 "schemaVersion": "1.0.0",
 "constitutionVersion": "1.0.0",
 "createdAt": "2026-08-12T00:00:00Z",
 "description": "Append-only Evidence Passport records. Old revisions are immutable; corrections create a new revision and preserve the previous permalink.",
 "entity": {
  "type": "project",
  "id": "kismayo-solar-microgrid",
  "title": "Kismayo Solar Mini-Grid for Refugee Returnees",
  "canonicalUrl": "https://1001smartcities.org/projects/kismayo-solar-microgrid/"
 },
 "currentRevisionId": "2026-08-21-unsourced-text-correction",
 "revisions": [
  {
   "id": "2026-08-21-evidence-baseline",
   "createdAt": "2026-08-21T23:30:00Z",
   "effectiveAt": "2026-08-07",
   "changeType": "baseline",
   "summary": "Created the first structured Evidence Passport with 9 claims and 5 source dossiers.",
   "preparedBy": {
    "type": "automation",
    "label": "AI-assisted evidence preparation",
    "humanApproved": false
   },
   "review": {
    "status": "unreviewed",
    "by": null,
    "date": null,
    "note": "Awaiting operator and domain-expert review; publication of this revision implies neither."
   },
   "changes": [
    {
     "operation": "add",
     "path": "/evidencePassport",
     "summary": "Added claim-level evidence mapping and source dossiers."
    },
    {
     "operation": "add",
     "path": "/revisionHistory",
     "summary": "Established a permanent, hash-addressed baseline revision."
    }
   ],
   "snapshotHash": "sha256:a9d9bdc5cd895eed11b8801479f764400d17d809705d691c20e7f657a412fc62",
   "snapshot": {
    "asOf": "2026-08-07",
    "projectFingerprint": "sha256:6294afe90d4e15f21bd2d5b9e4c0a77329baacda057f05b6595899585b7cd3c4",
    "assurance": {
     "status": "unreviewed",
     "scope": "evidence-passport-revision",
     "statement": "AI-assisted structural preparation. This revision has not been reviewed by a human or subject-matter expert.",
     "machineChecks": [
      "schema",
      "publication-diff-contract",
      "material-project-fingerprint",
      "claim-text-drift",
      "source-reference-resolution",
      "complete-source-dossier",
      "snapshot-hash"
     ]
    },
    "projectState": {
     "status": "live",
     "outcome": "ongoing",
     "evidenceGrade": "official",
     "timeline": {
      "started": 2018,
      "ended": null
     }
    },
    "governance": {
     "operator": "SolarGen Technologies, for the American Refugee Committee, funded by UNHCR and the Somalia Stability Fund",
     "actorTypes": [
      "private",
      "civil-society"
     ],
     "fundingModel": "grant",
     "fundingDescription": null,
     "cost": null,
     "ownership": null,
     "decisionRights": null,
     "exitConditions": null
    },
    "claims": [
     {
      "id": "clm-bcd0efa3f50eff02",
      "field": "snippet",
      "text": "SolarGen built Kismayo's first solar mini-grid",
      "statementKind": "descriptive",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-53c6a3b68d33e7de",
       "src-557eae823760057c"
      ],
      "supportNote": "SolarGen's own project page is headed \"Kismayo Solar Mini-Grid\" and names itself the builder, with \"Client: ARC\" and \"Location: Kismayo\"; it describes \"a community solar mini grid that was designed to provide power to resettled communities back from Dadaab Refugee camp\". Microgrid Knowledge reported in April 2018 that \"A second solar microgrid will be built by SolarGen in a new development for returning refugees in Kismayo.\"",
      "caveat": "No source calls this Kismayo's first solar mini-grid. Microgrid Knowledge ranks it as SolarGen's second microgrid in Somalia (after Warsheikh), which is a different claim; the priority within Kismayo is the entry's own assertion and is unattested.",
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-97b65f7b157ce9d8",
      "field": "snippet",
      "text": "in 2018",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-53c6a3b68d33e7de",
       "src-557eae823760057c"
      ],
      "supportNote": "The operator's project page dates the project in its metadata block, \"Year: 2018\" — the string \"2018\" occurs exactly once on that page. Microgrid Knowledge's report of 13 April 2018 places the Kismayo build in that year, but still in the future tense (\"will be built\").",
