TransMilenio: Bogotá's BRT Trunk Network & Its Late Control Layer

🤖 AI-generated summary · ◆ 1 sourced claim · 🔎 Last verified

This overview was generated with AI from the public sources listed below and checked against them before publication. It has not had a complete human fact-check — treat it as a starting point and follow the sources.

1 sourced claim on this page, none individually verified yet — turn on “Sources in the text” to see each one.

How this atlas is made · What “last verified” means · What “source-checked” means · The full record behind this page

The buses ran from December 2000. A contactless card reached every station only in September 2015, and a single control centre opened in March 2026, twenty-five years after the first bus.

Evidence🔬 Peer-reviewed
what does this mean?The strongest source behind this entry is an independent peer-reviewed or academic study. It grades who did the looking — not how well the project went. All four grades →
Scale🏙️ City-wide
FundingFares plus a district subsidy — TransMilenio's general manager says the District covers about half the fare, set at COP 3,550 for 2026; infrastructure is publicly built, while buses and fare collection are run by private concessionaires.

Part of 1001 Smart Cities — 1,167 documented projects · 🏙️ 12 more in Bogotá · 🚌 Public transport guide · 🚲 Mobility projects

TransMilenio opened in December 2000 under mayor Enrique Peñalosa — articulated buses in dedicated median lanes, enclosed pre-paid stations, level boarding — the template that BRT systems from Mexico City to Dakar were measured against. The data layer came later and in pieces: the Tullave contactless card reached every TransMilenio station only in September 2015, the GPS fleet-control system began a phased renewal in 2024, and a single control centre for operations & security opened in March 2026, twenty-five years after the first bus. TransMilenio S.A., the district company, is also the managing entity for Bogotá's wider SITP bus network and TransMiCable, and it publishes static and real-time GTFS feeds with no licence attached. The Carrera Séptima trunk promised for decades is still unbuilt, and the metro Peñalosa shelved to pay for the busway is now more than 80% complete.

Live 📅 since 2000

📊 Impact

A peer-reviewed measurement put throughput on the busiest trunk section at about 43,000 passengers per hour per direction, with a practical ceiling near 48,000 at 150 passengers per bus (Hidalgo, Lleras & Hernández, Research in Transportation Economics, 2013). Trunk fare evasion fell from 29.6% in 2022 to 13.1% in 2024 on figures cited in a Bogotá council debate, with losses still above COP 100 billion per half-year; a February 2026 council item put the 2025 cost above COP 265 billion.

🎓 Lesson

Bogotá built the corridor first and the control room last. Concrete, prepaid stations and level boarding delivered metro-scale throughput within two years; unified ticketing arrived after fifteen, an integrated control centre after twenty-five — by which time crowding, fare evasion and riots had already set the system's public reputation. Throughput is not the same as legitimacy.

