Argentina handed its 1913 metro to the city in 2012
Permanent project revision
Revision 2026-09-27-popular-uplift · effective 2026-09-27
Current revision. This is the snapshot used by the live entity page.
Popular-entry uplift: sources re-read and dated, full claim array, stale or unsupported passages corrected against the sources, and the 2026 status checked.
sha256:015950dba3e30e85aaed4ea9007b9a456a1e19e40927d40489577f7b7460ef06
replace /snapshot/projectFingerprint — Updated projectFingerprint to the current sourced project record.replace /snapshot/asOf — Updated asOf to the current sourced project record.replace /snapshot/claims — Updated claims to the current sourced project record.replace /snapshot/sources — Updated sources to the current sourced project record.The text below is copied verbatim from the published record. Each claim names the source dossiers that carry it; caveats stay attached to the claim they qualify.
clm-b63266183af253d9
quantitative
Argentina handed its 1913 metro to the city in 2012
clm-e5f61a65494e3645
quantitative
the city agency SBASE has since put Siemens Trainguard MT CBTC on three of six lines — H in 2016, C in 2020, D in 2024
clm-e8743cf5b9dc2b57
quantitative
in August 2026 awarded Line B's resignalling to China's CRRC, again at GoA2
clm-078334afebcb3aae
quantitative
It runs attended automatic train operation at GoA2: the driver stays in the cab and presses to depart
clm-41ab108b03eec2db
descriptive
no Subte line is driverless or certified to be
clm-69c78697374174f4
descriptive
Two round-the-clock control rooms track train positions alongside traction power, ventilation and pumping
clm-6bb446f3160ca55a
descriptive
SBASE publishes a static GTFS feed and the city a real-time transit API
clm-2cb9493b90c29304
descriptive
the city's open-data portal now lists every GTFS and API dataset as suspended for review
clm-f89b0c45f47fd408
quantitative
A city audit found the Line D programme finished one of three planned stages, five months late, reaching a 3-minute headway but not the promised 2:15 — there are not enough trains
clm-cddfb73cef46fd18
quantitative
Ridership has not recovered either: an estimated 199.1 million trips in 2024
clm-a19f31b4f9ed3895
quantitative
Line D reached a 3-minute headway after resignalling, but the promised 2 minutes 15 seconds could not be verified in practice for lack of rolling stock, and one of three planned stages was completed, five months late
clm-f8022cc0652fa23a
quantitative
findings of an Auditoría General de la Ciudad report on the Line D works, reported April 2026
clm-bbcba6cf91ee2509
descriptive
Signalling sets the floor on headway; the fleet sets the actual service.
clm-23c98f7d8d417c63
quantitative
Buenos Aires bought the capacity to run a train every 2:15 and still runs one every 3.
This layer records what is known about each source, what is still missing, and the exact snapshot this page is rendering. A missing date, archive or hash stays visible as missing.
Awaiting operator and domain-expert review; publication of this revision implies neither.
sha256:015950dba3e30e85aaed4ea9007b9a456a1e19e40927d40489577f7b7460ef06
src-11e5f5063586b54dThe load-bearing automation sentence: SBASE selected Siemens Mobility for CBTC on Line D, "with the CBTC supporting attended ATO to Grade of Automation 2". Also dates Trainguard MT on Line H to mid-2016 and its commissioning on Line C to February, and says it replaces an Alstom ATP in use since 2008, coordinated by a newly established operations control centre.
src-09db5a752fa1950fSupplier confirmation of the contract award date. Fetched and read: it states no contract value and no automation grade, and does not mention lines H or C — so it corroborates the award only, not the GoA2 claim.
src-d6b1975dd46f9423Trade press describing what GoA2 means in the cab: the driver presses a button and the train accelerates automatically to the next stop, and "can take control of the formation's operation at any moment". Dates the Line C reopening to 3 February 2020, replacing signalling in service since 1934, and states the 2:15 headway target depends on buying more trains — the line then had 13.