      "caveat": "The year stands only in a two-cell metadata field (\"Year:\" / \"2018\"), not in a dated sentence, and it is not stated whether 2018 is the year of construction or of commissioning. The trade report from April 2018 had the project still unbuilt.",
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-de59823ed07a51f3",
      "field": "snippet",
      "text": "for a resettlement area housing refugees returning from Kenya's Dadaab camp",
      "statementKind": "descriptive",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-53c6a3b68d33e7de",
       "src-557eae823760057c",
       "src-47249953e58a1d5a"
      ],
      "supportNote": "SolarGen: the grid \"was designed to provide power to resettled communities back from Dadaab Refugee camp, Kenya, one of the largest refugee camps in the world to Kismayo, Somalia\", and calls the site \"a model settlement\". Microgrid Knowledge and Hiiraan Online carry SolarGen's Sean Brooks verbatim: the system serves \"the area designated for refugees returning back to Somalia from Kenya\", in \"a new development for returning refugees\" whose houses the American Refugee Committee was building.",
      "caveat": "Hiiraan Online is the same Lisa Cohn report republished, not an independent second witness. Only SolarGen names Dadaab specifically; the two press copies say only \"from Kenya\".",
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-58da375c92b94c77",
      "field": "snippet",
      "text": "powering some 110 households",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-53c6a3b68d33e7de",
       "src-557eae823760057c",
       "src-47249953e58a1d5a"
      ],
      "supportNote": "SolarGen's project page states \"Servicing: 110 Families\" and, in prose, \"The system provides power to 110 families\". Microgrid Knowledge and Hiiraan Online quote SolarGen's own design target from before construction: \"we designed a system to support 100 households and five public facilities\".",
      "caveat": "The two figures differ: 110 is the operator's own count on its completed-project page, 100 the design target quoted in April 2018 before the grid was built. Neither figure has been checked by anyone outside SolarGen, and the entry's hedge \"some\" carries that gap.",
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-05aaa29fc93fc3f8",
      "field": "snippet",
      "text": "alongside a school, clinic, police post and market",
      "statementKind": "descriptive",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-53c6a3b68d33e7de",
       "src-557eae823760057c"
      ],
      "supportNote": "SolarGen names all four: the system provides power \"to 110 families, a clinic, a school, a police station and a marketplace\". Microgrid Knowledge gives only the count from the design stage — \"100 households and five public facilities\".",
      "caveat": "SolarGen names four facilities where the design quoted by Microgrid Knowledge counted five; the fifth is not identified in any source. \"Police post\" and \"market\" are the entry's shortenings of the operator's \"police station\" and \"marketplace\".",
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-7b39b44a141d60b4",
      "field": "snippet",
      "text": "Somalia's World Bank-financed utility-recovery programme",
      "statementKind": "descriptive",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-682dd1b2e1adc7a2",
       "src-e1a61e94c91d7e82"
      ],
      "supportNote": "The tender states that \"The Federal Government of Somalia has received financing from the World Bank toward the cost of the Somali Electricity Sector Recovery Project\". The Implementation Status & Results Report of 4 Nov 2025 identifies the same operation (P173088, IBRD/IDA, Investment Project Financing, credit IDA-D9310 of US$150m) and gives its objective as \"to increase access to lower cost and cleaner electricity supply in project areas and to reestablish the electricity supply industry\".",
      "caveat": "\"Utility-recovery programme\" is the entry's paraphrase; the programme's own name is the Somali Electricity Sector Recovery Project, and re-establishing the electricity supply industry is one of two stated objectives alongside cheaper and cleaner supply.",
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-e0cf2921405afa56",
      "field": "snippet",