Sources

↗ Hidalgo, Lleras & Hernández — capacity measurement (Research in Transportation Economics, 2013, peer-reviewed)Published 2013 archived copyVol. 39(1):139-142. Abstract states 'actual throughput of 43,000 passengers hourly per direction with average bus occupancy of 150 passengers' and a practical capacity of '48,000 passengers per hour per direction with its existing infrastructure and 150 passengers per bus' (35,000 at 110 passengers per bus). Sole basis for the capacity figures; the entry attributes them rather than claiming any world record. Note the lead author was closely associated with the system's evaluation literature.
↗ Tsivanidis — welfare evaluation (American Economic Review, 2026, peer-reviewed)Published February 2026Vol. 116(2):418-63. Establishes that an independent economic evaluation exists and that conventional commute-time benefit calculations capture only about half the total welfare gain, with 'distributional impacts are modest'. No single headline number is quoted in the entry because the paper's results are model-based.
↗ Alcaldía de Bogotá — Integrated Control Centre opens (17 March 2026)Fetched successfully. Establishes the control centre is new, not original: 1,200 m2, 209 workstations, the first time in the system's 25-year history that operations and security run from one location; supervises up to 4 million daily trips and more than 10,700 buses; roughly 2,700 fixed cameras plus over 36,900 onboard; AI video analytics and onboard GPS; more than 40 million data records processed per day; coordinates Troncal, TransMiZonal and TransMiCable — the evidence that TransMilenio S.A.'s remit extends beyond the BRT.
↗ TransMilenio — GTFS-realtime feed page (operator)Fetched successfully. Lists three GTFS-realtime endpoints (vehiclepos.pb, serviceAlerts.pb, tripupdate.pb). Carries no licence or terms-of-use statement of any kind — the basis for 'no licence attached' in the snippet.
↗ TransMilenio open data portal — static GTFS (operator)Published 23 July 2025Static GTFS document dated 2025-07-23 on the operator's ArcGIS Hub portal, alongside 17 SITP datasets on the Bogotá open data portal. Established via search index; the individual document page was not fetched directly. First publication year of the GTFS feed could not be established and is not claimed.
Show 10 more sourcesShow fewer
↗ TransMilenio — fleet control system modernisation (operator, 2024)States a gradual renewal and modernisation of the fleet control system beginning 3 January 2024, enabling real-time management of the trunk and dual fleet, with GPS equipment on each trunk vehicle. FETCH FAILED: transmilenio.gov.co returns HTTP 403 to automated retrieval; content established via search index. Editor may wish to re-check before sealing.
↗ Tarjeta TuLlave — dates of the fare-card rollout (Wikipedia ES, tertiary)Sole source located for the sequence: collection concession awarded to Recaudo Bogotá S.A.S. on 16 June 2011 for 16 years; the card launched with the SITP in January 2012; unification of payment onto TuLlave across all TransMilenio stations began 2 September 2015. Tertiary source, used because the operator's own TuLlave page returns HTTP 403. The September 2015 date is the load-bearing one for the 'data layer came later' framing and should be re-checked if a primary source becomes reachable.
↗ Infobae — trunk fare evasion figures (24 July 2025)Fetched successfully. Carrying sentence: 'La evasión en el componente troncal de TransMilenio pasó de 29,6 % en 2022 a 13,1% en 2024', and 'La evasión sigue generando pérdidas superiores a $100.000 millones de pesos por semestre'. The article attributes the figures to councillors Cristina Calderón Restrepo and María Clara Name in a Bogotá council debate, not to a TransMilenio publication — so these are council-cited, not audited, numbers.
↗ Concejo de Bogotá — 2025 cost of fare evasion (12 February 2026)Council item headlined 'La evasión en TransMilenio le costó a Bogotá más de $265 mil millones en 2025'. FETCH FAILED: HTTP 503. Search-index summaries additionally report trunk evasion of about 15% at the close of 2025, rising 1.29 points in the second half after metro works forced the removal of automatic doors and access control on the Caracas corridor — that finer detail is NOT carried in the entry because it could not be verified sentence-level.
↗ Wikinoticias / NBC News — the March 2012 riots9 March 2012: blockades at all portales, stations damaged on Caracas (Calles 39, 45, 72 and Marly), Calle 80 and Las Américas; Marly station destroyed and looted; 28 detained; the Procuraduría General de la Nación named overcrowding and fare increases as triggers. Corroborated by NBC News, 'Police and protesters clash over public transportation in Bogota' (https://www.nbcnews.com/news/world/police-protesters-clash-over-public-transportation-bogota-flna391240). Not fetched directly; established via search index.
↗ Herrera Puyana, Gómez Rodríguez & García Fonseca — '¿Por qué TransMilenio en Bogotá está en crisis?' (Revista Ciudades, Estados y Política, Universidad Nacional de Colombia, 2017)Published 2017Fetched successfully. Academic critique of the contracting model: 388 km of exclusive bus lanes planned against 109 km completed by 2014; operators paid per kilometre run regardless of service quality; fares among the highest in Latin America relative to the minimum wage (11.6% vs 5.4% in Quito). Its further figures (2015 deficit, share of the fare going to operators, a 96% rise in accidents after a bus life-extension decision) are deliberately NOT carried in the entry — single-source and not independently corroborated.
↗ El Tiempo / Semana — the Carrera Séptima corridor, twice abandonedPublished 24 July 2020 · updated 25 July 2020Mayor Claudia López revoked the tender for the TransMilenio trunk on Carrera Séptima by administrative act, replacing it with a multimodal 'Corredor Verde'; Semana then reports the District revoking the Corredor Verde tender in turn (https://www.semana.com/politica/articulo/distrito-destapa-las-cartas-del-futuro-de-la-carrera-septima-en-bogota-tras-revocar-licitacion-del-corredor-verde-de-claudia-lopez/202431/). Together they establish that the corridor is still unbuilt. Neither fetched directly; established via search index.
↗ Alcaldía de Bogotá — Metro Line 1 construction progress (2026)Published 21 July 2026Line 1 at 80.37% overall progress as of 30 June 2026; 16 stations, fully elevated, commercial operation planned for the first quarter of 2028. Basis for 'more than 80% complete'. Establishes the metro as a separate project, deliberately not described in this entry beyond the historical link that Peñalosa shelved metro plans to build the busway.
↗ TransMilenio S.A. — '¿Qué es SITP?' (authority)Establishes the entity relationship required for scope: TRANSMILENIO S.A. is the managing entity (ente gestor) that plans, manages and controls the SITP, adopted as Bogotá's public transport system by Decree 309 of 2009. FETCH FAILED: HTTP 403; content established via search index and corroborated by the control-centre article, which shows the same company coordinating Troncal, TransMiZonal and TransMiCable.
↗ La República — interview with TransMilenio general manager on fares & subsidy (2026)Published 14 January 2026General manager María Fernanda Ortiz: the District subsidises 50% of the TransMilenio fare, set at COP 3,550 for 2026. Sole basis for the funding field. Not fetched directly; established via search index headline and summary.

