the century-old bus and power undertaking of Mumbai's civic body, the BMC
Permanent project revision
Revision 2026-08-22-evidence-baseline · effective 2026-07-19
Current revision. This is the snapshot used by the live entity page.
Created the first structured Evidence Passport with 11 claims and 5 source dossiers.
sha256:7a7ff2ff156259e057a01208fbd769a118be9533e9cbde474ae6394d4e607819
add /evidencePassport — Added claim-level evidence mapping and source dossiers.add /revisionHistory — Established a permanent, hash-addressed baseline revision.The text below is copied verbatim from the published record. Each claim names the source dossiers that carry it; caveats stay attached to the claim they qualify.
clm-8b7a932ef45bf0b1
descriptive
the century-old bus and power undertaking of Mumbai's civic body, the BMC
clm-b7d87bd4832ae5e6
quantitative
roughly 2,900-bus network
clm-1bcd09b162d1bdde
quantitative
targeting a fully electric fleet by 2027
clm-155ce7729f348690
quantitative
In February 2023 it introduced India's first electric double-decker
clm-b7ef09087293a2f4
descriptive
The fleet is GPS-tracked and app-ticketed.
clm-77465a1f6b6f5af3
quantitative
Over 700 battery-electric buses in service by late 2024
clm-4ecc7ccf4ea461ee
quantitative
of a ~2,900-bus fleet
clm-915e22c623787fc8
quantitative
100% electric target for 2027
clm-5aaf94ad298cdfb2
descriptive
A century-old municipal operator
clm-1a163d022bc455d0
descriptive
via long-term wet-lease (gross-cost) contracts rather than buying buses outright
clm-2d3542b60ebe363d
descriptive
supplier delivery delays have slowed the rollout
This layer records what is known about each source, what is still missing, and the exact snapshot this page is rendering. A missing date, archive or hash stays visible as missing.
Awaiting operator and domain-expert review; publication of this revision implies neither.
sha256:7a7ff2ff156259e057a01208fbd769a118be9533e9cbde474ae6394d4e607819
src-ce651cd478fd1644Confirms BEST is an undertaking of the Municipal Corporation of Greater Mumbai; runs city bus service and South Mumbai power supply.
src-8b3589767c93f4f9~711 e-buses by late 2024; 100% electric by 2027; 8,000-bus expansion plan.
src-9aedc2aded351e11India's first electric double-decker, delivered to BEST Feb 2023, route A-115, South Mumbai.
src-cc1a37734b1d9268Fleet composition; 2022 Olectra order (2,100 e-buses, ₹36.75bn); parent body = BMC.
src-efc198e4fac2e007Fleet-wide GPS live tracking, digital tickets and contactless Chalo Card (launched Jan 2022).