clm-b27685db3c29ab1d
quantitative
began in June 2010 as a 15-year build-operate-transfer contract with Ericsson SA
Permanent project revision
Revision 2026-10-11-baseline · effective 2026-10-11
Current revision. This is the snapshot used by the live entity page.
Created the first structured Evidence Passport with 22 claims and 10 source dossiers.
sha256:3136cde0539bc1b95a7b0fb026dcc7942ebeebd2470b3b2ac89416a67e6332dc
add /evidencePassport — Added claim-level evidence mapping and source dossiers.add /revisionHistory — Established a permanent, hash-addressed baseline revision.The text below is copied verbatim from the published record. Each claim names the source dossiers that carry it; caveats stay attached to the claim they qualify.
clm-b27685db3c29ab1d
quantitative
began in June 2010 as a 15-year build-operate-transfer contract with Ericsson SA
clm-ece27ff03dcb7762
descriptive
ceded to CitiConnect Communications and BWired
clm-60a7d0761a7ffd8f
quantitative
About 900 km was laid by mid-2013
clm-a57d7cc6bf98ab80
quantitative
the 1 July 2013 go-live was missed
clm-b50f5edb1bbc5dc9
quantitative
on 31 July 2014 the city cancelled the contract for breaches
clm-6e8194fb611aae3e
quantitative
paid R1.3 billion to buy the network out
clm-e5e7223863f1ade6
quantitative
from September 2015 ran it through its own Metropolitan Trading Company (now Metropolitan Tech Company, MTC)
clm-cdb8e318dd467738
quantitative
A forensic investigation ordered in 2017 put the deal's costs at R1.7 billion
clm-7922c22eb279752b
descriptive
The fibre now links municipal buildings and carries free public Wi-Fi
clm-23020b95adf706d4
quantitative
26 network staff maintaining about 1,200 km
clm-0267c29f2b7f50b8
quantitative
a Wi-Fi target of 200,000 connections, against 1,574,979 recorded in 2024/25
clm-7858fe72e576e2eb
quantitative
the operator reported that the fibre reached about 30 clinics and 15 libraries by 2016
clm-b493900eca1a174d
quantitative
the free Wi-Fi logged 1,574,979 connections in 2024/25
clm-c4def1063711581e
quantitative
in March 2017 the mayor said that despite the cost 'few of these benefits have been realised'
clm-c9f64513ca6619b8
quantitative
MTC's 2026/27 business plan says ageing equipment, power outages and vandalism have kept it from meeting its network-availability targets
clm-b2ccef94c02689d1
quantitative
The city projected in 2015 that ending the contract would save it 20% a year
clm-1fe1ef3685e1e5b1
quantitative
Johannesburg's original deal would have cost it an annual fee and handed it the fibre after 15 years
clm-e0e5b0b04487540f
quantitative
the city bought the asset for R1.3 billion and took on the operation it had contracted out
clm-b18aaa7507b77870
descriptive
an entity the mayor later said had neither a viable business plan nor the capacity to run it
clm-8ee10a3820d1b951
quantitative
That entity lost R54 million in its first financial year
clm-315091ad675fc4c5
quantitative
the city tried to sell the network again from 2019
clm-1d91cb272955e6a0
quantitative
in 2026 MTC maintains 1,200 km with 26 network staff while more than 60% of its city subsidy goes to servicing its shareholder loan
This layer records what is known about each source, what is still missing, and the exact snapshot this page is rendering. A missing date, archive or hash stays visible as missing.
Awaiting operator and domain-expert review; publication of this revision implies neither.
sha256:3136cde0539bc1b95a7b0fb026dcc7942ebeebd2470b3b2ac89416a67e6332dc
src-1d0fd9233458c5c6Executive mayor Herman Mashaba's statement announcing the forensic investigation. States the sequence the entry relies on: tender awarded 19 December 2008; agreement terminated on 31 July 2014 'so as to operate the network itself through the MTC'; buy-out 'at a cost of R1.3 billion, without any viable business plans'; under the original agreement an annual fee and ownership after 15 years; MTC 'commencing operations on 30 September 2015' and ending 2015/16 with a net loss of R54 million; 'few of these benefits have been realised'; and that the Auditor-General 'raised a number of serious concerns' about MTC's financial performance.
