Mumbai's first fully underground metro
Permanent project revision
Revision 2026-08-21-unsourced-text-correction · effective 2026-07-26
Current revision. This is the snapshot used by the live entity page.
Removed or softened wording that no listed source carries, after reading every source while preparing the claim ledger. The source lists platform screen doors as contract scope without stating that all 27 stations have them.
sha256:a6b67ea92496f5f576f64c4af03707f63af4489415d97bf7ea40ec7465778963
replace /snapshot/projectFingerprint — Updated projectFingerprint to the current sourced project record.replace /snapshot/claims — Updated claims to the current sourced project record.replace /snapshot/sources — Updated sources to the current sourced project record.The text below is copied verbatim from the published record. Each claim names the source dossiers that carry it; caveats stay attached to the claim they qualify.
clm-0901a7015f62d58c
descriptive
Mumbai's first fully underground metro
clm-1bf37ccfb7ca9ce9
quantitative
opened in three phases between October 2024 and October 2025
clm-7b3ce9e98d3b4fd5
quantitative
33.5 km, 27 stations
clm-639a6ba5cf03441a
quantitative
Alstom supplied 31 eight-car trains with regenerative braking
clm-400b3909907262ba
descriptive
a CBTC package covering unattended train operation, platform screen doors and electrical and mechanical SCADA
clm-13e2d2c07d803169
descriptive
MMRC said driverless running would start only after six months of trials and safety-regulator clearance
clm-bbe6e9002aec9acb
quantitative
Over its first 136 days the partly opened line carried under 20,000 riders a day
clm-1d0cd7bf0c509d92
quantitative
against a 400,000 forecast
clm-abc9e29ade0d5c03
quantitative
the depot site at Aarey was stayed in 2019, shifted toward Kanjurmarg, then moved back in 2022
clm-b2c287ec5903a007
quantitative
141,000 average weekday riders in October 2025
clm-fa15b13e4a7a35b5
quantitative
the first month with the full 33.5 km corridor open
clm-9cfa0cf442a76b95
quantitative
peaking at 182,000 in a single day
clm-714a7d1e216a3555
descriptive
(MMRC figures reported by PTI)
This layer records what is known about each source, what is still missing, and the exact snapshot this page is rendering. A missing date, archive or hash stays visible as missing.
Awaiting operator and domain-expert review; publication of this revision implies neither.
sha256:a6b67ea92496f5f576f64c4af03707f63af4489415d97bf7ea40ec7465778963
src-f556b4fe0b4ea62bSupplier's release confirming the October 2024 commercial opening. Direct fetch returned 403; existence and content confirmed via search.
src-200c8fd10253bf51Quotes the contract scope: 31 trainsets / 248 cars, EUR 452M, customer MMRC, CBTC with unattended train operation, platform screen doors, electrical and mechanical SCADA, regenerative braking.
src-444bc7fffc927b75MMRC: service trials run with drivers on board; at least six months of trials required for safety-regulator authorisation before converting to driverless mode.
src-65de1b5a9adced88MMRC figures: 38.63 lakh riders in October 2025, 1.41 lakh average weekday, 1.82 lakh peak day; full line opened 9 October 2025.
src-3a761d7b0ed1ffa1MMRC data: 2.66 million riders over 136 days (7 Oct 2024 - 20 Feb 2025), under 20,000/day against a 400,000/day projection for the opened section.
src-76898176186c384cCumulative ridership passed 40 million in April 2026 on the 33.5 km corridor.
src-d453eb48cbb4b5d7Background reference for the three phase-opening dates, 27 stations, and the Aarey depot chronology: stay November 2019, alternative-site committee December 2019, construction resumed July 2022.