 "schemaVersion": "1.0.0",
 "constitutionVersion": "1.0.0",
 "createdAt": "2026-08-12T00:00:00Z",
 "description": "Append-only Evidence Passport records. Old revisions are immutable; corrections create a new revision and preserve the previous permalink.",
 "entity": {
  "type": "project",
  "id": "cape-town-load-shedding-protection",
  "title": "Holding Its Own Customers Below the National Load-Shedding Stage",
  "canonicalUrl": "https://1001smartcities.org/projects/cape-town-load-shedding-protection/"
 },
 "currentRevisionId": "2026-08-20-source-dates-2",
 "revisions": [
  {
   "id": "2026-08-20-source-dates",
   "createdAt": "2026-08-20T19:03:10Z",
   "effectiveAt": "2026-07-26",
   "changeType": "baseline",
   "summary": "Created the first structured Evidence Passport with 1 claim and 9 source dossiers.",
   "preparedBy": {
    "type": "automation",
    "label": "AI-assisted evidence preparation",
    "humanApproved": false
   },
   "review": {
    "status": "unreviewed",
    "by": null,
    "date": null,
    "note": "Awaiting operator and domain-expert review; publication of this revision implies neither."
   },
   "changes": [
    {
     "operation": "add",
     "path": "/evidencePassport",
     "summary": "Added claim-level evidence mapping and source dossiers."
    },
    {
     "operation": "add",
     "path": "/revisionHistory",
     "summary": "Established a permanent, hash-addressed baseline revision."
    }
   ],
   "snapshotHash": "sha256:a950d2688686e3236f1e959f9a1111e0e1443783e8575c201f7aa2d5ef8abf50",
   "snapshot": {
    "asOf": "2026-07-26",
    "projectFingerprint": "sha256:9e7c4e0f780b0c669cbdd63eb10686596be27e90e1c71584f97bd6c2d30e6fbc",
    "assurance": {
     "status": "unreviewed",
     "scope": "evidence-passport-revision",
     "statement": "AI-assisted structural preparation. This revision has not been reviewed by a human or subject-matter expert.",
     "machineChecks": [
      "schema",
      "publication-diff-contract",
      "material-project-fingerprint",
      "claim-text-drift",
      "source-reference-resolution",
      "complete-source-dossier",
      "snapshot-hash"
     ]
    },
    "projectState": {
     "status": "live",
     "outcome": "ongoing",
     "evidenceGrade": "independent",
     "timeline": {
      "started": 2015,
      "ended": null
     }
    },
    "governance": {
     "operator": "City of Cape Town — Energy Directorate (Steenbras Hydro Pump Station)",
     "actorTypes": [
      "utility"
     ],
     "fundingModel": "public",
     "fundingDescription": "City of Cape Town capital budget",
     "cost": "≈R1.2bn budgeted in 2023 for Steenbras: about R1bn refurbishment and expansion plus about R200m maintenance over nine years",
     "ownership": null,
     "decisionRights": null,
     "exitConditions": null
    },
    "claims": [
     {
      "id": "clm-8894b8478e746133",
      "field": "impact",
      "text": "about 547 premature deaths averted among City-supplied residents aged 65 and over, 2015-2019, 95% confidence interval 94 to 1,002",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-da8ca68a8bf269c3"
      ],
      "supportNote": "The estimate comes from Joshua Budlender's stacked synthetic-control working paper UNU-WIDER 2024-44.",
      "caveat": "The author stresses the estimate is imprecise, and the same study finds the protected areas hold 81% of the city's white residents against 27% of its black African residents.",
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     }
    ],
    "sources": [
     {
      "id": "src-da8ca68a8bf269c3",
      "title": "UNU-WIDER: Surviving in the Dark (WP2024-44)",
      "url": "https://www.wider.unu.edu/publication/surviving-dark-mortality-effects-reducing-rolling-blackouts",
      "publisher": {
       "name": null,
       "domain": "wider.unu.edu",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-8894b8478e746133"
      ],
      "temporal": {
       "publishedAt": null,
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-07-26",
       "dossierCreatedAt": "2026-08-20",
       "retrievedAt": null,
       "status": "record-date-only"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Fetched. Joshua Budlender, July 2024. Abstract: 'the introduction of a unique load shedding reduction policy in parts of South Africa's second-largest city'. Confirms the policy statistically significantly reduces mortality and that 'the incomplete geographic coverage of the mitigation policy entrenches existing inequalities in the city'. The page states explicitly that this is a working paper, not peer-reviewed — hence evidence graded independent, not peer-reviewed.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": "https://web.archive.org/web/20260325021601/https://www.wider.unu.edu/publication/surviving-dark-mortality-effects-reducing-rolling-blackouts",
