clm-76f1e7f8eaa76cc2
quantitative
TransMilenio opened in December 2000 under mayor Enrique Peñalosa
Permanent project revision
Revision 2026-10-04-search-uplift · effective 2026-10-04
Current revision. This is the snapshot used by the live entity page.
Search-visibility uplift: sources re-read and dated, full claim array, stale or unsupported passages corrected against the sources, and the 2026 status checked.
sha256:63849b6ed590c9ca3ef2113b9f788d58250368ae1728467755bc5199d853d2e3
replace /snapshot/projectFingerprint — Updated projectFingerprint to the current sourced project record.replace /snapshot/asOf — Updated asOf to the current sourced project record.replace /snapshot/claims — Updated claims to the current sourced project record.replace /snapshot/sources — Updated sources to the current sourced project record.The text below is copied verbatim from the published record. Each claim names the source dossiers that carry it; caveats stay attached to the claim they qualify.
clm-76f1e7f8eaa76cc2
quantitative
TransMilenio opened in December 2000 under mayor Enrique Peñalosa
clm-935dbe5def05c76f
descriptive
pre-paid stations, level boarding
clm-e31c09b5d10e3268
descriptive
a model that later systems, Mexico City's Metrobús among them, were built on
clm-fd1e6df017ca522c
quantitative
one fare card shared with the city's other buses, TuLlave, replaced TransMilenio's own contactless cards station by station from September to December 2015
clm-68c0344cff9241b1
quantitative
the fleet-control system began a phased renewal in January 2024
clm-68425028c48e5976
quantitative
a single control centre for operations & security opened in March 2026, the first time in the system's history that operations and security worked from one place
clm-90d364791196d404
descriptive
TransMilenio S.A., the district company, is also the managing entity for Bogotá's wider SITP bus network and TransMiCable
clm-5234f2d35be8b0e4
descriptive
it publishes its static GTFS timetable feed with no licence attached
clm-55fc414f32109cd6
quantitative
Paying at the turnstile with a contactless bank card or phone has been piloted since January 2025
clm-3b721322ab5c3aad
quantitative
ran at two stations in January 2026, without TuLlave's free transfers
clm-1a5a51a7eb322b2a
quantitative
The TransMilenio trunk on Carrera Séptima, revoked in 2020, is still unbuilt
clm-abadc54a121776e6
quantitative
the metro Peñalosa shelved to pay for the busway is now more than 80% complete
clm-bdde448d5e216f47
quantitative
A peer-reviewed measurement put throughput on the busiest trunk section at about 43,000 passengers per hour per direction, with a practical ceiling near 48,000 at 150 passengers per bus
clm-80d53fa16f108d8f
quantitative
Trunk fare evasion fell from 29.6% in 2022 to 13.1% in 2024 on figures cited in a Bogotá council debate
clm-2d97331136506c09
quantitative
with losses still above COP 100 billion per half-year
clm-9e777e862aeab409
quantitative
TransMilenio figures a councillor published in February 2026 put trunk evasion at 13% and its 2025 cost at about COP 265 billion
clm-5d95ccc334a91f1e
descriptive
Concrete, prepaid stations and level boarding delivered metro-scale throughput
clm-d0996652c00670e7
quantitative
unified ticketing arrived only in 2015
clm-e37a4aef307f8897
quantitative
an integrated control centre only in 2026
clm-f3c31e73d60cbb02
descriptive
crowding, fare evasion and riots
This layer records what is known about each source, what is still missing, and the exact snapshot this page is rendering. A missing date, archive or hash stays visible as missing.
Awaiting operator and domain-expert review; publication of this revision implies neither.
sha256:63849b6ed590c9ca3ef2113b9f788d58250368ae1728467755bc5199d853d2e3
src-dedf596ab6b98a2eVol. 39(1):139-142. Abstract states 'actual throughput of 43,000 passengers hourly per direction with average bus occupancy of 150 passengers' and a practical capacity of '48,000 passengers per hour per direction with its existing infrastructure and 150 passengers per bus' (35,000 at 110 passengers per bus). Sole basis for the capacity figures; the entry attributes them rather than claiming any world record. Note the lead author was closely associated with the system's evaluation literature.
src-5d1e1e177c640c59Vol. 116(2):418-63. Establishes that an independent economic evaluation exists and that conventional commute-time benefit calculations capture only about half the total welfare gain, with 'distributional impacts are modest'. No single headline number is quoted in the entry because the paper's results are model-based.