      "text": "has since tendered a far larger 6 MWp solar-plus-storage plant",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-e1a61e94c91d7e82",
       "src-682dd1b2e1adc7a2"
      ],
      "supportNote": "The Request for Bids invites sealed bids for the \"Design, Supply, Installation, Testing, and Commissioning of 6MWp Solar PV Power Plant with 10 MWh of Battery Energy Storage System for Wamo Energy Service Company (WESCO), Kismayo City, Somalia\", run as international competitive procurement under the World Bank's Procurement Regulations. The ISR confirms an EPC procurement is under way for WESCO-Kismayo alongside Berbera and Borama.",
      "caveat": "\"Far larger\" is a comparison the entry draws, not a sourced statement: no source gives the installed capacity of the 2018 mini-grid, so the two cannot be compared directly. For scale, Microgrid Knowledge describes SolarGen's comparable Warsheikh grid as a 48-kW system for 175 households. The ISR does not name the 6 MWp figure for Kismayo; it gives 26 MWp as the combined capacity of all three pending contracts.",
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-21a9506657809fe9",
      "field": "snippet",
      "text": "for Kismayo's main grid",
      "statementKind": "descriptive",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-e1a61e94c91d7e82",
       "src-682dd1b2e1adc7a2"
      ],
      "supportNote": "Both sources name the beneficiary as the city's electricity service provider rather than the returnee settlement: the tender is \"for Wamo Energy Service Company (WESCO), Kismayo City, Somalia\", and the ISR lists \"WESCO-Kismayo\" among the electricity service providers (ESPs) receiving solar PV and battery storage under Component 2.",
      "caveat": "Neither source uses the phrase \"main grid\". Both identify WESCO as the recipient utility; the ISR notes elsewhere that Somalia has no national grid, so \"main grid\" here means the city utility's own network, which is the entry's reading rather than a quoted term.",
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-af5d62896b9368fd",
      "field": "snippet",
      "text": "it remained unawarded in the programme's most recent public report",
      "statementKind": "descriptive",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-682dd1b2e1adc7a2"
      ],
      "supportNote": "The ISR of 4 November 2025 (Seq No: 8, ISR058161) still carries the Kismayo contract as unawarded: \"The installation of Solar PV and Battery Energy Storage Systems in Galkayo, Growe, Baidoa has commenced whereas the contractor selection for Berbera, Borama and Kismayo is advianced [sic].\" The results tables repeat that \"The procurement of EPC contractors for an additional 3 ESPs (BEC-Berbera, AEC-Borama, WESCO-Kismayo) with an estimated total capacity of 26MWp expected to be awarded by November 30, 2025\", and record the corresponding installed-capacity indicators as 0.00 as of 15 Oct 2025.",
      "caveat": "The report gives an expected award date of 30 November 2025, weeks after publication, so the contract may have been awarded since. \"Most recent public report\" describes the ISR series as it stood when the entry was verified, not necessarily today.",
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     }
    ],
    "sources": [
     {
      "id": "src-53c6a3b68d33e7de",
      "title": "SolarGen Technologies — Kismayo Solar Mini-Grid (operator)",
      "url": "https://solargentechnologies.com/portfolio/kismayo-solar-mini-grid/",
      "publisher": {
       "name": null,
       "domain": "solargentechnologies.com",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-bcd0efa3f50eff02",
       "clm-97b65f7b157ce9d8",
       "clm-de59823ed07a51f3",
       "clm-58da375c92b94c77",
       "clm-05aaa29fc93fc3f8"
      ],
      "temporal": {
       "publishedAt": null,
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-08-07",
       "dossierCreatedAt": "2026-08-21",
       "retrievedAt": null,
       "status": "record-date-only"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Trägt: 2018, 110 Familien, Schule/Klinik/Polizeiposten/Markt, Dadaab-Rückkehrer; beschreibt ein Solar-Mini-Grid (kein Diesel)",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-557eae823760057c",
      "title": "Microgrid Knowledge (trade)",
      "url": "https://microgridknowledge.com/solar-microgrids-somalia-solargen",