📅 How old is the evidence?

Two clocks, kept apart: when this entry’s sources were published, and what has happened to its record in the atlas. Documented span: since 2000. 9 of 15 sources carry a publication date, from 2013 to 21 July 2026.

When the sources were published

  1. IDEAS/RePEc · researchHidalgo, Lleras & Hernández — capacity measurement (Research in Transportation Economics, 2013, peer-reviewed)
  2. AmeliCA (open-access repository) · researchHerrera Puyana, Gómez Rodríguez & García Fonseca — '¿Por qué TransMilenio en Bogotá está en crisis?' (Revista Ciudades, Estados y Política, Universidad Nacional de Colombia, 2017)
  3. El Tiempo · pressEl Tiempo / Semana — the Carrera Séptima corridor, twice abandoned · updated 25 July 2020
  4. TransMilenio S.A. · operatorTransMilenio open data portal — static GTFS (operator)
  5. Infobae · pressInfobae — trunk fare evasion figures (24 July 2025)
  6. La República · pressLa República — interview with TransMilenio general manager on fares & subsidy (2026)
  7. American Economic Association · researchTsivanidis — welfare evaluation (American Economic Review, 2026, peer-reviewed)
  8. Alcaldía Mayor de Bogotá · city governmentAlcaldía de Bogotá — Integrated Control Centre opens (17 March 2026)
Show 1 more dated sourcesShow fewer
  1. Alcaldía Mayor de Bogotá · city governmentAlcaldía de Bogotá — Metro Line 1 construction progress (2026)

Every source, with links ↑

What happened to this record

  1. Sources last read
  2. Entered the record

Every revision, permanent →

Show your work What this page rests on and what it can’t tell you · all 1 claims with their sources · the forensic record

Evidence Passport · public beta 1 addressable claim, 15 source dossiers, one permanent baseline. The passport is unreviewed — an AI-assisted structural migration, not a human or expert endorsement. Every revision keeps a permanent copy under revision history.

Inspect the claims, one by one — verbatim text, sources and caveats for all 1

The text below is copied verbatim from the published record. Each claim names the source dossiers that carry it; caveats stay attached to the claim they qualify.

Claim 1 clm-bdde448d5e216f47 quantitative
A peer-reviewed measurement put throughput on the busiest trunk section at about 43,000 passengers per hour per direction, with a practical ceiling near 48,000 at 150 passengers per bus
Published field
impact · verbatim
Mapping
mapped · no interpretation or interpolation added by this passport
What the mapping says
No support note recorded
Caveat
No claim-specific caveat recorded

Sources carrying this claim

  1. Hidalgo, Lleras & Hernández — capacity measurement (Research in Transportation Economics, 2013, peer-reviewed)
Forensic record — source dossiers, gaps, hashes and the exact revision this page renders

This layer records what is known about each source, what is still missing, and the exact snapshot this page is rendering. A missing date, archive or hash stays visible as missing.

unreviewed Revision 2026-08-20-source-dates effective 2026-07-26 · created 2026-08-20

Awaiting operator and domain-expert review; publication of this revision implies neither.

sha256:56cb1a938bbd8b657477a68fcdec8cc6cde91b2de7faef032ed6930cba0a51e4
1
of 1 claims mapped
15
source dossiers
7
publication dates recorded
1
archives linked
0
exact locators
0
content captures hashed

Governance facts carried by the record

Operator
TransMilenio S.A. (Bogotá district company), with private bus and fare-collection concessionaires
Actor types
utility, private
Funding model
ppp
Funding description
Fares plus a district subsidy — TransMilenio's general manager says the District covers about half the fare, set at COP 3,550 for 2026; infrastructure is publicly built, while buses and fare collection are run by private concessionaires.
Cost
Not recorded
Ownership
Not recorded
Decision rights
Not recorded
Exit conditions
Not recorded