       "archivedAt": "2026-03-25",
       "contentHash": null,
       "status": "archive-linked"
      }
     },
     {
      "id": "src-a0875eea1ed0b7d3",
      "title": "SALDRU, University of Cape Town (academic summary)",
      "url": "https://saldru.uct.ac.za/articles/2024-10-24-less-load-shedding-fewer-deaths",
      "publisher": {
       "name": null,
       "domain": "saldru.uct.ac.za",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "background",
      "claimRefs": [],
      "temporal": {
       "publishedAt": "2024-07-25",
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-07-26",
       "dossierCreatedAt": "2026-08-20",
       "retrievedAt": null,
       "status": "publication-and-record-dates-recorded"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Fetched. Author's home institution summarising the paper: synthetic control across the 2015, 2018 and 2019 mitigation episodes; Steenbras used to mitigate load shedding since June 2015 — the source for yearStart; 547 deaths averted, 95% CI 94-1,002; mitigation covered about 73% of the City's 65+ population; mortality data from the SA Medical Research Council, load-shedding data from the City and EskomSePush.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-98f735e96f1cf8a8",
      "title": "UNU-WIDER blog: A tale of two cities",
      "url": "https://www.wider.unu.edu/publication/tale-two-cities-can-electricity-supply-save-lives-without-deepening-divides",
      "publisher": {
       "name": null,
       "domain": "wider.unu.edu",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "background",
      "claimRefs": [],
      "temporal": {
       "publishedAt": "2023-05-25",
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-07-26",
       "dossierCreatedAt": "2026-08-20",
       "retrievedAt": null,
       "status": "publication-and-record-dates-recorded"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Fetched. Sole verified source for the 81% white / 27% black African split between protected and unprotected areas, and for the author's framing of it as a legacy of apartheid-era urban planning.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-930139edd154e798",
      "title": "Daily Maverick, 30 June 2022 (press)",
      "url": "https://www.dailymaverick.co.za/article/2022-06-30-how-the-city-of-cape-town-managed-to-avoid-stage-6-load-shedding-thanks-to-hydroelectric-scheme/",
      "publisher": {
       "name": null,
       "domain": "dailymaverick.co.za",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "background",
      "claimRefs": [],
      "temporal": {
       "publishedAt": "2022-06-30",
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-07-26",
       "dossierCreatedAt": "2026-08-20",
       "retrievedAt": null,
       "status": "publication-and-record-dates-recorded"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Fetched. 180 MW, four turbines, City owns and operates it, only South African city to do so; Stage 4 held while Eskom ran Stage 6 in June 2022; 514 hours or 21 days of one-stage protection January to May 2022 (City figures); analyst Chris Yelland on fast hydro ramping and on why other municipalities cannot copy it.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-7083a6479c9bc8e4",
      "title": "Engineering News, 18 April 2023 (trade press)",
      "url": "https://www.engineeringnews.co.za/article/city-of-cape-town-earmarks-r12bn-for-steenbras-peaker-plant-upkeep-2023-04-18",
      "publisher": {
       "name": null,
       "domain": "engineeringnews.co.za",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "background",
      "claimRefs": [],
      "temporal": {
       "publishedAt": "2023-04-18",
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-07-26",
       "dossierCreatedAt": "2026-08-20",
       "retrievedAt": null,
       "status": "publication-and-record-dates-recorded"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Fetched. R1bn refurbishment plus R200m maintenance over nine years; Energy MMC Beverley van Reenen on protecting 'a stage or two, where possible' and the plan to reach four stages. Note the capacity discrepancy: this source and most City statements say 160 MW (available output), the plant record says 180 MW nameplate.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-bee826797942e1b0",
      "title": "Daily Maverick / Bloomberg, 25 May 2023 (press)",
