Mumbai Metro Aqua Line (Line 3) — Automated Underground Corridor
This overview was generated with AI from the public sources listed below and checked against them before publication. It has not had a complete human fact-check — treat it as a starting point and follow the sources.
13 sourced claims on this page, none individually verified yet — turn on “Sources in the text” to see each one.
How this atlas is made · What “last verified” means · What “source-checked” means · The full record behind this page
✎ Corrected 21 Aug 2026 1 claim added. What changed →
The signalling covers unattended operation, but driverless running waits on six months of trials and regulator clearance. The first 136 days drew under 20,000 riders a day against a 400,000 forecast.
what does this mean?
The strongest source is press reporting; no primary evaluation was located. It grades who did the looking — not how well the project went. All four grades →Part of 1001 Smart Cities — 1,167 documented projects · 🏙️ 6 more in Mumbai · 🚌 Public transport guide · 🚲 Mobility projects
Mumbai's first fully underground metro opened in three phases between October 2024 and October 2025: 33.5 km, 27 stations. Alstom supplied 31 eight-car trains with regenerative braking and a CBTC package covering unattended train operation, platform screen doors and electrical and mechanical SCADA. MMRC said driverless running would start only after six months of trials and safety-regulator clearance. Over its first 136 days the partly opened line carried under 20,000 riders a day against a 400,000 forecast; the depot site at Aarey was stayed in 2019, shifted toward Kanjurmarg, then moved back in 2022.
Sources
Show 2 more sourcesShow fewer
Show your work What this page rests on and what it can’t tell you · all 13 claims with their sources · the forensic record
Evidence Passport · public beta 13 addressable claims, 7 source dossiers, one permanent baseline. The passport is unreviewed — an AI-assisted structural migration, not a human or expert endorsement. Every revision keeps a permanent copy under revision history.
Inspect the claims, one by one — verbatim text, sources and caveats for all 13
The text below is copied verbatim from the published record. Each claim names the source dossiers that carry it; caveats stay attached to the claim they qualify.
clm-0901a7015f62d58c
descriptive
Mumbai's first fully underground metro
Sources carrying this claim
clm-1bf37ccfb7ca9ce9
quantitative
opened in three phases between October 2024 and October 2025
Sources carrying this claim
clm-7b3ce9e98d3b4fd5
quantitative
33.5 km, 27 stations
Sources carrying this claim
clm-639a6ba5cf03441a
quantitative
Alstom supplied 31 eight-car trains with regenerative braking
Sources carrying this claim
clm-400b3909907262ba
descriptive
a CBTC package covering unattended train operation, platform screen doors and electrical and mechanical SCADA
Sources carrying this claim
clm-13e2d2c07d803169
descriptive
MMRC said driverless running would start only after six months of trials and safety-regulator clearance
Sources carrying this claim
clm-bbe6e9002aec9acb
quantitative
Over its first 136 days the partly opened line carried under 20,000 riders a day
Sources carrying this claim
clm-1d0cd7bf0c509d92
quantitative
against a 400,000 forecast
Sources carrying this claim
clm-abc9e29ade0d5c03
quantitative
the depot site at Aarey was stayed in 2019, shifted toward Kanjurmarg, then moved back in 2022
Sources carrying this claim
clm-b2c287ec5903a007
quantitative
141,000 average weekday riders in October 2025
Sources carrying this claim
clm-fa15b13e4a7a35b5
quantitative
the first month with the full 33.5 km corridor open
Sources carrying this claim
clm-9cfa0cf442a76b95
quantitative
peaking at 182,000 in a single day
Sources carrying this claim
clm-714a7d1e216a3555
descriptive
(MMRC figures reported by PTI)
Sources carrying this claim
Forensic record — source dossiers, gaps, hashes and the exact revision this page renders
This layer records what is known about each source, what is still missing, and the exact snapshot this page is rendering. A missing date, archive or hash stays visible as missing.
Awaiting operator and domain-expert review; publication of this revision implies neither.
sha256:a6b67ea92496f5f576f64c4af03707f63af4489415d97bf7ea40ec7465778963
- 13
- of 13 claims mapped
- 7
- source dossiers
- 0
- publication dates recorded
- 0
- archives linked
- 0
- exact locators
- 0
- content captures hashed
Governance facts carried by the record
- Operator
- Mumbai Metro Rail Corporation Ltd (MMRC)
- Actor types
- utility
- Funding model
- public
- Funding description
- Not recorded
- Cost
- Not recorded
- Ownership
- Not recorded
- Decision rights
- Not recorded
- Exit conditions
- Not recorded
7 source dossiers
Alstom — Mumbai Metro Aqua Line inaugurated for commercial operation
- Stable source ID
src-f556b4fe0b4ea62b- Publisher
- Name not classified · alstom.com
- Type / language
- web-page · language not classified
- Published
- Not recorded
- Updated
- Not recorded
- Source last checked
- No source-level check date
- Record last verified
- 2026-07-26
- Dossier created
- 2026-08-21
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
- Descriptive only — not page/paragraph exact
Open the recorded source note
Supplier's release confirming the October 2024 commercial opening. Direct fetch returned 403; existence and content confirmed via search.
