Quito Metro's Line 1 (15 stations, Quitumbe to El Labrador, 18 CAF-built trains)
Permanent project revision
Revision 2026-08-22-evidence-baseline · effective 2026-08-07
Current revision. This is the snapshot used by the live entity page.
Created the first structured Evidence Passport with 9 claims and 6 source dossiers.
sha256:b525e742d7ee9d3a69d83104d80bc53eb444527a271b96a449736f0c5c405a1a
add /evidencePassport — Added claim-level evidence mapping and source dossiers.add /revisionHistory — Established a permanent, hash-addressed baseline revision.The text below is copied verbatim from the published record. Each claim names the source dossiers that carry it; caveats stay attached to the claim they qualify.
clm-2f8ee3da7af65408
quantitative
Quito Metro's Line 1 (15 stations, Quitumbe to El Labrador, 18 CAF-built trains)
clm-0340d3ad96b95a07
quantitative
runs on Alstom's CITYFLO 350 automatic train control
clm-bd3b77ba10ba76b7
quantitative
Inaugurated 21 December 2022
clm-61856a7e4bd4a604
quantitative
a limited passenger trial in May 2023 was halted after nine days
clm-fa2b91b63b849460
quantitative
full commercial service began on 1 December 2023
clm-fd3f8e95a37b73e0
quantitative
In March 2026 Alstom signed a US$27 million, 48-month contract to maintain the signalling.
clm-dd7e5712dd27a723
quantitative
218,000 average weekday trips in May 2026
clm-45261091ddeb367a
quantitative
(+4.3% on April)
clm-480e1d30cb8051b8
quantitative
roughly 150 million cumulative trips since commercial service began in December 2023
This layer records what is known about each source, what is still missing, and the exact snapshot this page is rendering. A missing date, archive or hash stays visible as missing.
Awaiting operator and domain-expert review; publication of this revision implies neither.
sha256:b525e742d7ee9d3a69d83104d80bc53eb444527a271b96a449736f0c5c405a1a
src-f6aa8850faea4f28Operator; line and service basics.
src-07fcf1dfeefcb105218,000 average weekday trips in May 2026, +4.3% vs April; ~150 million cumulative trips by end of May 2026.
src-6cbcff13e7c2a283Signalling maintenance contract announcement (blocks automated fetch with 403; contents confirmed via trade press).
src-ece92fe76d90f8c3US$27M, 48 months, work from March 2026; obsolescence management and upgrades; describes CITYFLO 350 with no CBTC label.
src-6a2b62581eca343eFull commercial opening 1 December 2023.
src-56c2b5f5225f840eStations/trains chronology incl. the nine-day May 2023 trial halt.