      "publisher": {
       "name": null,
       "domain": "microgridknowledge.com",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-bcd0efa3f50eff02",
       "clm-97b65f7b157ce9d8",
       "clm-de59823ed07a51f3",
       "clm-58da375c92b94c77",
       "clm-05aaa29fc93fc3f8"
      ],
      "temporal": {
       "publishedAt": null,
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-08-07",
       "dossierCreatedAt": "2026-08-21",
       "retrievedAt": null,
       "status": "record-date-only"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Trägt: Auslegung für 100 Haushalte + 5 öffentliche Einrichtungen, Finanzierung UNHCR + Somalia Stability Fund, Umsetzung mit American Refugee Committee",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-47249953e58a1d5a",
      "title": "Hiiraan Online (press)",
      "url": "https://www.hiiraan.com/news4/2018/Apr/157658/how_solar_microgrids_are_bringing_stability_to_war_torn_somalia.aspx",
      "publisher": {
       "name": null,
       "domain": "hiiraan.com",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-de59823ed07a51f3",
       "clm-58da375c92b94c77"
      ],
      "temporal": {
       "publishedAt": null,
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-08-07",
       "dossierCreatedAt": "2026-08-21",
       "retrievedAt": null,
       "status": "record-date-only"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Zeitgenössische Presse-Fassung desselben Berichts; blockt automatisierte Abrufe (403), Existenz per Suche bestätigt",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-682dd1b2e1adc7a2",
      "title": "World Bank — SESRP Implementation Status & Results Report (P173088, Nov 2025)",
      "url": "https://documents1.worldbank.org/curated/en/099110425105521326/pdf/P173088-768d0297-9765-4477-ab01-1aef8b51b2df.pdf",
      "publisher": {
       "name": null,
       "domain": "documents1.worldbank.org",
       "classification": "not-classified"
      },
      "sourceType": "pdf",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-7b39b44a141d60b4",
       "clm-e0cf2921405afa56",
       "clm-21a9506657809fe9",
       "clm-af5d62896b9368fd"
      ],
      "temporal": {
       "publishedAt": null,
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-08-07",
       "dossierCreatedAt": "2026-08-21",
       "retrievedAt": null,
       "status": "record-date-only"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Trägt den 'still unawarded'-Satz: WESCO-Kismayo unter 3 EPC-Verträgen noch im Vergabeverfahren, Zuschlag erwartet 30.11.2025",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-e1a61e94c91d7e82",
      "title": "SESRP Request for Bids — 6MWp Solar PV + 10 MWh BESS for WESCO, Kismayo",
      "url": "https://somalijobs.com/tenders/kismayo/16326581707714096/request-for-bids-(rfp)-for-design,-supply,-installation,-testing,-and-commissioning-of-6mwp-solar-pv-power-plant-with-10-mwh-of-battery-energy-storage-system-for-wesco,-kismayo-city,-somalia.",
      "publisher": {
       "name": null,
       "domain": "somalijobs.com",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-7b39b44a141d60b4",
       "clm-e0cf2921405afa56",
       "clm-21a9506657809fe9"
      ],
      "temporal": {
       "publishedAt": null,
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-08-07",
       "dossierCreatedAt": "2026-08-21",
       "retrievedAt": null,
       "status": "record-date-only"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Trägt die Spezifikation der Ausschreibung: 6 MWp PV + 10 MWh Batteriespeicher für WESCO",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     }
    ],
    "coverage": {
     "claimsTotal": 9,
     "claimsMapped": 9,
     "sourcesTotal": 5,
     "sourcesUsedByClaims": 5,
     "sourcesWithPublicationDate": 0,
     "sourcesWithArchive": 0,
     "sourcesWithExactLocator": 0,
     "sourcesWithContentHash": 0
    },
    "limits": [
     "Publisher names and source languages have not yet been classified; domains are recorded without guessing.",
     "Existing source notes are descriptive locators, not page- or paragraph-exact citations.",
     "A missing archive, publication date or content hash is shown as null rather than inferred.",
     "The project-level evidence grade ranks the strongest source in the entry; it is not a truth score for every claim."