15 source dossiers

Hidalgo, Lleras & Hernández — capacity measurement (Research in Transportation Economics, 2013, peer-reviewed) ideas.repec.org · 1 linked claim

Open original source ↗

Stable source ID
src-dedf596ab6b98a2e
Publisher
Name not classified · ideas.repec.org
Type / language
web-page · language not classified
Published
Not recorded
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-07-26
Dossier created
2026-08-20
Retrieved copy
No local capture recorded
Archive
Open archived copy ↗ · 2015-09-14
Content hash
No captured content hash
Locator
Open the recorded source note

Vol. 39(1):139-142. Abstract states 'actual throughput of 43,000 passengers hourly per direction with average bus occupancy of 150 passengers' and a practical capacity of '48,000 passengers per hour per direction with its existing infrastructure and 150 passengers per bus' (35,000 at 110 passengers per bus). Sole basis for the capacity figures; the entry attributes them rather than claiming any world record. Note the lead author was closely associated with the system's evaluation literature.

Descriptive only — not page/paragraph exact
Tsivanidis — welfare evaluation (American Economic Review, 2026, peer-reviewed) aeaweb.org · background

Open original source ↗

Stable source ID
src-5d1e1e177c640c59
Publisher
Name not classified · aeaweb.org
Type / language
web-page · language not classified
Published
Not recorded
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-07-26
Dossier created
2026-08-20
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

Vol. 116(2):418-63. Establishes that an independent economic evaluation exists and that conventional commute-time benefit calculations capture only about half the total welfare gain, with 'distributional impacts are modest'. No single headline number is quoted in the entry because the paper's results are model-based.

Descriptive only — not page/paragraph exact
Claims linked
Background source; no baseline claim points here
Alcaldía de Bogotá — Integrated Control Centre opens (17 March 2026) bogota.gov.co · background

Open original source ↗

Stable source ID
src-6d471ed210573b44
Publisher
Name not classified · bogota.gov.co
Type / language
web-page · language not classified
Published
2026-03-17
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-07-26
Dossier created
2026-08-20
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

Fetched successfully. Establishes the control centre is new, not original: 1,200 m2, 209 workstations, the first time in the system's 25-year history that operations and security run from one location; supervises up to 4 million daily trips and more than 10,700 buses; roughly 2,700 fixed cameras plus over 36,900 onboard; AI video analytics and onboard GPS; more than 40 million data records processed per day; coordinates Troncal, TransMiZonal and TransMiCable — the evidence that TransMilenio S.A.'s remit extends beyond the BRT.

Descriptive only — not page/paragraph exact
Claims linked
Background source; no baseline claim points here
TransMilenio — GTFS-realtime feed page (operator) gis.transmilenio.gov.co · background

Open original source ↗

Stable source ID
src-280c03de5941f077
Publisher
Name not classified · gis.transmilenio.gov.co
Type / language
web-page · language not classified
Published
Not recorded
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-07-26
Dossier created
2026-08-20
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

Fetched successfully. Lists three GTFS-realtime endpoints (vehiclepos.pb, serviceAlerts.pb, tripupdate.pb). Carries no licence or terms-of-use statement of any kind — the basis for 'no licence attached' in the snippet.

Descriptive only — not page/paragraph exact
Claims linked
Background source; no baseline claim points here
TransMilenio open data portal — static GTFS (operator) datosabiertos-transmilenio.hub.arcgis.com · background

Open original source ↗

Stable source ID
src-380e662f75e765eb
Publisher
Name not classified · datosabiertos-transmilenio.hub.arcgis.com
Type / language
web-page · language not classified
Published
2025-07-23
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-07-26
Dossier created
2026-08-20
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

Static GTFS document dated 2025-07-23 on the operator's ArcGIS Hub portal, alongside 17 SITP datasets on the Bogotá open data portal. Established via search index; the individual document page was not fetched directly. First publication year of the GTFS feed could not be established and is not claimed.