src-6849926c9695e7dcThe operator's own integrated report for its first year (41 pages; the Audit and Risk Committee report inside is dated 30 November 2016, the cover carries only the financial year). States that CCC/BWired 'had committed numerous acts of repudiation' under the BOT and that the city 'cancelled the BOT on 31 July 2014'; settlement concluded 28 May 2015 and implemented 3 September 2015, the effective transfer date; MTC is 100% owned by the municipality; the transferred asset cost 'R1,3 billion'; the MMC's foreword says the city 'has rolled out 1150km' of fibre; the network reached about 30 clinics and 15 libraries; 340 Wi-Fi hotspots were planned for 2016/17; 15 employees migrated from BWired. The Auditor-General's report section (page 40) is blank in the file.
src-f9a8d88cf3b14e9dReports the council decision to create a municipal entity and pay R1.2 billion to buy back the network assets; Ericsson SA won the deal in 2010 for 15 years and ceded it to CitiConnect Communications, which manages BWired; the dispute concerned intermediary companies selling spare capacity and fibre for a second network laid in the city's trenches; '900km of fibre-optic cables that have been rolled out'; the city's head of broadband says termination released the city from R279 million a year over 12 years, 'a 20% annual saving'. The R3.4bn in the headline is not itemised in the text.
src-7fe733f627a794afReports, before the council vote, that the network 'remains unused 18 months after it was expected to deliver fast internet', that Ericsson SA was appointed 'four years ago' to build a 900km network for R1.1-billion, that launch was expected in July 2013, and that settling would absolve the city from paying R3.348-billion over the 12-year operating period, according to council documents.
src-337058796c938b4bQuotes the mayor's progress update on the forensic investigation: 'costs relating to the deal currently amount to R1.7-billion' and 'likely to rise'; the investigators' report implicates a minister and a deputy minister as benefiting 'to the tune of almost R200-million'; an official was suspended and a court order obtained to image devices. The report itself is not public; the figures are the mayor's account of it.
src-c7042f9b81be900dRetrospective after the Sunday Times reported the final Nexus Forensic Services findings. States the network 'was initially envisaged to become operational on 1 July 2013', that after more than a decade there is 'still no clarity' when it will go live, the 2010 award to Ericsson SA and cession to CCC, the 2014 cancellation and the R1.3 billion buy-out, and names the three ANC members the Sunday Times said were directors of CCC. Gives the ministers' benefit as R279 million, which conflicts with the R200 million in the mayor's own December 2017 statement.
src-5643bfb71f4d933fReports the open tender to sell the '1 000 km fibre network', expected to raise R853-million to just over R1-billion; MTC proposed the build-operate-transfer sale model in May 2018, would procure network services from the buyer and keep a first right of refusal; public meetings in the seven regions. The sale is cited as a plan — the article does not record a buyer or a completed transfer.
src-dbbea76629bce8e8Reports MTC's February 2021 update that a 'compliant service provider has now been identified' under tender A34-2018/2019 and 'entered into an agreement of sale', with virtual public meetings on the service level agreement from 24 to 26 February 2021; the buyer is not named. Reproduces MTC's own history of the network: Ericsson SA commissioned in June 2010 for 15 years (three years to build, twelve to operate), cession to CCC with BWired to operate, 'approximately 900 kilometres' built by mid-2013, and the September 2015 transfer to MTC as a going concern 'for approximately R1.25 billion, financed by means of a shareholder loan account'.
src-adc15ec0fc1d10ccCity newsroom article (dated 06/08/2026 on the page) on MTC's Core Network Rehabilitation Programme: 'the fibre network underpins municipal buildings, public Wi-Fi, digital communication systems and other smart city services'; rehabilitation work under way in Randburg, Hunters Hill, Sandton, Alexandra, Martindale, Roodepoort, Eldorado Park and Lenasia. The entry's present-tense statements about what runs on the fibre rest on this page.
src-22756966e5a22d3bJan Bornman for Our City News, published by the Sunday Times (page dated September 20, 2026; the URL slug says 19 September). Reports MTC's 2026/27 business plan: 'relying on just 26 network employees to maintain 1,200km of fibre'; the entity is 'currently under-capacitated'; more than 60% of its city subsidy services its shareholder loan after R169m in subsidy revenue; about R570m operating and R20.7m capital expenditure; ageing equipment, power outages and vandalism behind missed network-availability targets; 1,574,979 free Wi-Fi connections in 2024/25 against a 200,000 target for 2026/27, which the plan does not explain; the Slovo Park 'smart Wi-Fi' pilot launched in March 2026 and residents' reports of very poor signal. MTC did not respond to the newspaper's questions.