    ]
   }
  },
  {
   "id": "2026-08-21-unsourced-text-correction",
   "createdAt": "2026-08-21T23:50:00Z",
   "effectiveAt": "2026-08-07",
   "changeType": "correction",
   "summary": "Removed or softened wording that no listed source carries, after reading every source while preparing the claim ledger. No source calls this Kismayo's first mini-grid or states the 2018 capacity that 'far larger' compares against, and both sources name WESCO rather than a national main grid.",
   "preparedBy": {
    "type": "automation",
    "label": "AI-assisted evidence preparation",
    "humanApproved": false
   },
   "review": {
    "status": "unreviewed",
    "by": null,
    "date": null,
    "note": "Awaiting operator and domain-expert review; publication of this revision implies neither."
   },
   "changes": [
    {
     "operation": "replace",
     "path": "/snapshot/projectFingerprint",
     "summary": "Updated projectFingerprint to the current sourced project record."
    },
    {
     "operation": "replace",
     "path": "/snapshot/claims",
     "summary": "Updated claims to the current sourced project record."
    },
    {
     "operation": "replace",
     "path": "/snapshot/sources",
     "summary": "Updated sources to the current sourced project record."
    }
   ],
   "snapshotHash": "sha256:1f2dbc46d1ad98110b242f2993a03a815a1f0f2095d6239b4e541723f3eeec83",
   "snapshot": {
    "asOf": "2026-08-07",
    "projectFingerprint": "sha256:472cc0724e79e941429d398d3983f4b7578d8ab05602f2eafbe2ea09f93e8bc9",
    "assurance": {
     "status": "unreviewed",
     "scope": "evidence-passport-revision",
     "statement": "AI-assisted structural preparation. This revision has not been reviewed by a human or subject-matter expert.",
     "machineChecks": [
      "schema",
      "publication-diff-contract",
      "material-project-fingerprint",
      "claim-text-drift",
      "source-reference-resolution",
      "complete-source-dossier",
      "snapshot-hash"
     ]
    },
    "projectState": {
     "status": "live",
     "outcome": "ongoing",
     "evidenceGrade": "official",
     "timeline": {
      "started": 2018,
      "ended": null
     }
    },
    "governance": {
     "operator": "SolarGen Technologies, for the American Refugee Committee, funded by UNHCR and the Somalia Stability Fund",
     "actorTypes": [
      "private",
      "civil-society"
     ],
     "fundingModel": "grant",
     "fundingDescription": null,
     "cost": null,
     "ownership": null,
     "decisionRights": null,
     "exitConditions": null
    },
    "claims": [
     {
      "id": "clm-554cb74dbf180b36",
      "field": "snippet",
      "text": "SolarGen built a solar mini-grid in Kismayo",
      "statementKind": "descriptive",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-53c6a3b68d33e7de",
       "src-557eae823760057c"
      ],
      "supportNote": "SolarGen's own project page is headed \"Kismayo Solar Mini-Grid\" and names itself the builder, with \"Client: ARC\" and \"Location: Kismayo\"; it describes \"a community solar mini grid that was designed to provide power to resettled communities back from Dadaab Refugee camp\". Microgrid Knowledge reported in April 2018 that \"A second solar microgrid will be built by SolarGen in a new development for returning refugees in Kismayo.\"",
      "caveat": "No source calls this Kismayo's first mini-grid; Microgrid Knowledge counts it as SolarGen's second in Somalia.",
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-97b65f7b157ce9d8",
      "field": "snippet",
      "text": "in 2018",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-53c6a3b68d33e7de",
       "src-557eae823760057c"
      ],
      "supportNote": "The operator's project page dates the project in its metadata block, \"Year: 2018\" — the string \"2018\" occurs exactly once on that page. Microgrid Knowledge's report of 13 April 2018 places the Kismayo build in that year, but still in the future tense (\"will be built\").",
      "caveat": "The year stands only in a two-cell metadata field (\"Year:\" / \"2018\"), not in a dated sentence, and it is not stated whether 2018 is the year of construction or of commissioning. The trade report from April 2018 had the project still unbuilt.",
