clm-eeee2acf3a22c055
quantitative
of the 4,600 social housing units expected, 1,520 had been built by 2010 and only 1,600 by December 2014
Permanent project revision
Revision 2026-08-20-source-dates · effective 2026-07-25
Superseded. A later revision exists: 2026-08-27-p1-quality-uplift →
Created the first structured Evidence Passport with 1 claim and 4 source dossiers.
sha256:d80b531f24c8f8d6423cccc2cce353e1de7562c3b1799cf5b67d059e5504a92a
add /evidencePassport — Added claim-level evidence mapping and source dossiers.add /revisionHistory — Established a permanent, hash-addressed baseline revision.The text below is copied verbatim from the published record. Each claim names the source dossiers that carry it; caveats stay attached to the claim they qualify.
clm-eeee2acf3a22c055
quantitative
of the 4,600 social housing units expected, 1,520 had been built by 2010 and only 1,600 by December 2014
This layer records what is known about each source, what is still missing, and the exact snapshot this page is rendering. A missing date, archive or hash stays visible as missing.
Awaiting operator and domain-expert review; publication of this revision implies neither.
sha256:d80b531f24c8f8d6423cccc2cce353e1de7562c3b1799cf5b67d059e5504a92a
src-0028767c0c7fc154Peer-reviewed: fibre optics, pneumatic waste, climate-control infrastructure; 22@'s role as the Urban Lab smart-city testbed
src-4588b161c39d01fb37 km streets urbanised with fibre-optic + waste networks; over €180m public funding; ~200 ha rezoned from 2000
src-93886b2d7359cceaDistriclima district heating/cooling serving 22@/Poblenou, still expanding
src-3b462b8fbc901fb8Pneumatic/selective waste operational since 2006; district as a living lab