clm-5a16d3671fac7d4a
quantitative
Buenos Aires opened its first Metrobus corridor on Avenida Juan B. Justo on 31 May 2011
Permanent project revision
Revision 2026-08-20-evidence-baseline · effective 2026-07-26
Superseded. A later revision exists: 2026-08-22-cross-city-sourcing →
Created the first structured Evidence Passport with 6 claims and 12 source dossiers.
sha256:82414fbc22376ebf300468322062667a04b06d4f984884f11c3400744b2611e9
add /evidencePassport — Added claim-level evidence mapping and source dossiers.add /revisionHistory — Established a permanent, hash-addressed baseline revision.The text below is copied verbatim from the published record. Each claim names the source dossiers that carry it; caveats stay attached to the claim they qualify.
clm-5a16d3671fac7d4a
quantitative
Buenos Aires opened its first Metrobus corridor on Avenida Juan B. Justo on 31 May 2011
clm-a67c72de33cc9d98
descriptive
the city's own audit office found the first corridor ended up with open stations and effectively a priority-lane system rather than the closed-station BRT specified
clm-1f44a6d51f840b2c
quantitative
Vehicle tracking belongs to the national Ministry of Transport, which reads bus positions from SUBE farecard validators aboard some 18,000 AMBA buses
clm-c086128cf00bc4a9
quantitative
As of 1 July 2026 the city's GTFS and API datasets are suspended, "en revisión y corrección"
clm-210e7ee81bfa33c9
quantitative
ITDP reports the 9 de Julio crossing fell from over 40 minutes to about 14
clm-f7502bd4cec7843b
descriptive
the jurisdiction that runs the buses also owns their data
This layer records what is known about each source, what is still missing, and the exact snapshot this page is rendering. A missing date, archive or hash stays visible as missing.
Awaiting operator and domain-expert review; publication of this revision implies neither.
sha256:82414fbc22376ebf300468322062667a04b06d4f984884f11c3400744b2611e9
src-d85854994c384969Dated launch post for the Juan B. Justo corridor; supports the 31 May 2011 start date and the 'first BRT in Argentina' framing, which is ITDP's characterisation, not asserted here.
src-68c3307a2bb8a45bFetched. Source of the corridor lengths (9 de Julio 3.5 km, Sur 23 km) and the promoter travel-time and ridership figures: '200,000 passengers per day', crossing time 'over 40 minutes to average of 14 minutes', Sur '20 percent commute time reduction'. Advocacy NGO restating operator data — graded official, not independent. Contains no criticism.
src-5bcd6bc605e9e90eFetched. The load-bearing source for the design choice: the city 'transforms existing bus routes into highly efficient dedicated BRT lanes' while the federal government retains control of public transport operations; 50.5 km built within four years.
src-ac27a376db119f79Fetched (archived GCBA path). States 'La Ciudad cuenta con 10 corredores de Metrobus activos' and lists them: Bajo, Bajo 2, San Martín, Norte, Norte 2, AU 25 de Mayo, Sur, 9 de Julio, Juan B. Justo, Alberdi-Directorio. The live path buenosaires.gob.ar/movilidad/metrobus returned HTTP 404 to automated fetch; the Alberdi-Directorio press release returned 301 then HTTP 500.
src-fbcfb9bd5ed4c7fbFetched. City audit office report on the Juan B. Justo corridor, approved December 2013: auditors found a 'modificación sustantiva en el objetivo de la obra' and that jurisdictional conflict caused 'las estaciones terminen siendo abiertas en lugar de cerradas', turning the BRT into an exclusive-lane system. Also records a 28.71% construction cost increase from unforeseen Arroyo Maldonado works.
src-d4c8f77733311031Fetched. Carries the suspension notice verbatim: 'Se informa a los usuarios de BA DATA que todos los datasets con Formato API y GTFS, están suspendidos. Se encuentran en revisión y corrección.' Last modified 1 July 2026. The companion API page (data.buenosaires.gob.ar/dataset/api-transporte-publico) carries the same notice and describes real-time positions for bus, subway and rail.
src-8826a3e970abece9Fetched. National, not municipal: 'Los mismos emiten información en tiempo real permitiendo ver desde las oficinas de SUBE, si las unidades cumplen frecuencias, paradas y recorridos.' 10,000 onboard validators renewed; +18,000 buses monitored across the AMBA. This is the source for the statement that fleet telemetry does not sit with the city.
src-d54d63a21a571a3cFetched. 224 active fixed cameras in CABA; the published fine schedule includes 'Estacionar en carriles exclusivos o del Metrobus'. Note the asymmetry: the city's open dataset of fixed cameras (data.buenosaires.gob.ar/dataset/camaras-fijas-control-vehicular, CC-BY-2.5-AR, updated 23 July 2025) explicitly excludes the exclusive-lane cameras from publication.
src-ddfaa736f3c3c21dFetched. Judge Guillermo Scheiber (Contencioso Administrativo y Tributario) ordered the city to 'suspender inmediatamente cualquier actividad que implique la poda, trasplante, remoción o destrucción del arbolado público' on the Metrobus-affected stretch, and asked whether an environmental impact study had been done. A companion Infobae piece of 9 Feb 2013 puts the number at about 305 trees of the avenue's 1,440.
src-c26ce872951bbd9eFetched. Used here to mark the scope boundary: the Bank-financed corridor is 'BRT R3 Juan Manuel de Rosas' in La Matanza, Province of Buenos Aires, benefiting 240,000 users — its '53 percent reduction in travel time' and '105 percent' speed increase belong to that corridor and are deliberately NOT attributed to the city's network.
src-2a12fd34ad6ebb05Verified from search results, not fetched directly. Reports AMBA bus ridership falling from 3,554 million passengers in 2015 to 2,594 million in 2025 (−27%), with a further ~9% year-on-year drop in January 2026. Metro-area figure, not Metrobus-specific — cited as context for the network's demand environment, not as a Metrobus outcome.
src-46e8a9d688ad9a1bFetched. Working paper (2024, 'NEW DRAFT COMING SOON'), also circulated by CAF, finding the BRT increased spatial segregation between high- and low-skilled residents. Listed for the editor's awareness; not used as an impact figure because it is unpublished and the CAF landing page (scioteca.caf.com/handle/123456789/1911) returned HTTP 503.