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-de59823ed07a51f3",
      "field": "snippet",
      "text": "for a resettlement area housing refugees returning from Kenya's Dadaab camp",
      "statementKind": "descriptive",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-53c6a3b68d33e7de",
       "src-557eae823760057c",
       "src-47249953e58a1d5a"
      ],
      "supportNote": "SolarGen: the grid \"was designed to provide power to resettled communities back from Dadaab Refugee camp, Kenya, one of the largest refugee camps in the world to Kismayo, Somalia\", and calls the site \"a model settlement\". Microgrid Knowledge and Hiiraan Online carry SolarGen's Sean Brooks verbatim: the system serves \"the area designated for refugees returning back to Somalia from Kenya\", in \"a new development for returning refugees\" whose houses the American Refugee Committee was building.",
      "caveat": "Hiiraan Online is the same Lisa Cohn report republished, not an independent second witness. Only SolarGen names Dadaab specifically; the two press copies say only \"from Kenya\".",
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-58da375c92b94c77",
      "field": "snippet",
      "text": "powering some 110 households",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-53c6a3b68d33e7de",
       "src-557eae823760057c",
       "src-47249953e58a1d5a"
      ],
      "supportNote": "SolarGen's project page states \"Servicing: 110 Families\" and, in prose, \"The system provides power to 110 families\". Microgrid Knowledge and Hiiraan Online quote SolarGen's own design target from before construction: \"we designed a system to support 100 households and five public facilities\".",
      "caveat": "The two figures differ: 110 is the operator's own count on its completed-project page, 100 the design target quoted in April 2018 before the grid was built. Neither figure has been checked by anyone outside SolarGen, and the entry's hedge \"some\" carries that gap.",
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-05aaa29fc93fc3f8",
      "field": "snippet",
      "text": "alongside a school, clinic, police post and market",
      "statementKind": "descriptive",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-53c6a3b68d33e7de",
       "src-557eae823760057c"
      ],
      "supportNote": "SolarGen names all four: the system provides power \"to 110 families, a clinic, a school, a police station and a marketplace\". Microgrid Knowledge gives only the count from the design stage — \"100 households and five public facilities\".",
      "caveat": "SolarGen names four facilities where the design quoted by Microgrid Knowledge counted five; the fifth is not identified in any source. \"Police post\" and \"market\" are the entry's shortenings of the operator's \"police station\" and \"marketplace\".",
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-7b39b44a141d60b4",
      "field": "snippet",
      "text": "Somalia's World Bank-financed utility-recovery programme",
      "statementKind": "descriptive",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-682dd1b2e1adc7a2",
       "src-e1a61e94c91d7e82"
      ],
      "supportNote": "The tender states that \"The Federal Government of Somalia has received financing from the World Bank toward the cost of the Somali Electricity Sector Recovery Project\". The Implementation Status & Results Report of 4 Nov 2025 identifies the same operation (P173088, IBRD/IDA, Investment Project Financing, credit IDA-D9310 of US$150m) and gives its objective as \"to increase access to lower cost and cleaner electricity supply in project areas and to reestablish the electricity supply industry\".",
      "caveat": "\"Utility-recovery programme\" is the entry's paraphrase; the programme's own name is the Somali Electricity Sector Recovery Project, and re-establishing the electricity supply industry is one of two stated objectives alongside cheaper and cleaner supply.",
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-c4e0d51c11a3c62d",