Descriptive only — not page/paragraph exact
Claims linked
Background source; no baseline claim points here
TransMilenio — fleet control system modernisation (operator, 2024) transmilenio.gov.co · background

Open original source ↗

Stable source ID
src-1a330612403d29d4
Publisher
Name not classified · transmilenio.gov.co
Type / language
web-page · language not classified
Published
Not recorded
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-07-26
Dossier created
2026-08-20
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

States a gradual renewal and modernisation of the fleet control system beginning 3 January 2024, enabling real-time management of the trunk and dual fleet, with GPS equipment on each trunk vehicle. FETCH FAILED: transmilenio.gov.co returns HTTP 403 to automated retrieval; content established via search index. Editor may wish to re-check before sealing.

Descriptive only — not page/paragraph exact
Claims linked
Background source; no baseline claim points here
Tarjeta TuLlave — dates of the fare-card rollout (Wikipedia ES, tertiary) es.wikipedia.org · background

Open original source ↗

Stable source ID
src-13dc2073a370190d
Publisher
Name not classified · es.wikipedia.org
Type / language
web-page · language not classified
Published
Not recorded
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-07-26
Dossier created
2026-08-20
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

Sole source located for the sequence: collection concession awarded to Recaudo Bogotá S.A.S. on 16 June 2011 for 16 years; the card launched with the SITP in January 2012; unification of payment onto TuLlave across all TransMilenio stations began 2 September 2015. Tertiary source, used because the operator's own TuLlave page returns HTTP 403. The September 2015 date is the load-bearing one for the 'data layer came later' framing and should be re-checked if a primary source becomes reachable.

Descriptive only — not page/paragraph exact
Claims linked
Background source; no baseline claim points here
Infobae — trunk fare evasion figures (24 July 2025) infobae.com · background

Open original source ↗

Stable source ID
src-5b2eb57acebef8bc
Publisher
Name not classified · infobae.com
Type / language
web-page · language not classified
Published
2025-07-24
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-07-26
Dossier created
2026-08-20
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

Fetched successfully. Carrying sentence: 'La evasión en el componente troncal de TransMilenio pasó de 29,6 % en 2022 a 13,1% en 2024', and 'La evasión sigue generando pérdidas superiores a $100.000 millones de pesos por semestre'. The article attributes the figures to councillors Cristina Calderón Restrepo and María Clara Name in a Bogotá council debate, not to a TransMilenio publication — so these are council-cited, not audited, numbers.

Descriptive only — not page/paragraph exact
Claims linked
Background source; no baseline claim points here
Concejo de Bogotá — 2025 cost of fare evasion (12 February 2026) concejodebogota.gov.co · background

Open original source ↗

Stable source ID
src-428422cacca12e89
Publisher
Name not classified · concejodebogota.gov.co
Type / language
web-page · language not classified
Published
2026-02-12
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-07-26
Dossier created
2026-08-20
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

Council item headlined 'La evasión en TransMilenio le costó a Bogotá más de $265 mil millones en 2025'. FETCH FAILED: HTTP 503. Search-index summaries additionally report trunk evasion of about 15% at the close of 2025, rising 1.29 points in the second half after metro works forced the removal of automatic doors and access control on the Caracas corridor — that finer detail is NOT carried in the entry because it could not be verified sentence-level.

Descriptive only — not page/paragraph exact
Claims linked
Background source; no baseline claim points here
Wikinoticias / NBC News — the March 2012 riots es.wikinews.org · background

Open original source ↗

Stable source ID
src-cd7b1024b46b38bf
Publisher
Name not classified · es.wikinews.org
Type / language
web-page · language not classified
Published
Not recorded
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-07-26
Dossier created
2026-08-20
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

9 March 2012: blockades at all portales, stations damaged on Caracas (Calles 39, 45, 72 and Marly), Calle 80 and Las Américas; Marly station destroyed and looted; 28 detained; the Procuraduría General de la Nación named overcrowding and fare increases as triggers. Corroborated by NBC News, 'Police and protesters clash over public transportation in Bogota' (https://www.nbcnews.com/news/world/police-protesters-clash-over-public-transportation-bogota-flna391240). Not fetched directly; established via search index.

Descriptive only — not page/paragraph exact
Claims linked
Background source; no baseline claim points here
Herrera Puyana, Gómez Rodríguez & García Fonseca — '¿Por qué TransMilenio en Bogotá está en crisis?' (Revista Ciudades, Estados y Política, Universidad Nacional de Colombia, 2017) portal.amelica.org · background

Open original source ↗

Stable source ID
src-aa2290f507a24198
Publisher
Name not classified · portal.amelica.org
Type / language
web-page · language not classified
Published
Not recorded
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-07-26
Dossier created
2026-08-20
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

Fetched successfully. Academic critique of the contracting model: 388 km of exclusive bus lanes planned against 109 km completed by 2014; operators paid per kilometre run regardless of service quality; fares among the highest in Latin America relative to the minimum wage (11.6% vs 5.4% in Quito). Its further figures (2015 deficit, share of the fare going to operators, a 96% rise in accidents after a bus life-extension decision) are deliberately NOT carried in the entry — single-source and not independently corroborated.