src-6d471ed210573b44Fetched successfully. Establishes the control centre is new, not original: 1,200 m2, 209 workstations, the first time in the system's 25-year history that operations and security run from one location; supervises up to 4 million daily trips and more than 10,700 buses; roughly 2,700 fixed cameras plus over 36,900 onboard; AI video analytics and onboard GPS; more than 40 million data records processed per day; coordinates Troncal, TransMiZonal and TransMiCable — the evidence that TransMilenio S.A.'s remit extends beyond the BRT.
src-380e662f75e765ebStatic GTFS file 'GTFS Estáticos 2025-07-23' on the operator's open-data portal, described as the GTFS dataset for TransMilenio S.A.'s SITP operation; the item states no licence or terms of use.
src-1a330612403d29d4Operator notice: from the night of 3 January 2024 a gradual renewal and modernisation of the fleet-control system, which manages the trunk and dual fleet in real time, with on-board updates across the trunk and zonal fleet.
src-13dc2073a370190dEncyclopedia article on the TuLlave card: collection concession of 2011; the card launched with the SITP in January 2012; payment on all TransMilenio stations unified onto TuLlave from 2 September to 21 December 2015, replacing the contactless cards an earlier contractor had introduced.
src-5b2eb57acebef8bcFetched successfully. Carrying sentence: 'La evasión en el componente troncal de TransMilenio pasó de 29,6 % en 2022 a 13,1% en 2024', and 'La evasión sigue generando pérdidas superiores a $100.000 millones de pesos por semestre'. The article attributes the figures to councillors Cristina Calderón Restrepo and María Clara Name in a Bogotá council debate, not to a TransMilenio publication — so these are council-cited, not audited, numbers.
src-cd7b1024b46b38bf9 March 2012: blockades at all portales, stations damaged on Caracas (Calles 39, 45, 72 and Marly), Calle 80 and Las Américas; Marly station destroyed and looted; 28 detained; the Procuraduría General de la Nación named overcrowding and fare increases as triggers. Corroborated by NBC News, 'Police and protesters clash over public transportation in Bogota' (https://www.nbcnews.com/news/world/police-protesters-clash-over-public-transportation-bogota-flna391240). Not fetched directly; established via search index.
src-aa2290f507a24198Fetched successfully. Academic critique of the contracting model: 388 km of exclusive bus lanes planned against 109 km completed by 2014; operators paid per kilometre run regardless of service quality; fares among the highest in Latin America relative to the minimum wage (11.6% vs 5.4% in Quito). Its further figures (2015 deficit, share of the fare going to operators, a 96% rise in accidents after a bus life-extension decision) are deliberately NOT carried in the entry — single-source and not independently corroborated.
src-71e8d5b54b527c36Mayor Claudia López revoked the tender for the TransMilenio trunk on Carrera Séptima by administrative act, replacing it with a multimodal 'Corredor Verde'; Semana then reports the District revoking the Corredor Verde tender in turn (https://www.semana.com/politica/articulo/distrito-destapa-las-cartas-del-futuro-de-la-carrera-septima-en-bogota-tras-revocar-licitacion-del-corredor-verde-de-claudia-lopez/202431/). Together they establish that the corridor is still unbuilt. Neither fetched directly; established via search index.
src-b7918ba33a4e806cLine 1 at 80.37% overall progress as of 30 June 2026 along a 24 km viaduct; trial running without passengers is scheduled to start in September 2027.
src-2e6a65c5ef0b4d47Operator page: TRANSMILENIO S.A., a District entity, is the managing entity of the SITP and responsible for its operation.
src-c6f69d87902f3773General manager María Fernanda Ortiz: the District subsidises 50% of the TransMilenio fare, set at COP 3,550 for 2026. Sole basis for the funding field. Not fetched directly; established via search index headline and summary.
src-1100dee469973871Encyclopedia article: opened to the public in December 2000; Mayor Enrique Peñalosa cancelled plans for elevated highways and a subway and oversaw the initial system; other cities, including Mexico City's Metrobús, adopted systems modelled on it.
src-f45d6b057aa9669fTransMilenio's general manager launched a pilot for paying the fare with Visa and Mastercard debit and credit cards at Portal Norte stations, running until April; it does not apply to transfers.
src-737ad2923f535471Open payment with contactless Visa and Mastercard cards, phones or watches is enabled at Portal Norte – Unicervantes and El Tiempo – Cámara de Comercio stations; TuLlave benefits such as free transfers remain exclusive to the card.
src-af38887686fab628Councillor Samir Abisambra published data supplied by TransMilenio: fare evasion at 13% and a 2025 cost of COP 265,048,729,898 on the trunk component; metro works forced the removal of automatic doors and access control that had reduced evasion.