HOFOR and Danfoss use AI-based predictive control (Leanheat) to shift heat demand in Copenhagen buildings
Permanent project revision
Revision 2026-08-21-unsourced-text-correction · effective 2026-07-23
Current revision. This is the snapshot used by the live entity page.
Corrected a figure conflation in the snippet that the impact field already carried: the 22% belongs to maximum peak power, the morning-peak value is 14%.
sha256:c7b507017d8b8df8b6ee08d3430d01073ed8ff44eb2a0da5f1af772774c572c6
replace /snapshot/projectFingerprint — Updated projectFingerprint to the current sourced project record.replace /snapshot/claims — Updated claims to the current sourced project record.replace /snapshot/sources — Updated sources to the current sourced project record.The text below is copied verbatim from the published record. Each claim names the source dossiers that carry it; caveats stay attached to the claim they qualify.
clm-ac673c56a1a19d4b
descriptive
HOFOR and Danfoss use AI-based predictive control (Leanheat) to shift heat demand in Copenhagen buildings
clm-1daae3fc3ba24f4f
quantitative
A 2021/22 pilot on 17 municipal buildings
clm-875a45574140f43f
quantitative
cut the maximum peak load up to 22%, and the morning peak by 14%
clm-392337653ded5929
quantitative
A 2023-launched rollout
clm-8c4e19c8d3cc5c39
quantitative
now covers 140 buildings from 20 owners
clm-c8b1fee4ae8bf46b
quantitative
activating about 8 MW of flexible capacity
clm-272b7bbb3caabeeb
quantitative
averaging 5% energy savings
clm-40c1b72698a3e06b
quantitative
2021/22 pilot cut the maximum peak heat load up to 22%
clm-2143e5e25f29451b
quantitative
across 17 municipal buildings
clm-e4ff103b3b55c2b4
quantitative
the 2023 rollout
clm-1efa0f1e06909adf
quantitative
covers 140 buildings/20 owners as reported in October 2025
clm-26e8e7017876f064
quantitative
activating ~8 MW of flexible capacity
clm-8b1386632baf03e6
quantitative
averaging 5% energy savings
clm-aeacbd15407fa867
quantitative
the morning peak specifically by 14%
This layer records what is known about each source, what is still missing, and the exact snapshot this page is rendering. A missing date, archive or hash stays visible as missing.
Awaiting operator and domain-expert review; publication of this revision implies neither.
sha256:c7b507017d8b8df8b6ee08d3430d01073ed8ff44eb2a0da5f1af772774c572c6
src-e3bdeb3de90cf2c0Official Danfoss press release, 2023-11-20 — rollout announcement, target scope.
src-9b8d2fb4ad1ee716Danish District Heating Association trade journal, 2025-10-21 — current status: 140 buildings, 20 owners, ~8 MW flexibility, 5% savings.
src-de805229232d7a15Trade press, 2023-07-07 — 2021/22 municipal-building pilot results (14%/22% peak reduction).