      "url": "https://www.dailymaverick.co.za/article/2023-05-25-cape-town-seeks-to-take-over-electricity-supply-from-south-africas-eskom/",
      "publisher": {
       "name": null,
       "domain": "dailymaverick.co.za",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "background",
      "claimRefs": [],
      "temporal": {
       "publishedAt": "2023-05-25",
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-07-26",
       "dossierCreatedAt": "2026-08-20",
       "retrievedAt": null,
       "status": "publication-and-record-dates-recorded"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Fetched. The 70/30 City-Eskom supply split; protection of about two stages applies to City-supplied zones only; Mayor Geordin Hill-Lewis, 'We want to supply the entire city'; the takeover talks Eskom later declined.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-647e5f0faf1bb6e8",
      "title": "Steenbras Power Station (plant record)",
      "url": "https://en.wikipedia.org/wiki/Steenbras_Power_Station",
      "publisher": {
       "name": null,
       "domain": "en.wikipedia.org",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "background",
      "claimRefs": [],
      "temporal": {
       "publishedAt": null,
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-07-26",
       "dossierCreatedAt": "2026-08-20",
       "retrievedAt": null,
       "status": "record-date-only"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Fetched. Used only for plant specification: 4 x 45 MW reversible turbines, 180 MW installed, commissioned 1979, owned and operated by the City of Cape Town Electricity Department. Low-authority source, cited only for specification, and its claim of being Africa's first pumped-storage scheme was NOT used — single weak citation.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-fdeac7b516cad688",
      "title": "Crown Publications, 21 May 2026 (trade press)",
      "url": "https://www.crown.co.za/latest-news/electricity-control-latest-news/36708-365-days-and-more-without-load-shedding",
      "publisher": {
       "name": null,
       "domain": "crown.co.za",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "background",
      "claimRefs": [],
      "temporal": {
       "publishedAt": "2026-05-21",
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-07-26",
       "dossierCreatedAt": "2026-08-20",
       "retrievedAt": null,
       "status": "publication-and-record-dates-recorded"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Fetched. Currency check: last national load-shedding 15 May 2025; at 00:01 on 16 May 2026 Eskom had gone one full year without it, the first since September 2018. Basis for status live but function dormant, outcome ongoing. Eskom's own milestone page returned HTTP 403 to automated fetching.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-4b3d0c53b3e3d2c6",
      "title": "City of Cape Town: How it works — City and Eskom electricity supply areas",
      "url": "https://www.capetown.gov.za/Media-and-news/How%20it%20works%20City%20and%20Eskom%20electricity%20supply%20areas",
      "publisher": {
       "name": null,
       "domain": "capetown.gov.za",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "background",
      "claimRefs": [],
      "temporal": {
       "publishedAt": null,
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-07-26",
       "dossierCreatedAt": "2026-08-20",
       "retrievedAt": null,
       "status": "record-date-only"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "FETCH FAILED — capetown.gov.za returned HTTP 502 to every automated request across three attempts, and its load-shedding FAQ PDF could not be parsed. Listed as the authoritative municipal statement of the supply split; every fact drawn from it here is instead carried by the independently fetched Bloomberg and UNU-WIDER sources.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     }
    ],
    "coverage": {
     "claimsTotal": 1,
     "claimsMapped": 1,
     "sourcesTotal": 9,
     "sourcesUsedByClaims": 1,
     "sourcesWithPublicationDate": 6,
     "sourcesWithArchive": 1,
     "sourcesWithExactLocator": 0,
     "sourcesWithContentHash": 0
    },
    "limits": [
     "Publisher names and source languages have not yet been classified; domains are recorded without guessing.",
     "Existing source notes are descriptive locators, not page- or paragraph-exact citations.",
     "A missing archive, publication date or content hash is shown as null rather than inferred.",
     "The project-level evidence grade ranks the strongest source in the entry; it is not a truth score for every claim."