Descriptive only — not page/paragraph exact
Claims linked
Background source; no baseline claim points here
El Tiempo / Semana — the Carrera Séptima corridor, twice abandoned eltiempo.com · background

Open original source ↗

Stable source ID
src-71e8d5b54b527c36
Publisher
Name not classified · eltiempo.com
Type / language
web-page · language not classified
Published
2020-07-24
Updated
2020-07-25
Source last checked
No source-level check date
Record last verified
2026-07-26
Dossier created
2026-08-20
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

Mayor Claudia López revoked the tender for the TransMilenio trunk on Carrera Séptima by administrative act, replacing it with a multimodal 'Corredor Verde'; Semana then reports the District revoking the Corredor Verde tender in turn (https://www.semana.com/politica/articulo/distrito-destapa-las-cartas-del-futuro-de-la-carrera-septima-en-bogota-tras-revocar-licitacion-del-corredor-verde-de-claudia-lopez/202431/). Together they establish that the corridor is still unbuilt. Neither fetched directly; established via search index.

Descriptive only — not page/paragraph exact
Claims linked
Background source; no baseline claim points here
Alcaldía de Bogotá — Metro Line 1 construction progress (2026) bogota.gov.co · background

Open original source ↗

Stable source ID
src-b7918ba33a4e806c
Publisher
Name not classified · bogota.gov.co
Type / language
web-page · language not classified
Published
2026-07-21
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-07-26
Dossier created
2026-08-20
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

Line 1 at 80.37% overall progress as of 30 June 2026; 16 stations, fully elevated, commercial operation planned for the first quarter of 2028. Basis for 'more than 80% complete'. Establishes the metro as a separate project, deliberately not described in this entry beyond the historical link that Peñalosa shelved metro plans to build the busway.

Descriptive only — not page/paragraph exact
Claims linked
Background source; no baseline claim points here
TransMilenio S.A. — '¿Qué es SITP?' (authority) transmilenio.gov.co · background

Open original source ↗

Stable source ID
src-2e6a65c5ef0b4d47
Publisher
Name not classified · transmilenio.gov.co
Type / language
web-page · language not classified
Published
Not recorded
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-07-26
Dossier created
2026-08-20
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

Establishes the entity relationship required for scope: TRANSMILENIO S.A. is the managing entity (ente gestor) that plans, manages and controls the SITP, adopted as Bogotá's public transport system by Decree 309 of 2009. FETCH FAILED: HTTP 403; content established via search index and corroborated by the control-centre article, which shows the same company coordinating Troncal, TransMiZonal and TransMiCable.

Descriptive only — not page/paragraph exact
Claims linked
Background source; no baseline claim points here
La República — interview with TransMilenio general manager on fares & subsidy (2026) larepublica.co · background

Open original source ↗

Stable source ID
src-c6f69d87902f3773
Publisher
Name not classified · larepublica.co
Type / language
web-page · language not classified
Published
2026-01-14
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-07-26
Dossier created
2026-08-20
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

General manager María Fernanda Ortiz: the District subsidises 50% of the TransMilenio fare, set at COP 3,550 for 2026. Sole basis for the funding field. Not fetched directly; established via search index headline and summary.

Descriptive only — not page/paragraph exact
Claims linked
Background source; no baseline claim points here
Known limits of this passport
  • Publisher names and source languages have not yet been classified; domains are recorded without guessing.
  • Existing source notes are descriptive locators, not page- or paragraph-exact citations.
  • A missing archive, publication date or content hash is shown as null rather than inferred.
  • The project-level evidence grade ranks the strongest source in the entry; it is not a truth score for every claim.
📎 Cite this project

1001 Smart Cities (2026). “TransMilenio: Bogotá's BRT Trunk Network & Its Late Control Layer” — Bogotá, Colombia. The Smart City Atlas. https://1001smartcities.org/projects/bogota-transmilenio/ (last verified 2026-07-26). Data: CC BY 4.0.

The underlying data is free to reuse with attribution — see the open data page.

✉️ Get the next source-checked smart-city project in your inbox

One short email a week: the Landmark, one Insight, the new cities. No spam, one-click unsubscribe. About the newsletter · RSS