Permanent project revision

Kismayo Solar Mini-Grid for Refugee Returnees

Revision 2026-08-21-evidence-baseline · effective 2026-08-07

Superseded. A later revision exists: 2026-08-21-unsourced-text-correction →

unreviewed

Created the first structured Evidence Passport with 9 claims and 5 source dossiers.

sha256:a9d9bdc5cd895eed11b8801479f764400d17d809705d691c20e7f657a412fc62

Change set

  • add /evidencePassport — Added claim-level evidence mapping and source dossiers.
  • add /revisionHistory — Established a permanent, hash-addressed baseline revision.
9
of 9 claims mapped
5
source dossiers
0
publication dates recorded
0
archives linked
0
exact locators
0
content captures hashed

Claims, one by one

The text below is copied verbatim from the published record. Each claim names the source dossiers that carry it; caveats stay attached to the claim they qualify.

Claim 1 clm-bcd0efa3f50eff02 descriptive
SolarGen built Kismayo's first solar mini-grid
Published field
snippet · verbatim
Mapping
mapped · no interpretation or interpolation added by this passport
What the mapping says
SolarGen's own project page is headed "Kismayo Solar Mini-Grid" and names itself the builder, with "Client: ARC" and "Location: Kismayo"; it describes "a community solar mini grid that was designed to provide power to resettled communities back from Dadaab Refugee camp". Microgrid Knowledge reported in April 2018 that "A second solar microgrid will be built by SolarGen in a new development for returning refugees in Kismayo."
Caveat
No source calls this Kismayo's first solar mini-grid. Microgrid Knowledge ranks it as SolarGen's second microgrid in Somalia (after Warsheikh), which is a different claim; the priority within Kismayo is the entry's own assertion and is unattested.

Sources carrying this claim

  1. SolarGen Technologies — Kismayo Solar Mini-Grid (operator)
  2. Microgrid Knowledge (trade)
Claim 2 clm-97b65f7b157ce9d8 quantitative
in 2018
Published field
snippet · verbatim
Mapping
mapped · no interpretation or interpolation added by this passport
What the mapping says
The operator's project page dates the project in its metadata block, "Year: 2018" — the string "2018" occurs exactly once on that page. Microgrid Knowledge's report of 13 April 2018 places the Kismayo build in that year, but still in the future tense ("will be built").
Caveat
The year stands only in a two-cell metadata field ("Year:" / "2018"), not in a dated sentence, and it is not stated whether 2018 is the year of construction or of commissioning. The trade report from April 2018 had the project still unbuilt.

Sources carrying this claim

  1. SolarGen Technologies — Kismayo Solar Mini-Grid (operator)
  2. Microgrid Knowledge (trade)
Claim 3 clm-de59823ed07a51f3 descriptive
for a resettlement area housing refugees returning from Kenya's Dadaab camp
Published field
snippet · verbatim
Mapping
mapped · no interpretation or interpolation added by this passport
What the mapping says
SolarGen: the grid "was designed to provide power to resettled communities back from Dadaab Refugee camp, Kenya, one of the largest refugee camps in the world to Kismayo, Somalia", and calls the site "a model settlement". Microgrid Knowledge and Hiiraan Online carry SolarGen's Sean Brooks verbatim: the system serves "the area designated for refugees returning back to Somalia from Kenya", in "a new development for returning refugees" whose houses the American Refugee Committee was building.
Caveat
Hiiraan Online is the same Lisa Cohn report republished, not an independent second witness. Only SolarGen names Dadaab specifically; the two press copies say only "from Kenya".

Sources carrying this claim

  1. SolarGen Technologies — Kismayo Solar Mini-Grid (operator)
  2. Microgrid Knowledge (trade)
  3. Hiiraan Online (press)
Claim 4 clm-58da375c92b94c77 quantitative
powering some 110 households
Published field
snippet · verbatim
Mapping
mapped · no interpretation or interpolation added by this passport
What the mapping says
SolarGen's project page states "Servicing: 110 Families" and, in prose, "The system provides power to 110 families". Microgrid Knowledge and Hiiraan Online quote SolarGen's own design target from before construction: "we designed a system to support 100 households and five public facilities".
Caveat
The two figures differ: 110 is the operator's own count on its completed-project page, 100 the design target quoted in April 2018 before the grid was built. Neither figure has been checked by anyone outside SolarGen, and the entry's hedge "some" carries that gap.

