · no interpretation or interpolation added by this passport
What the mapping says
Urban Transport Magazine dates the Northwest opening to 26 May 2019, identifies it as Australia's first fully automated metro and records platform screen doors at all stops; Sydney Metro's operations explainer documents driverless control from the Rouse Hill control centre, while its screen-door update covers the City & Southwest stations.
Caveat
The sentence combines system features documented across the original Northwest line and the later City & Southwest extension; it does not imply one source states every component.

Sources carrying this claim

  1. Urban Transport Magazine — Australia's first metro system opened in Sydney
  2. Sydney Metro — behind the scenes: operations
  3. Sydney Metro — all platform screen doors on city stations now complete
Claim 2 clm-3f1bf651643681a7 quantitative
The City & Southwest extension into the CBD opened 19 August 2024.
Published field
snippet · verbatim
Mapping
mapped · no interpretation or interpolation added by this passport
What the mapping says
The Transport for NSW opening notice dates passenger service through the city to 19 August 2024.
Caveat
The government page blocked automated retrieval during this pass; the mapping retains the exact source previously checked in the Sydney review.

Sources carrying this claim

  1. Transport for NSW — Sydney Metro is now open
Claim 3 clm-43098971e2fb4f88 descriptive
Northwest line runs driverless services as frequently as every four minutes at peak, monitored around the clock from a central control centre rather than by on-board drivers.
Published field
impact · verbatim
Mapping
mapped · no interpretation or interpolation added by this passport
What the mapping says
Urban Transport Magazine reports four-minute peak services; Sydney Metro documents round-the-clock staffing of the control centre, automated supervision of train movements and that an on-board driver is not required.
Caveat
No claim-specific caveat recorded

Sources carrying this claim

  1. Urban Transport Magazine — Australia's first metro system opened in Sydney
  2. Sydney Metro — behind the scenes: operations

Source dossiers and revision state

This layer records what is known about each source, what is still missing, and the exact snapshot this page is rendering. A missing date, archive or hash stays visible as missing.

unreviewed Revision 2026-08-20-source-dates-b2 effective 2026-08-12 · created 2026-08-20

Awaiting operator and domain-expert review; publication of this revision implies neither.

sha256:417c4f82c02a1af8b0e09773e4a4fec6ea510c38b0c3afbc31910297430c1e97
3
of 3 claims mapped
6
source dossiers
2
publication dates recorded
0
archives linked
0
exact locators
0
content captures hashed

Governance facts carried by the record

Operator
Sydney Metro (Transport for NSW), trains operated under contract by Metro Trains Sydney
Actor types
regional-government, private
Funding model
public
Funding description
NSW state government capital works program
Cost
A$8.3bn (Northwest line); City & Southwest cost grew to roughly A$20.5bn after 2023 budget revisions
Ownership
Not recorded
Decision rights
Not recorded
Exit conditions
Not recorded

6 source dossiers

Sydney Metro — driverless trains start passenger services sydneymetro.info · background

Open original source ↗

Stable source ID
src-1700dee9c7a3c594
Publisher
Name not classified · sydneymetro.info
Type / language
web-page · language not classified
Published
Not recorded
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-08-12
Dossier created
2026-08-20
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

Operator announcement about additional driverless trains entering Northwest passenger service in 2022; background, not the 2019 launch source.

Descriptive only — not page/paragraph exact
Claims linked
Background source; no baseline claim points here
Sydney Metro — behind the scenes: operations sydneymetro.info · 2 linked claims

Open original source ↗

Stable source ID
src-8b6200bfc02f9771
Publisher
Name not classified · sydneymetro.info
Type / language
web-page · language not classified
Published
Not recorded
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-08-12
Dossier created
2026-08-20
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

Operator explainer on driverless operation, control centre, safety systems.

Descriptive only — not page/paragraph exact
Transport for NSW — Sydney Metro is now open transport.nsw.gov.au · 1 linked claim

Open original source ↗

Stable source ID
src-2391d55e9757feed
Publisher
Name not classified · transport.nsw.gov.au
Type / language
web-page · language not classified
Published
2019-05-26
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-08-12
Dossier created
2026-08-20
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

Government source, City & Southwest opening, 19 August 2024.

Descriptive only — not page/paragraph exact
Sydney Metro — all platform screen doors on city stations now complete sydneymetro.info · 1 linked claim

Open original source ↗

Stable source ID
src-74bc22d6a05ddd44
Publisher
Name not classified · sydneymetro.info
Type / language
web-page · language not classified
Published
Not recorded
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-08-12
Dossier created
2026-08-20
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

Operator confirmation of platform screen doors on City & Southwest stations.

Descriptive only — not page/paragraph exact
Urban Transport Magazine — Australia's first metro system opened in Sydney urban-transport-magazine.com · 2 linked claims

Open original source ↗

Stable source ID
src-40a1792741964690
Publisher
Name not classified · urban-transport-magazine.com
Type / language
web-page · language not classified
Published
2019-05-29
Updated
2019-06-09
Source last checked
No source-level check date
Record last verified
2026-08-12
Dossier created
2026-08-20
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

Independent trade press corroboration of the ‘first automated metro in Australia’ claim.

Descriptive only — not page/paragraph exact
International Railway Journal — Sydney Metro City & Southwest project exceeds budget railjournal.com · background

Open original source ↗

Stable source ID
src-01fc19bcea01fa0c
Publisher
Name not classified · railjournal.com
Type / language
web-page · language not classified
Published
Not recorded
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-08-12
Dossier created
2026-08-20
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

Independent trade press, cost overrun figures for City & Southwest.

Descriptive only — not page/paragraph exact
Claims linked
Background source; no baseline claim points here
Known limits of this passport
  • Publisher names and source languages have not yet been classified; domains are recorded without guessing.
  • Existing source notes are descriptive locators, not page- or paragraph-exact citations.
  • A missing archive, publication date or content hash is shown as null rather than inferred.
  • The project-level evidence grade ranks the strongest source in the entry; it is not a truth score for every claim.