    ]
   }
  },
  {
   "id": "2026-08-20-source-dates-2",
   "createdAt": "2026-08-20T19:29:52Z",
   "effectiveAt": "2026-07-26",
   "changeType": "update",
   "summary": "Record publication (and where stated, revision) dates for this entry's sources.",
   "preparedBy": {
    "type": "automation",
    "label": "AI-assisted evidence preparation",
    "humanApproved": false
   },
   "review": {
    "status": "unreviewed",
    "by": null,
    "date": null,
    "note": "Awaiting operator and domain-expert review; publication of this revision implies neither."
   },
   "changes": [
    {
     "operation": "replace",
     "path": "/snapshot/projectFingerprint",
     "summary": "Updated projectFingerprint to the current sourced project record."
    },
    {
     "operation": "replace",
     "path": "/snapshot/sources",
     "summary": "Updated sources to the current sourced project record."
    }
   ],
   "snapshotHash": "sha256:c68d89bcbaf27213b209de1c71300f024aa84ba41a1621414b4c4e034b7b3f45",
   "snapshot": {
    "asOf": "2026-07-26",
    "projectFingerprint": "sha256:5563d7fb8bcfb9b3356a85841f407986a4d249d32214d17ed988c2e041e40511",
    "assurance": {
     "status": "unreviewed",
     "scope": "evidence-passport-revision",
     "statement": "AI-assisted structural preparation. This revision has not been reviewed by a human or subject-matter expert.",
     "machineChecks": [
      "schema",
      "publication-diff-contract",
      "material-project-fingerprint",
      "claim-text-drift",
      "source-reference-resolution",
      "complete-source-dossier",
      "snapshot-hash"
     ]
    },
    "projectState": {
     "status": "live",
     "outcome": "ongoing",
     "evidenceGrade": "independent",
     "timeline": {
      "started": 2015,
      "ended": null
     }
    },
    "governance": {
     "operator": "City of Cape Town — Energy Directorate (Steenbras Hydro Pump Station)",
     "actorTypes": [
      "utility"
     ],
     "fundingModel": "public",
     "fundingDescription": "City of Cape Town capital budget",
     "cost": "≈R1.2bn budgeted in 2023 for Steenbras: about R1bn refurbishment and expansion plus about R200m maintenance over nine years",
     "ownership": null,
     "decisionRights": null,
     "exitConditions": null
    },
    "claims": [
     {
      "id": "clm-8894b8478e746133",
      "field": "impact",
      "text": "about 547 premature deaths averted among City-supplied residents aged 65 and over, 2015-2019, 95% confidence interval 94 to 1,002",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-da8ca68a8bf269c3"
      ],
      "supportNote": "The estimate comes from Joshua Budlender's stacked synthetic-control working paper UNU-WIDER 2024-44.",
      "caveat": "The author stresses the estimate is imprecise, and the same study finds the protected areas hold 81% of the city's white residents against 27% of its black African residents.",
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     }
    ],
    "sources": [
     {
      "id": "src-da8ca68a8bf269c3",
      "title": "UNU-WIDER: Surviving in the Dark (WP2024-44)",
      "url": "https://www.wider.unu.edu/publication/surviving-dark-mortality-effects-reducing-rolling-blackouts",
      "publisher": {
       "name": null,
       "domain": "wider.unu.edu",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-8894b8478e746133"
      ],
      "temporal": {
       "publishedAt": null,
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-07-26",
       "dossierCreatedAt": "2026-08-20",
       "retrievedAt": null,
       "status": "record-date-only"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Fetched. Joshua Budlender, July 2024. Abstract: 'the introduction of a unique load shedding reduction policy in parts of South Africa's second-largest city'. Confirms the policy statistically significantly reduces mortality and that 'the incomplete geographic coverage of the mitigation policy entrenches existing inequalities in the city'. The page states explicitly that this is a working paper, not peer-reviewed — hence evidence graded independent, not peer-reviewed.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": "https://web.archive.org/web/20260325021601/https://www.wider.unu.edu/publication/surviving-dark-mortality-effects-reducing-rolling-blackouts",
       "archivedAt": "2026-03-25",
       "contentHash": null,
       "status": "archive-linked"
      }
     },
     {
      "id": "src-a0875eea1ed0b7d3",
