clm-8894b8478e746133
quantitative
about 547 premature deaths averted among City-supplied residents aged 65 and over, 2015-2019, 95% confidence interval 94 to 1,002
Permanent project revision
Revision 2026-08-20-source-dates-2 · effective 2026-07-26
Current revision. This is the snapshot used by the live entity page.
Record publication (and where stated, revision) dates for this entry's sources.
sha256:c68d89bcbaf27213b209de1c71300f024aa84ba41a1621414b4c4e034b7b3f45
replace /snapshot/projectFingerprint — Updated projectFingerprint to the current sourced project record.replace /snapshot/sources — Updated sources to the current sourced project record.The text below is copied verbatim from the published record. Each claim names the source dossiers that carry it; caveats stay attached to the claim they qualify.
clm-8894b8478e746133
quantitative
about 547 premature deaths averted among City-supplied residents aged 65 and over, 2015-2019, 95% confidence interval 94 to 1,002
This layer records what is known about each source, what is still missing, and the exact snapshot this page is rendering. A missing date, archive or hash stays visible as missing.
Awaiting operator and domain-expert review; publication of this revision implies neither.
sha256:c68d89bcbaf27213b209de1c71300f024aa84ba41a1621414b4c4e034b7b3f45
src-da8ca68a8bf269c3Fetched. Joshua Budlender, July 2024. Abstract: 'the introduction of a unique load shedding reduction policy in parts of South Africa's second-largest city'. Confirms the policy statistically significantly reduces mortality and that 'the incomplete geographic coverage of the mitigation policy entrenches existing inequalities in the city'. The page states explicitly that this is a working paper, not peer-reviewed — hence evidence graded independent, not peer-reviewed.
src-a0875eea1ed0b7d3Fetched. Author's home institution summarising the paper: synthetic control across the 2015, 2018 and 2019 mitigation episodes; Steenbras used to mitigate load shedding since June 2015 — the source for yearStart; 547 deaths averted, 95% CI 94-1,002; mitigation covered about 73% of the City's 65+ population; mortality data from the SA Medical Research Council, load-shedding data from the City and EskomSePush.
src-98f735e96f1cf8a8Fetched. Sole verified source for the 81% white / 27% black African split between protected and unprotected areas, and for the author's framing of it as a legacy of apartheid-era urban planning.
src-930139edd154e798Fetched. 180 MW, four turbines, City owns and operates it, only South African city to do so; Stage 4 held while Eskom ran Stage 6 in June 2022; 514 hours or 21 days of one-stage protection January to May 2022 (City figures); analyst Chris Yelland on fast hydro ramping and on why other municipalities cannot copy it.
src-7083a6479c9bc8e4Fetched. R1bn refurbishment plus R200m maintenance over nine years; Energy MMC Beverley van Reenen on protecting 'a stage or two, where possible' and the plan to reach four stages. Note the capacity discrepancy: this source and most City statements say 160 MW (available output), the plant record says 180 MW nameplate.
src-bee826797942e1b0Fetched. The 70/30 City-Eskom supply split; protection of about two stages applies to City-supplied zones only; Mayor Geordin Hill-Lewis, 'We want to supply the entire city'; the takeover talks Eskom later declined.
src-647e5f0faf1bb6e8Fetched. Used only for plant specification: 4 x 45 MW reversible turbines, 180 MW installed, commissioned 1979, owned and operated by the City of Cape Town Electricity Department. Low-authority source, cited only for specification, and its claim of being Africa's first pumped-storage scheme was NOT used — single weak citation.
src-fdeac7b516cad688Fetched. Currency check: last national load-shedding 15 May 2025; at 00:01 on 16 May 2026 Eskom had gone one full year without it, the first since September 2018. Basis for status live but function dormant, outcome ongoing. Eskom's own milestone page returned HTTP 403 to automated fetching.
src-4b3d0c53b3e3d2c6FETCH FAILED — capetown.gov.za returned HTTP 502 to every automated request across three attempts, and its load-shedding FAQ PDF could not be parsed. Listed as the authoritative municipal statement of the supply split; every fact drawn from it here is instead carried by the independently fetched Bloomberg and UNU-WIDER sources.