      "field": "snippet",
      "text": "has since tendered a 6 MWp solar-plus-storage plant",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-e1a61e94c91d7e82",
       "src-682dd1b2e1adc7a2"
      ],
      "supportNote": "The Request for Bids invites sealed bids for the \"Design, Supply, Installation, Testing, and Commissioning of 6MWp Solar PV Power Plant with 10 MWh of Battery Energy Storage System for Wamo Energy Service Company (WESCO), Kismayo City, Somalia\", run as international competitive procurement under the World Bank's Procurement Regulations. The ISR confirms an EPC procurement is under way for WESCO-Kismayo alongside Berbera and Borama.",
      "caveat": "No source states the capacity of the 2018 mini-grid, so the entry no longer calls the tendered plant 'far larger'.",
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-2a6eba13b6e71f07",
      "field": "snippet",
      "text": "for WESCO's Kismayo grid",
      "statementKind": "descriptive",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-e1a61e94c91d7e82",
       "src-682dd1b2e1adc7a2"
      ],
      "supportNote": "Both sources name the beneficiary as the city's electricity service provider rather than the returnee settlement: the tender is \"for Wamo Energy Service Company (WESCO), Kismayo City, Somalia\", and the ISR lists \"WESCO-Kismayo\" among the electricity service providers (ESPs) receiving solar PV and battery storage under Component 2.",
      "caveat": "Both sources name WESCO, the city utility, rather than a national main grid.",
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-af5d62896b9368fd",
      "field": "snippet",
      "text": "it remained unawarded in the programme's most recent public report",
      "statementKind": "descriptive",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-682dd1b2e1adc7a2"
      ],
      "supportNote": "The ISR of 4 November 2025 (Seq No: 8, ISR058161) still carries the Kismayo contract as unawarded: \"The installation of Solar PV and Battery Energy Storage Systems in Galkayo, Growe, Baidoa has commenced whereas the contractor selection for Berbera, Borama and Kismayo is advianced [sic].\" The results tables repeat that \"The procurement of EPC contractors for an additional 3 ESPs (BEC-Berbera, AEC-Borama, WESCO-Kismayo) with an estimated total capacity of 26MWp expected to be awarded by November 30, 2025\", and record the corresponding installed-capacity indicators as 0.00 as of 15 Oct 2025.",
      "caveat": "The report gives an expected award date of 30 November 2025, weeks after publication, so the contract may have been awarded since. \"Most recent public report\" describes the ISR series as it stood when the entry was verified, not necessarily today.",
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     }
    ],
    "sources": [
     {
      "id": "src-53c6a3b68d33e7de",
      "title": "SolarGen Technologies — Kismayo Solar Mini-Grid (operator)",
      "url": "https://solargentechnologies.com/portfolio/kismayo-solar-mini-grid/",
      "publisher": {
       "name": null,
       "domain": "solargentechnologies.com",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-554cb74dbf180b36",
       "clm-97b65f7b157ce9d8",
       "clm-de59823ed07a51f3",
       "clm-58da375c92b94c77",
       "clm-05aaa29fc93fc3f8"
      ],
      "temporal": {
       "publishedAt": null,
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-08-07",
       "dossierCreatedAt": "2026-08-21",
       "retrievedAt": null,
       "status": "record-date-only"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Trägt: 2018, 110 Familien, Schule/Klinik/Polizeiposten/Markt, Dadaab-Rückkehrer; beschreibt ein Solar-Mini-Grid (kein Diesel)",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-557eae823760057c",
      "title": "Microgrid Knowledge (trade)",
      "url": "https://microgridknowledge.com/solar-microgrids-somalia-solargen",
      "publisher": {
       "name": null,
       "domain": "microgridknowledge.com",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-554cb74dbf180b36",
       "clm-97b65f7b157ce9d8",
       "clm-de59823ed07a51f3",