- Claims linked
Railway-News — Alstom starts manufacturing metro trains for Mumbai
- Stable source ID
src-200c8fd10253bf51- Publisher
- Name not classified · railway-news.com
- Type / language
- web-page · language not classified
- Published
- Not recorded
- Updated
- Not recorded
- Source last checked
- No source-level check date
- Record last verified
- 2026-07-26
- Dossier created
- 2026-08-21
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
- Descriptive only — not page/paragraph exact
Open the recorded source note
Quotes the contract scope: 31 trainsets / 248 cars, EUR 452M, customer MMRC, CBTC with unattended train operation, platform screen doors, electrical and mechanical SCADA, regenerative braking.
- Claims linked
Metro Rail News — Mumbai metro to launch driverless operations soon (May 2023)
- Stable source ID
src-444bc7fffc927b75- Publisher
- Name not classified · metrorailnews.in
- Type / language
- web-page · language not classified
- Published
- Not recorded
- Updated
- Not recorded
- Source last checked
- No source-level check date
- Record last verified
- 2026-07-26
- Dossier created
- 2026-08-21
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
- Descriptive only — not page/paragraph exact
Open the recorded source note
MMRC: service trials run with drivers on board; at least six months of trials required for safety-regulator authorisation before converting to driverless mode.
- Claims linked
The Week / PTI — Over 38 lakh commuters used Mumbai Metro Line-3 in October
- Stable source ID
src-65de1b5a9adced88- Publisher
- Name not classified · theweek.in
- Type / language
- web-page · language not classified
- Published
- Not recorded
- Updated
- Not recorded
- Source last checked
- No source-level check date
- Record last verified
- 2026-07-26
- Dossier created
- 2026-08-21
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
- Descriptive only — not page/paragraph exact
Open the recorded source note
MMRC figures: 38.63 lakh riders in October 2025, 1.41 lakh average weekday, 1.82 lakh peak day; full line opened 9 October 2025.
Free Press Journal — Mumbai Metro 3 struggles with ridership
- Stable source ID
src-3a761d7b0ed1ffa1- Publisher
- Name not classified · freepressjournal.in
- Type / language
- web-page · language not classified
- Published
- Not recorded
- Updated
- Not recorded
- Source last checked
- No source-level check date
- Record last verified
- 2026-07-26
- Dossier created
- 2026-08-21
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
- Descriptive only — not page/paragraph exact
Open the recorded source note
MMRC data: 2.66 million riders over 136 days (7 Oct 2024 - 20 Feb 2025), under 20,000/day against a 400,000/day projection for the opened section.
- Claims linked
Free Press Journal — Aqua Line ridership crosses 4 crore mark
- Stable source ID
src-76898176186c384c- Publisher
- Name not classified · freepressjournal.in
- Type / language
- web-page · language not classified
- Published
- Not recorded
- Updated
- Not recorded
- Source last checked
- No source-level check date
- Record last verified
- 2026-07-26
- Dossier created
- 2026-08-21
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
- Descriptive only — not page/paragraph exact
Open the recorded source note
Cumulative ridership passed 40 million in April 2026 on the 33.5 km corridor.
- Claims linked
Wikipedia — Aqua Line (Mumbai Metro)
- Stable source ID
src-d453eb48cbb4b5d7- Publisher
- Name not classified · en.wikipedia.org
- Type / language
- web-page · language not classified
- Published
- Not recorded
- Updated
- Not recorded
- Source last checked
- No source-level check date
- Record last verified
- 2026-07-26
- Dossier created
- 2026-08-21
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
- Descriptive only — not page/paragraph exact
Open the recorded source note
Background reference for the three phase-opening dates, 27 stations, and the Aarey depot chronology: stay November 2019, alternative-site committee December 2019, construction resumed July 2022.
Known limits of this passport
- Publisher names and source languages have not yet been classified; domains are recorded without guessing.
- Existing source notes are descriptive locators, not page- or paragraph-exact citations.
- A missing archive, publication date or content hash is shown as null rather than inferred.
- The project-level evidence grade ranks the strongest source in the entry; it is not a truth score for every claim.
Continue exploring
Compare this project
Explore the wider context
📎 Cite this project
1001 Smart Cities (2026). “Mumbai Metro Aqua Line (Line 3) — Automated Underground Corridor” — Mumbai, India. The Smart City Atlas. https://1001smartcities.org/projects/mumbai-metro-aqua-line/ (last verified 2026-07-26). Data: CC BY 4.0.
The underlying data is free to reuse with attribution — see the open data page.