src-3ee120497a6cb72bThree months after the Line D cutover: Siemens was still updating software for line-specific behaviour, causing speed restrictions at platforms and station approaches; the Alstom 100 units — about a third of the fleet — could not run until calibration finished; journey times up 25%. "La línea funciona con menos trenes que antes."
src-1d37db47cf878087Carries the impact figures from an Auditoría General de la Ciudad report: the signalling project "contemplaba tres etapas, pero solo una se completó (con cinco meses de atraso)"; the completed phase enabled a 3-minute frequency while the promised 2:15 cannot be verified because "falta material rodante suficiente"; works advanced "sin un plan de trabajo aprobado para su etapa final". FETCH FAILURE, flagged: the AGCBA report PDF itself returned unreadable binary to automated fetching, so these audit findings are verified at press level, not against the primary document. The 48.11% cost increase and nine-month extension in the same audit belong to the Palermo and Scalabrini Ortiz station works, not to the signalling, and are deliberately excluded here.
src-2b0548d490e8414fSecond outlet independently confirming that the Auditoría General de la Ciudad report on the Line D works exists and its supervision findings — SBASE assigned a single works director without a full technical team or inspection plan.
src-29ed425464af202aOperator/authority description of the Puesto Central de Operaciones: two centres, one for lines A–E and one for line H, 26 staff, running "las 24 horas, los 365 días del año", monitoring train positions and signalling plus power, ventilation and pumping systems. No performance data is published from it — the entry claims none.
src-bbddec0b269cde5bStatic GTFS for the Subte, publisher Subterráneos de Buenos Aires (SBASE), licence CC-BY-2.5-AR. Checked 26 July 2026: the page carried the notice "Se informa a los usuarios de BA DATA que todos los datasets con Formato API y GTFS, están suspendidos. Se encuentran en revisión y corrección", with no date given.
src-45839c2963435014The real-time layer: for subte it provides static GTFS, forecastGTFS (trips currently running) and service alerts, licence CC-BY-2.5-AR, published by the Secretaría de Transporte y Obras Públicas; the portal states the API is used by Google and Moovit and is open to any developer on registration. Carries the same suspension notice as the GTFS dataset.
src-f4f7798b7d29be36Independent NGO report, drawing on the Centro de Estudios Metropolitanos and official statistics: 199,116,074 passengers in 2024, and March 2025 at "apenas el 54% de los pasajeros de marzo de 2019". Two different 2019 annual totals circulate (about 325 and about 341 million) and neither is used here. FETCH FAILURE, flagged: the official Instituto de Estadística y Censos series at estadisticaciudad.gob.ar looped on a host redirect and could not be read to settle the 2019 figure.
src-79ba5d51049b8c54Establishes the limit of the rollout: CBTC operates on lines C, D and H only, no installation has been announced for Line B, and the new Line B trains must suit the existing ATP while being "prepared for a possible conversion to CBTC with ATO in GoA2" — the city itself specifies GoA2 as the ceiling.
src-5fb5e0bf0ebfd8f7SBASE awarded Zhuzhou CRRC Times Electric, the CRRC unit building Line B's 29 new trains, a contract to replace Line B's ATP with CBTC at GoA2; CBTC to enter service 20 months after works start with 17 trains, full conversion at 34 months. Also dates CBTC on H (July 2016), C (February 2020) and D (March 2024), all Siemens Trainguard MT.
src-b5243fe702839ba4Official digest entry for Ley 4472: sanctioned 19 December 2012, published in the Boletín Oficial 28 December 2012. The law has the City assume the Subte public service and designates SBASE as the authority for infrastructure, maintenance and the operating control systems. Replaces the dead cedom.gov.ar URL. (Full text PDF: digesto.buenosaires.gob.ar/documento/download/Ley%20Ciudad-4472__958d201cd37ba4daaed819996f963099cc2ad0e6.pdf)
src-74f5dbc91f4bdb43The city announces that Emova Movilidad S.A., of the Benito Roggio Transporte group, takes over Subte and Premetro operation and maintenance on 1 December 2021 for 12 years, extendable by three, replacing a 20-year concession. Readable replacement for the Página/12 source.