Sources carrying this claim

  1. SolarGen Technologies — Kismayo Solar Mini-Grid (operator)
  2. Microgrid Knowledge (trade)
  3. Hiiraan Online (press)
Claim 5 clm-05aaa29fc93fc3f8 descriptive
alongside a school, clinic, police post and market
Published field
snippet · verbatim
Mapping
mapped · no interpretation or interpolation added by this passport
What the mapping says
SolarGen names all four: the system provides power "to 110 families, a clinic, a school, a police station and a marketplace". Microgrid Knowledge gives only the count from the design stage — "100 households and five public facilities".
Caveat
SolarGen names four facilities where the design quoted by Microgrid Knowledge counted five; the fifth is not identified in any source. "Police post" and "market" are the entry's shortenings of the operator's "police station" and "marketplace".

Sources carrying this claim

  1. SolarGen Technologies — Kismayo Solar Mini-Grid (operator)
  2. Microgrid Knowledge (trade)
Claim 6 clm-7b39b44a141d60b4 descriptive
Somalia's World Bank-financed utility-recovery programme
Published field
snippet · verbatim
Mapping
mapped · no interpretation or interpolation added by this passport
What the mapping says
The tender states that "The Federal Government of Somalia has received financing from the World Bank toward the cost of the Somali Electricity Sector Recovery Project". The Implementation Status & Results Report of 4 Nov 2025 identifies the same operation (P173088, IBRD/IDA, Investment Project Financing, credit IDA-D9310 of US$150m) and gives its objective as "to increase access to lower cost and cleaner electricity supply in project areas and to reestablish the electricity supply industry".
Caveat
"Utility-recovery programme" is the entry's paraphrase; the programme's own name is the Somali Electricity Sector Recovery Project, and re-establishing the electricity supply industry is one of two stated objectives alongside cheaper and cleaner supply.

Sources carrying this claim

  1. World Bank — SESRP Implementation Status & Results Report (P173088, Nov 2025)
  2. SESRP Request for Bids — 6MWp Solar PV + 10 MWh BESS for WESCO, Kismayo
Claim 7 clm-e0cf2921405afa56 quantitative
has since tendered a far larger 6 MWp solar-plus-storage plant
Published field
snippet · verbatim
Mapping
mapped · no interpretation or interpolation added by this passport
What the mapping says
The Request for Bids invites sealed bids for the "Design, Supply, Installation, Testing, and Commissioning of 6MWp Solar PV Power Plant with 10 MWh of Battery Energy Storage System for Wamo Energy Service Company (WESCO), Kismayo City, Somalia", run as international competitive procurement under the World Bank's Procurement Regulations. The ISR confirms an EPC procurement is under way for WESCO-Kismayo alongside Berbera and Borama.
Caveat
"Far larger" is a comparison the entry draws, not a sourced statement: no source gives the installed capacity of the 2018 mini-grid, so the two cannot be compared directly. For scale, Microgrid Knowledge describes SolarGen's comparable Warsheikh grid as a 48-kW system for 175 households. The ISR does not name the 6 MWp figure for Kismayo; it gives 26 MWp as the combined capacity of all three pending contracts.

Sources carrying this claim

  1. SESRP Request for Bids — 6MWp Solar PV + 10 MWh BESS for WESCO, Kismayo
  2. World Bank — SESRP Implementation Status & Results Report (P173088, Nov 2025)
Claim 8 clm-21a9506657809fe9 descriptive
for Kismayo's main grid
Published field
snippet · verbatim
Mapping
mapped · no interpretation or interpolation added by this passport
What the mapping says
Both sources name the beneficiary as the city's electricity service provider rather than the returnee settlement: the tender is "for Wamo Energy Service Company (WESCO), Kismayo City, Somalia", and the ISR lists "WESCO-Kismayo" among the electricity service providers (ESPs) receiving solar PV and battery storage under Component 2.
Caveat
Neither source uses the phrase "main grid". Both identify WESCO as the recipient utility; the ISR notes elsewhere that Somalia has no national grid, so "main grid" here means the city utility's own network, which is the entry's reading rather than a quoted term.

Sources carrying this claim

  1. SESRP Request for Bids — 6MWp Solar PV + 10 MWh BESS for WESCO, Kismayo
  2. World Bank — SESRP Implementation Status & Results Report (P173088, Nov 2025)
Claim 9 clm-af5d62896b9368fd descriptive
it remained unawarded in the programme's most recent public report
Published field
snippet · verbatim
Mapping
mapped · no interpretation or interpolation added by this passport
What the mapping says
The ISR of 4 November 2025 (Seq No: 8, ISR058161) still carries the Kismayo contract as unawarded: "The installation of Solar PV and Battery Energy Storage Systems in Galkayo, Growe, Baidoa has commenced whereas the contractor selection for Berbera, Borama and Kismayo is advianced [sic]." The results tables repeat that "The procurement of EPC contractors for an additional 3 ESPs (BEC-Berbera, AEC-Borama, WESCO-Kismayo) with an estimated total capacity of 26MWp expected to be awarded by November 30, 2025", and record the corresponding installed-capacity indicators as 0.00 as of 15 Oct 2025.
Caveat
The report gives an expected award date of 30 November 2025, weeks after publication, so the contract may have been awarded since. "Most recent public report" describes the ISR series as it stood when the entry was verified, not necessarily today.