      "title": "SALDRU, University of Cape Town (academic summary)",
      "url": "https://saldru.uct.ac.za/articles/2024-10-24-less-load-shedding-fewer-deaths",
      "publisher": {
       "name": null,
       "domain": "saldru.uct.ac.za",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "background",
      "claimRefs": [],
      "temporal": {
       "publishedAt": "2024-07-25",
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-07-26",
       "dossierCreatedAt": "2026-08-20",
       "retrievedAt": null,
       "status": "publication-and-record-dates-recorded"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Fetched. Author's home institution summarising the paper: synthetic control across the 2015, 2018 and 2019 mitigation episodes; Steenbras used to mitigate load shedding since June 2015 — the source for yearStart; 547 deaths averted, 95% CI 94-1,002; mitigation covered about 73% of the City's 65+ population; mortality data from the SA Medical Research Council, load-shedding data from the City and EskomSePush.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-98f735e96f1cf8a8",
      "title": "UNU-WIDER blog: A tale of two cities",
      "url": "https://www.wider.unu.edu/publication/tale-two-cities-can-electricity-supply-save-lives-without-deepening-divides",
      "publisher": {
       "name": null,
       "domain": "wider.unu.edu",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "background",
      "claimRefs": [],
      "temporal": {
       "publishedAt": "2023-05-25",
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-07-26",
       "dossierCreatedAt": "2026-08-20",
       "retrievedAt": null,
       "status": "publication-and-record-dates-recorded"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Fetched. Sole verified source for the 81% white / 27% black African split between protected and unprotected areas, and for the author's framing of it as a legacy of apartheid-era urban planning.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-930139edd154e798",
      "title": "Daily Maverick, 30 June 2022 (press)",
      "url": "https://www.dailymaverick.co.za/article/2022-06-30-how-the-city-of-cape-town-managed-to-avoid-stage-6-load-shedding-thanks-to-hydroelectric-scheme/",
      "publisher": {
       "name": null,
       "domain": "dailymaverick.co.za",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "background",
      "claimRefs": [],
      "temporal": {
       "publishedAt": "2022-06-30",
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-07-26",
       "dossierCreatedAt": "2026-08-20",
       "retrievedAt": null,
       "status": "publication-and-record-dates-recorded"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Fetched. 180 MW, four turbines, City owns and operates it, only South African city to do so; Stage 4 held while Eskom ran Stage 6 in June 2022; 514 hours or 21 days of one-stage protection January to May 2022 (City figures); analyst Chris Yelland on fast hydro ramping and on why other municipalities cannot copy it.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-7083a6479c9bc8e4",
      "title": "Engineering News, 18 April 2023 (trade press)",
      "url": "https://www.engineeringnews.co.za/article/city-of-cape-town-earmarks-r12bn-for-steenbras-peaker-plant-upkeep-2023-04-18",
      "publisher": {
       "name": null,
       "domain": "engineeringnews.co.za",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "background",
      "claimRefs": [],
      "temporal": {
       "publishedAt": "2023-04-18",
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-07-26",
       "dossierCreatedAt": "2026-08-20",
       "retrievedAt": null,
       "status": "publication-and-record-dates-recorded"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Fetched. R1bn refurbishment plus R200m maintenance over nine years; Energy MMC Beverley van Reenen on protecting 'a stage or two, where possible' and the plan to reach four stages. Note the capacity discrepancy: this source and most City statements say 160 MW (available output), the plant record says 180 MW nameplate.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-bee826797942e1b0",
      "title": "Daily Maverick / Bloomberg, 25 May 2023 (press)",
      "url": "https://www.dailymaverick.co.za/article/2023-05-25-cape-town-seeks-to-take-over-electricity-supply-from-south-africas-eskom/",
      "publisher": {
       "name": null,
