clm-ea2a39dff523a72f
quantitative
opened on 8 November 2010
Permanent project revision
Revision 2026-08-27-claims-and-sources · effective 2026-08-02
Superseded. A later revision exists: 2026-08-27-source-dating →
Created the first structured Evidence Passport with 18 claims and 7 source dossiers.
sha256:86ada18510229e54b21ad597da4ddc937bcc55b619a2c53de8b54d96fa687716
add /evidencePassport — Added claim-level evidence mapping and source dossiers.add /revisionHistory — Established a permanent, hash-addressed baseline revision.The text below is copied verbatim from the published record. Each claim names the source dossiers that carry it; caveats stay attached to the claim they qualify.
clm-ea2a39dff523a72f
quantitative
opened on 8 November 2010
clm-e4e2038d32bffbd0
quantitative
about 4km of tunnel from Linhexi through the Zhujiang New Town CBD to Canton Tower
clm-f432dcfb363a71f5
descriptive
nine underground stations
clm-4162dcea1adc49e2
descriptive
rubber-tyred Bombardier trains
clm-33ed47b0264c045d
quantitative
running without a driver under the CityFlo 650 signalling system at the highest automation grade
clm-1358f7d77f25e565
quantitative
It spent its first year as a sightseeing trial that stopped running at 20:00
clm-3a9aba7db2071991
quantitative
the operator put average daily ridership at opening at about 8,000
clm-f73fd2b10650a29c
quantitative
in January 2011 a reporter counting one afternoon rode a train carrying 26 passengers against a design capacity of 276
clm-d7f77f39909d0ef6
quantitative
About 7,000 riders a day in January 2011 — 14% of the 50,000 a day the metro company had forecast for 2010 and 2011
clm-29a743ad7ee97b14
quantitative
By July 2014 it was 29,034 a day, still under 60% of that forecast though 21.68% up on the year before
clm-67322c5621cf81ee
quantitative
not one APM station had had to hold passengers back that year, while Line 3 alongside ran at 138.61% of capacity in the morning peak
clm-d92bba364e22b0d6
quantitative
The forecast was met in 2018, at 49,000 riders a day, eight years after opening
clm-12f83c3331928f08
quantitative
a complaint alleged that platforms narrower than 2.5m, stations with a single street entrance and stations without escalators breached the national metro design code
clm-445e5b82a5b51f90
quantitative
a reporter who went and measured found a side platform of about 1.7m at Tianhe South
clm-5b8a368cea918352
quantitative
Guangzhou Metro answered that the code does not apply to the APM, because a rubber-tyred guideway carrying 10,000 passengers an hour is far below the standard of 30,000 an hour and up that the code was written for
clm-a367abba6ce994e7
descriptive
did not say which code does apply
clm-7e898b47c223ebd2
descriptive
the line was built to take three-car trains and was given two-car sets because early ridership was low
clm-7bdbb649d8f23c83
quantitative
by 2023 the operator was commissioning a study to buy more vehicles, because capacity was about to run short and some equipment was reaching the end of its design life
This layer records what is known about each source, what is still missing, and the exact snapshot this page is rendering. A missing date, archive or hash stays visible as missing.
Awaiting operator and domain-expert review; publication of this revision implies neither.
Erratum on this revision's envelope. The snapshot, its hash and its permanent link are untouched.
sha256:86ada18510229e54b21ad597da4ddc937bcc55b619a2c53de8b54d96fa687716
src-2688f802dcf8c58fOpening date (8 November 2010), operator, nine underground stations, rubber-tyred Bombardier Innovia APM 100 rolling stock, flat 2-yuan fare.
src-bf59fc7cdbdfc683Academic paper on urban-rail full-automation (FAO) systems confirming the Zhujiang New Town APM adopted Bombardier's Cityflo 650 CBTC at GoA4 in November 2010.
src-b4feee5cc5db23b8Average daily ridership of 7,000, against the metro company forecast of 50,000 a day for 2010 and 2011; a counted train carrying 26 passengers against a design capacity of 276; the entrances, the 20:00 close and the separate fare as the reasons riders gave.
src-1c4c4954c4b4ab1eComplaint that platform widths, entrance counts and missing escalators breach the national metro design code; the reporter's own measurements; Guangzhou Metro's reply that the code does not apply because the line's one-way capacity is 10,000 passengers an hour.
src-e7e213de14dc2f4fEnd of the one-year sightseeing trial period; operating hours extended to 23:00 after earlier steps from 20:00; average daily ridership at opening of about 8,000; a single-day record of 62,000 on 1 October 2011.
src-694d22ac8aa3978cMetro-company ridership data for July 2014: 29,034 a day on the APM, under 60% of the forecast, 21.68% up year on year; no APM station had needed passenger-flow control that year; Line 3 alongside at 138.61% of capacity in the morning peak.
src-dcffd46ef62dcb69Line about 4km long; ridership reached the initial forecast of 50,000 a day in 2018 at 49,000; the line was built to three-car capacity but equipped with two-car trains; 2023 tender for a vehicle-procurement study, citing looming capacity shortfall and equipment reaching the end of its design life.