clm-6ab0a5b3d3bbd14c
quantitative
Since April 2020
Permanent project revision
Revision 2026-08-21-evidence-baseline · effective 2026-08-02
Superseded. A later revision exists: 2026-08-21-unsourced-text-correction →
Created the first structured Evidence Passport with 13 claims and 3 source dossiers.
sha256:10341cc2ef7393f9658696b3f8cf09274045d110be3ad493017941ed4dc9bdb3
add /evidencePassport — Added claim-level evidence mapping and source dossiers.add /revisionHistory — Established a permanent, hash-addressed baseline revision.The text below is copied verbatim from the published record. Each claim names the source dossiers that carry it; caveats stay attached to the claim they qualify.
clm-6ab0a5b3d3bbd14c
quantitative
Since April 2020
clm-5e8d16205f26e7cf
quantitative
a subsidiary of the state-owned Chengdu City Investment Group, founded October 2019
clm-eb9d41e1cccd1d43
descriptive
has been replacing standalone streetlight poles, traffic-camera masts, signage and signal poles with combined 'smart multifunction poles'
clm-4da397ea1277c5c9
quantitative
carrying LED lighting, 5G small cells, traffic and environmental sensors, emergency call points, phone/EV charging and (as of a 2026 rollout) roadside charging piles
clm-be8f9adb4caedb87
quantitative
Over 3,500 poles were in place along corridors like Chengdu's First Ring Road, Phoenix Mountain Sports Park and East Suburb Memory
clm-3a242b03e2303604
quantitative
a stated plan to reach 30,000+ poles across the city within 3-5 years for roughly ¥1.5 billion
clm-21ba0836c24286ed
quantitative
a 99.38% monthly streetlight-uptime rate
clm-e34066b792905163
quantitative
about 40% energy savings from LED retrofits versus the old sodium lamps
clm-21ccf20c8c837eb9
descriptive
the poles installed so far mainly just replace old streetlights; the sensor and camera functions are described as 'reserved for future use' rather than fully active
clm-4637f66646c84966
quantitative
3,500+ multifunction poles installed against a 30,000-pole, ¥1.5 billion, 3-5 year target
clm-0de8779047400ff1
quantitative
99.38% monthly streetlight-activation rate
clm-66f439ce195abb34
quantitative
~40% energy savings vs. sodium lamps in the company's managed area (operator-reported)
clm-3e2b782cd06727c2
descriptive
Chengdu's own operator admits most of the smart hardware capacity is 'reserved,' not yet switched on
This layer records what is known about each source, what is still missing, and the exact snapshot this page is rendering. A missing date, archive or hash stays visible as missing.
Awaiting operator and domain-expert review; publication of this revision implies neither.
sha256:10341cc2ef7393f9658696b3f8cf09274045d110be3ad493017941ed4dc9bdb3
src-611c29648b9b47e0Company founding (Oct 2019), operations start (Apr 2020), pole functions, 3,500+ pole count, 30,000-pole/¥1.5bn/3-5yr plan, 99.38% uptime and ~40% energy-savings figures.
src-9ae836a06e01c399Independent corroboration of the 30,000-pole target and 2025 timeframe from a provincial state news outlet (title/summary verified via search; direct fetch returned a 404 on a later re-check).
src-bca0d4c5ebc97751Trade-press coverage cited in search results describing a separate, larger citywide LED streetlight retrofit (180,000 lights) with a claimed ~¥100M/year saving; flagged in reviewNote as a related but distinct claim not independently verified here.