       "clm-58da375c92b94c77",
       "clm-05aaa29fc93fc3f8"
      ],
      "temporal": {
       "publishedAt": null,
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-08-07",
       "dossierCreatedAt": "2026-08-21",
       "retrievedAt": null,
       "status": "record-date-only"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Trägt: Auslegung für 100 Haushalte + 5 öffentliche Einrichtungen, Finanzierung UNHCR + Somalia Stability Fund, Umsetzung mit American Refugee Committee",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-47249953e58a1d5a",
      "title": "Hiiraan Online (press)",
      "url": "https://www.hiiraan.com/news4/2018/Apr/157658/how_solar_microgrids_are_bringing_stability_to_war_torn_somalia.aspx",
      "publisher": {
       "name": null,
       "domain": "hiiraan.com",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-de59823ed07a51f3",
       "clm-58da375c92b94c77"
      ],
      "temporal": {
       "publishedAt": null,
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-08-07",
       "dossierCreatedAt": "2026-08-21",
       "retrievedAt": null,
       "status": "record-date-only"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Zeitgenössische Presse-Fassung desselben Berichts; blockt automatisierte Abrufe (403), Existenz per Suche bestätigt",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-682dd1b2e1adc7a2",
      "title": "World Bank — SESRP Implementation Status & Results Report (P173088, Nov 2025)",
      "url": "https://documents1.worldbank.org/curated/en/099110425105521326/pdf/P173088-768d0297-9765-4477-ab01-1aef8b51b2df.pdf",
      "publisher": {
       "name": null,
       "domain": "documents1.worldbank.org",
       "classification": "not-classified"
      },
      "sourceType": "pdf",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-7b39b44a141d60b4",
       "clm-c4e0d51c11a3c62d",
       "clm-2a6eba13b6e71f07",
       "clm-af5d62896b9368fd"
      ],
      "temporal": {
       "publishedAt": null,
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-08-07",
       "dossierCreatedAt": "2026-08-21",
       "retrievedAt": null,
       "status": "record-date-only"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Trägt den 'still unawarded'-Satz: WESCO-Kismayo unter 3 EPC-Verträgen noch im Vergabeverfahren, Zuschlag erwartet 30.11.2025",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-e1a61e94c91d7e82",
      "title": "SESRP Request for Bids — 6MWp Solar PV + 10 MWh BESS for WESCO, Kismayo",
      "url": "https://somalijobs.com/tenders/kismayo/16326581707714096/request-for-bids-(rfp)-for-design,-supply,-installation,-testing,-and-commissioning-of-6mwp-solar-pv-power-plant-with-10-mwh-of-battery-energy-storage-system-for-wesco,-kismayo-city,-somalia.",
      "publisher": {
       "name": null,
       "domain": "somalijobs.com",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-7b39b44a141d60b4",
       "clm-c4e0d51c11a3c62d",
       "clm-2a6eba13b6e71f07"
      ],
      "temporal": {
       "publishedAt": null,
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-08-07",
       "dossierCreatedAt": "2026-08-21",
       "retrievedAt": null,
       "status": "record-date-only"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Trägt die Spezifikation der Ausschreibung: 6 MWp PV + 10 MWh Batteriespeicher für WESCO",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     }
    ],
    "coverage": {
     "claimsTotal": 9,
     "claimsMapped": 9,
     "sourcesTotal": 5,
     "sourcesUsedByClaims": 5,
     "sourcesWithPublicationDate": 0,
     "sourcesWithArchive": 0,
     "sourcesWithExactLocator": 0,
     "sourcesWithContentHash": 0
    },
    "limits": [
     "Publisher names and source languages have not yet been classified; domains are recorded without guessing.",
     "Existing source notes are descriptive locators, not page- or paragraph-exact citations.",
     "A missing archive, publication date or content hash is shown as null rather than inferred.",
     "The project-level evidence grade ranks the strongest source in the entry; it is not a truth score for every claim."
    ]
   }
  }
 ]
}