Permanent project revision

Centro de Operações do Recife (COP)

Revision 2026-08-27-claims-and-sources · effective 2026-08-06

Superseded. A later revision exists: 2026-08-27-source-dating →

unreviewed

Created the first structured Evidence Passport with 6 claims and 5 source dossiers.

sha256:f0e706d5d08202d52b1b6acbdbb764aa8500fe9f2687c7b54d6f70ecfd8fdbd1

Change set

  • add /evidencePassport — Added claim-level evidence mapping and source dossiers.
  • add /revisionHistory — Established a permanent, hash-addressed baseline revision.
6
of 6 claims mapped
5
source dossiers
3
publication dates recorded
0
archives linked
0
exact locators
0
content captures hashed

Claims, one by one

The text below is copied verbatim from the published record. Each claim names the source dossiers that carry it; caveats stay attached to the claim they qualify.

Claim 1 clm-934129c405ee192c quantitative
Recife opened the COP in 2023, a year after the floods and landslides of May 2022 killed more than 100 people in and around the city
Published field
snippet · verbatim
Mapping
mapped · no interpretation or interpolation added by this passport
What the mapping says
The May 2022 report gives the death toll of more than 100 from the torrential rains in north-east Brazil; the July 2023 report covers the centre and the instruments being installed for it.
Caveat
No claim-specific caveat recorded

Sources carrying this claim

  1. Diário de Pernambuco (independent press)
  2. Al Jazeera / CBS News (May–June 2022 disaster)
Claim 2 clm-37e3712d0f48978f quantitative
An ArcGIS dashboard pools traffic feeds, rain gauges, flood sensors and city cameras for 13 municipal agencies in one room
Published field
snippet · verbatim
Mapping
mapped · no interpretation or interpolation added by this passport
What the mapping says
The vendor case study describes the ArcGIS dashboard bringing the city's feeds together for the agencies represented in the room; the award report describes the same centre.
Caveat
No claim-specific caveat recorded

Sources carrying this claim

  1. IMG / Esri Brasil (vendor case study)
  2. Hoje Pernambuco (independent press)
Claim 3 clm-07e22cd3b1ce850c descriptive
staff decide what to dispatch, and no reading triggers anything by itself
Published field
snippet · verbatim
Mapping
mapped · no interpretation or interpolation added by this passport
What the mapping says
Neither the vendor case study nor the press reporting describes any automatic actuation; both describe monitoring and coordinated dispatch by the agencies present.
Caveat
No claim-specific caveat recorded

Sources carrying this claim

  1. IMG / Esri Brasil (vendor case study)
  2. Diário de Pernambuco (independent press)
Claim 4 clm-9c460dfe0a9d3d24 quantitative
It moved to a larger site in March 2026
Published field
snippet · verbatim
Mapping
mapped · no interpretation or interpolation added by this passport
What the mapping says
The report on the 2026 winter action plan covers the inauguration of the centre's new, larger premises.
Caveat
No claim-specific caveat recorded

Sources carrying this claim

  1. Folha de Pernambuco (independent press)
Claim 5 clm-505409fa19ea39e7 descriptive
the sensor network itself started at five gauges and five flood sensors, against a stated goal of fifty
Published field
lesson · verbatim
Mapping
mapped · no interpretation or interpolation added by this passport
What the mapping says
The July 2023 report announcing the installation gives the initial five rain gauges and five flood sensors and the stated target of fifty.
Caveat
No claim-specific caveat recorded

Sources carrying this claim

  1. Diário de Pernambuco (independent press)
Claim 6 clm-ad40eab5cc38a350 quantitative
Recife's gauges and flood sensors tell 13 agencies where water is rising, but every crew, pump and road closure still waits for a person in the room to order it
Published field
lesson · verbatim
Mapping
mapped · no interpretation or interpolation added by this passport
What the mapping says
The sources describe the centre as a coordination and monitoring instrument for the agencies present; none describes an automatic response of any kind.
Caveat
No claim-specific caveat recorded

Sources carrying this claim

  1. IMG / Esri Brasil (vendor case study)
  2. Diário de Pernambuco (independent press)
  3. Folha de Pernambuco (independent press)

Source dossiers and revision state

This layer records what is known about each source, what is still missing, and the exact snapshot this page is rendering. A missing date, archive or hash stays visible as missing.

unreviewed Revision 2026-08-27-claims-and-sources effective 2026-08-06 · created 2026-08-27

Awaiting operator and domain-expert review; publication of this revision implies neither.

