clm-fd3e359264d5c561
quantitative
the first Nanjing metro line designed to GoA4, the highest automation grade
Permanent project revision
Revision 2026-08-21-unsourced-text-correction · effective 2026-08-06
Current revision. This is the snapshot used by the live entity page.
Removed or softened wording that no listed source carries, after reading every source while preparing the claim ledger. Only the year 2023 is sourced for the south section, CRRC states no car count per train, and its SIL4 statement covers the vehicles' onboard safety functions rather than the signalling system.
sha256:13cf01ab920a014296bc3e36943cacbb5cde7efb27865449d14aa3eafb07d477
replace /snapshot/projectFingerprint — Updated projectFingerprint to the current sourced project record.replace /snapshot/claims — Updated claims to the current sourced project record.replace /snapshot/sources — Updated sources to the current sourced project record.The text below is copied verbatim from the published record. Each claim names the source dossiers that carry it; caveats stay attached to the claim they qualify.
clm-fd3e359264d5c561
quantitative
the first Nanjing metro line designed to GoA4, the highest automation grade
clm-236563796a7aeb25
descriptive
trains wake themselves, leave the depot, run the line, berth, open and close doors and return to sleep on a timetable
clm-4fd1469fb3db90ea
quantitative
It opened in three sections — north on 28 December 2022
clm-de0fbab3856e9df6
quantitative
south in 2023
clm-96ccc2a5d4a95dcf
quantitative
centre on 28 December 2024
clm-44854b2de0ea792f
quantitative
completing a 35.49 km, 27-station line
clm-2e873269e83b930e
quantitative
CRRC Puzhen built 53 trainsets
clm-a44a515c966bcb5f
quantitative
certified to SIL4 for their onboard safety functions, with obstacle and derailment detection and active smoke detection
clm-7096ce117bfab43c
quantitative
The north section alone averaged 50,200 riders a day by the end of 2023
clm-1c4911b17876923e
quantitative
the line set a single-day record of 153,000 on 3 April 2024
clm-2936282d90c6b9bf
quantitative
from about 473 km and 226 stations to about 484 km and 234 stations
clm-87b3eaad6afab752
quantitative
across 13 lines
clm-70a4ba426fa6bd3e
descriptive
Every Nanjing and Jiangsu announcement says the trains 具备无须配置司机的能力 — have the capability to be run without a driver — which is a statement about the design, not about who is aboard
clm-37a833c06f31eb44
descriptive
Pre-opening reports said plainly that a driver would still ride and watch the console
clm-542d91fd236a7de3
descriptive
no accessible source names a date on which staff stopped riding
This layer records what is known about each source, what is still missing, and the exact snapshot this page is rendering. A missing date, archive or hash stays visible as missing.
Awaiting operator and domain-expert review; publication of this revision implies neither.
sha256:13cf01ab920a014296bc3e36943cacbb5cde7efb27865449d14aa3eafb07d477
src-4293e0ea0726e505Full-line opening, 29 Dec 2024. Carries the careful wording: 『作为江苏省首条全自动无人驾驶列车线路』 and 『具备无须配置司机、完全自动化运行的能力』 — capability, not practice. Also 『12月28日13时30分…全线实现贯通运营』, 『7号线全线长约35.5公里』, 『设27个车站』, 『南京地铁运营总里程由近473公里增加至近484公里』.
src-76db3d459f766e7026 Dec 2024. Source for the length 『全长35.49公里』, 『全线27个车站』 and the ridership figures: 『截至2023年底,北段的日均客流量已经达到5.02万人次。今年4月3日,7号线(南段+北段)更是创下了15.3万人次的单日最高客运量』. Repeats the same capability wording.
src-e69476f1897b14d316 Jan 2025. Builder's own account: 53 trainsets, B-type, 80 km/h, SIL4 to EN50128/EN50129, automatic fault self-recovery, obstacle and derailment detection, active smoke detection, 50-minute fire-rated cabinets. Operator-grade evidence, used only for the hardware description.
src-2ea70905767e1819Pre-construction report on the Line 7 feasibility review. The passage that matters for the driverless test: 『很多乘客以为,既然列车全自动了,列车上就没有司机了…其实真相是,地铁列车上仍然还有司机,不过司机从繁忙的工作中彻底解放出来了,专注于监测地铁列车的正常运行』 — there is still a driver aboard, watching the console.
src-4ddabd7d8463f7f224 Apr 2018, construction start. 『这条线路将实现真正意义的"无人驾驶",司机只需在驾驶室监控列车运行』 — the driver only monitors. Note the sources disagree on whether there is a cab at all: this 2018 piece says 驾驶室, while the delivered trains have an open console. Neither states when, or whether, staff stopped riding.