       "domain": "dailymaverick.co.za",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "background",
      "claimRefs": [],
      "temporal": {
       "publishedAt": "2023-05-25",
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-07-26",
       "dossierCreatedAt": "2026-08-20",
       "retrievedAt": null,
       "status": "publication-and-record-dates-recorded"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Fetched. The 70/30 City-Eskom supply split; protection of about two stages applies to City-supplied zones only; Mayor Geordin Hill-Lewis, 'We want to supply the entire city'; the takeover talks Eskom later declined.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-647e5f0faf1bb6e8",
      "title": "Steenbras Power Station (plant record)",
      "url": "https://en.wikipedia.org/wiki/Steenbras_Power_Station",
      "publisher": {
       "name": null,
       "domain": "en.wikipedia.org",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "background",
      "claimRefs": [],
      "temporal": {
       "publishedAt": null,
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-07-26",
       "dossierCreatedAt": "2026-08-20",
       "retrievedAt": null,
       "status": "record-date-only"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Fetched. Used only for plant specification: 4 x 45 MW reversible turbines, 180 MW installed, commissioned 1979, owned and operated by the City of Cape Town Electricity Department. Low-authority source, cited only for specification, and its claim of being Africa's first pumped-storage scheme was NOT used — single weak citation.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-fdeac7b516cad688",
      "title": "Crown Publications, 21 May 2026 (trade press)",
      "url": "https://www.crown.co.za/latest-news/electricity-control-latest-news/36708-365-days-and-more-without-load-shedding",
      "publisher": {
       "name": null,
       "domain": "crown.co.za",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "background",
      "claimRefs": [],
      "temporal": {
       "publishedAt": "2026-05-21",
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-07-26",
       "dossierCreatedAt": "2026-08-20",
       "retrievedAt": null,
       "status": "publication-and-record-dates-recorded"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Fetched. Currency check: last national load-shedding 15 May 2025; at 00:01 on 16 May 2026 Eskom had gone one full year without it, the first since September 2018. Basis for status live but function dormant, outcome ongoing. Eskom's own milestone page returned HTTP 403 to automated fetching.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-4b3d0c53b3e3d2c6",
      "title": "City of Cape Town: How it works — City and Eskom electricity supply areas",
      "url": "https://www.capetown.gov.za/Media-and-news/How%20it%20works%20City%20and%20Eskom%20electricity%20supply%20areas",
      "publisher": {
       "name": null,
       "domain": "capetown.gov.za",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "background",
      "claimRefs": [],
      "temporal": {
       "publishedAt": "2022-11-01",
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-07-26",
       "dossierCreatedAt": "2026-08-20",
       "retrievedAt": null,
       "status": "publication-and-record-dates-recorded"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "FETCH FAILED — capetown.gov.za returned HTTP 502 to every automated request across three attempts, and its load-shedding FAQ PDF could not be parsed. Listed as the authoritative municipal statement of the supply split; every fact drawn from it here is instead carried by the independently fetched Bloomberg and UNU-WIDER sources.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     }
    ],
    "coverage": {
     "claimsTotal": 1,
     "claimsMapped": 1,
     "sourcesTotal": 9,
     "sourcesUsedByClaims": 1,
     "sourcesWithPublicationDate": 7,
     "sourcesWithArchive": 1,
     "sourcesWithExactLocator": 0,
     "sourcesWithContentHash": 0
    },
    "limits": [
     "Publisher names and source languages have not yet been classified; domains are recorded without guessing.",
     "Existing source notes are descriptive locators, not page- or paragraph-exact citations.",
     "A missing archive, publication date or content hash is shown as null rather than inferred.",
     "The project-level evidence grade ranks the strongest source in the entry; it is not a truth score for every claim."
    ]
   }
  }
 ]
}