Erratum on this revision's envelope. The snapshot, its hash and its permanent link are untouched.

  • createdAt previously read 2026-09-04T11:00:00Z. The batching script that produced this revision advanced createdAt into the future to satisfy the strictly-increasing order the validator requires per entity. The value never recorded a real event; the corrected value is the moment the revision provably existed in the repository. Corrected to 2026-08-27T04:27:38Z on 2026-08-27; evidence: first appears in commit c72c679590, committed 2026-08-27T04:27:38Z.
sha256:f0e706d5d08202d52b1b6acbdbb764aa8500fe9f2687c7b54d6f70ecfd8fdbd1
6
of 6 claims mapped
5
source dossiers
3
publication dates recorded
0
archives linked
0
exact locators
0
content captures hashed

Governance facts carried by the record

Operator
Prefeitura do Recife — Centro de Operações do Recife (COP)
Actor types
city-government
Funding model
public
Funding description
City of Recife (municipal budget)
Cost
Not recorded
Ownership
Not recorded
Decision rights
Not recorded
Exit conditions
Not recorded

5 source dossiers

Diário de Pernambuco (independent press) diariodepernambuco.com.br · 4 linked claims

Open original source ↗

Stable source ID
src-4c0eb3f66bb2ebd5
Publisher
Name not classified · diariodepernambuco.com.br
Type / language
web-page · language not classified
Published
2023-07-07
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-08-06
Dossier created
2026-09-04
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

July 2023: first 5 rain gauges and 5 flood sensors, goal of 50; COP unites 13 secretariats; mayor frames the data as input to human decisions.

Descriptive only — not page/paragraph exact
Hoje Pernambuco (independent press) hojepe.com.br · 1 linked claim

Open original source ↗

Stable source ID
src-afff810624dd88e1
Publisher
Name not classified · hojepe.com.br
Type / language
web-page · language not classified
Published
2023-10-05
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-08-06
Dossier created
2026-09-04
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

2023 founding; second place in the audience-choice award among 70 projects from 48 institutions at the 2023 Esri Brasil meeting.

Descriptive only — not page/paragraph exact
Folha de Pernambuco (independent press) folhape.com.br · 2 linked claims

Open original source ↗

Stable source ID
src-c69a89d884845d4e
Publisher
Name not classified · folhape.com.br
Type / language
web-page · language not classified
Published
Not recorded
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-08-06
Dossier created
2026-09-04
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

A report on the 2026 winter action plan and the opening of the centre's new premises.

Descriptive only — not page/paragraph exact
IMG / Esri Brasil (vendor case study) blog.img.com.br · 3 linked claims

Open original source ↗

Stable source ID
src-c513f9720812ac5b
Publisher
Name not classified · blog.img.com.br
Type / language
web-page · language not classified
Published
Not recorded
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-08-06
Dossier created
2026-09-04
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

A case study by the platform vendor describing the ArcGIS dashboard behind the centre.

Descriptive only — not page/paragraph exact
Al Jazeera / CBS News (May–June 2022 disaster) aljazeera.com · 1 linked claim

Open original source ↗

Stable source ID
src-184a5b8ceaf59829
Publisher
Name not classified · aljazeera.com
Type / language
web-page · language not classified
Published
2022-05-31
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-08-06
Dossier created
2026-09-04
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

Independent confirmation of the motivating event: at least 106 dead in north-east Brazil, concentrated in the Recife metropolitan region.

Descriptive only — not page/paragraph exact
Known limits of this passport
  • Publisher names and source languages have not yet been classified; domains are recorded without guessing.
  • Existing source notes are descriptive locators, not page- or paragraph-exact citations.
  • A missing archive, publication date or content hash is shown as null rather than inferred.
  • The project-level evidence grade ranks the strongest source in the entry; it is not a truth score for every claim.