Sources carrying this claim

  1. World Bank — SESRP Implementation Status & Results Report (P173088, Nov 2025)

Source dossiers and revision state

This layer records what is known about each source, what is still missing, and the exact snapshot this page is rendering. A missing date, archive or hash stays visible as missing.

unreviewed Revision 2026-08-21-evidence-baseline effective 2026-08-07 · created 2026-08-21

Awaiting operator and domain-expert review; publication of this revision implies neither.

sha256:a9d9bdc5cd895eed11b8801479f764400d17d809705d691c20e7f657a412fc62
9
of 9 claims mapped
5
source dossiers
0
publication dates recorded
0
archives linked
0
exact locators
0
content captures hashed

Governance facts carried by the record

Operator
SolarGen Technologies, for the American Refugee Committee, funded by UNHCR and the Somalia Stability Fund
Actor types
private, civil-society
Funding model
grant
Funding description
Not recorded
Cost
Not recorded
Ownership
Not recorded
Decision rights
Not recorded
Exit conditions
Not recorded

5 source dossiers

SolarGen Technologies — Kismayo Solar Mini-Grid (operator) solargentechnologies.com · 5 linked claims

Open original source ↗

Stable source ID
src-53c6a3b68d33e7de
Publisher
Name not classified · solargentechnologies.com
Type / language
web-page · language not classified
Published
Not recorded
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-08-07
Dossier created
2026-08-21
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

Trägt: 2018, 110 Familien, Schule/Klinik/Polizeiposten/Markt, Dadaab-Rückkehrer; beschreibt ein Solar-Mini-Grid (kein Diesel)

Descriptive only — not page/paragraph exact
Microgrid Knowledge (trade) microgridknowledge.com · 5 linked claims

Open original source ↗

Stable source ID
src-557eae823760057c
Publisher
Name not classified · microgridknowledge.com
Type / language
web-page · language not classified
Published
Not recorded
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-08-07
Dossier created
2026-08-21
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

Trägt: Auslegung für 100 Haushalte + 5 öffentliche Einrichtungen, Finanzierung UNHCR + Somalia Stability Fund, Umsetzung mit American Refugee Committee

Descriptive only — not page/paragraph exact
Hiiraan Online (press) hiiraan.com · 2 linked claims

Open original source ↗

Stable source ID
src-47249953e58a1d5a
Publisher
Name not classified · hiiraan.com
Type / language
web-page · language not classified
Published
Not recorded
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-08-07
Dossier created
2026-08-21
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

Zeitgenössische Presse-Fassung desselben Berichts; blockt automatisierte Abrufe (403), Existenz per Suche bestätigt

Descriptive only — not page/paragraph exact
World Bank — SESRP Implementation Status & Results Report (P173088, Nov 2025) documents1.worldbank.org · 4 linked claims

Open original source ↗

Stable source ID
src-682dd1b2e1adc7a2
Publisher
Name not classified · documents1.worldbank.org
Type / language
pdf · language not classified
Published
Not recorded
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-08-07
Dossier created
2026-08-21
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

Trägt den 'still unawarded'-Satz: WESCO-Kismayo unter 3 EPC-Verträgen noch im Vergabeverfahren, Zuschlag erwartet 30.11.2025

Descriptive only — not page/paragraph exact
SESRP Request for Bids — 6MWp Solar PV + 10 MWh BESS for WESCO, Kismayo somalijobs.com · 3 linked claims

Open original source ↗

Stable source ID
src-e1a61e94c91d7e82
Publisher
Name not classified · somalijobs.com
Type / language
web-page · language not classified
Published
Not recorded
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-08-07
Dossier created
2026-08-21
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

Trägt die Spezifikation der Ausschreibung: 6 MWp PV + 10 MWh Batteriespeicher für WESCO

Descriptive only — not page/paragraph exact
Known limits of this passport
  • Publisher names and source languages have not yet been classified; domains are recorded without guessing.
  • Existing source notes are descriptive locators, not page- or paragraph-exact citations.
  • A missing archive, publication date or content hash is shown as null rather than inferred.
  • The project-level evidence grade ranks the strongest source in the entry; it is not a truth score for every claim.