Quito Metro Line 1: CITYFLO 350 Automatic Train Control Signalling
This overview was generated with AI from the public sources listed below and checked against them before publication. It has not had a complete human fact-check — treat it as a starting point and follow the sources.
How this atlas is made · What “last verified” means · What “source-checked” means · The full record behind this page
Quito Metro's Line 1 (15 stations, Quitumbe to El Labrador, 18 CAF-built trains) runs on Alstom's CITYFLO 350 automatic train control. Inaugurated 21 December 2022, a limited passenger trial in May 2023 was halted after nine days, with the operator citing safety reasons; full commercial service began on 1 December 2023. In March 2026 Alstom signed a US$27 million, 48-month contract to maintain the signalling.
what does this mean?
The strongest source is the operator's or the city's own reporting — an official report, dataset or press release. It grades who did the looking — not how well the project went. All four grades →📊 Impact
218,000 average weekday trips in May 2026 (+4.3% on April) and roughly 150 million cumulative trips since commercial service began in December 2023, per the operator's monthly bulletin.
Sources
Show 1 more sourcesShow fewer
📅 How old is the evidence?
Two clocks, kept apart: when this entry’s sources were published, and what has happened to its record in the atlas. Documented span: since 2023. 3 of 6 sources carry a publication date, from 5 December 2023 to 17 June 2026.
When the sources were published
- Railway Gazette International · pressRailway Gazette International
- Alstom · vendorAlstom (press release, March 2026)
- Metro de Quito · operatorMetro de Quito — Boletín estadístico mayo 2026 (operator)
Show your work What this page rests on and what it can’t tell you · all 9 claims with their sources · the forensic record
Evidence Passport · public beta 9 addressable claims, 6 source dossiers, one permanent baseline. The passport is unreviewed — an AI-assisted structural migration, not a human or expert endorsement. Every revision keeps a permanent copy under revision history.
Inspect the claims, one by one — verbatim text, sources and caveats for all 9
The text below is copied verbatim from the published record. Each claim names the source dossiers that carry it; caveats stay attached to the claim they qualify.
clm-2f8ee3da7af65408
quantitative
Quito Metro's Line 1 (15 stations, Quitumbe to El Labrador, 18 CAF-built trains)
Sources carrying this claim
clm-0340d3ad96b95a07
quantitative
runs on Alstom's CITYFLO 350 automatic train control
Sources carrying this claim
clm-bd3b77ba10ba76b7
quantitative
Inaugurated 21 December 2022
Sources carrying this claim
clm-61856a7e4bd4a604
quantitative
a limited passenger trial in May 2023 was halted after nine days
Sources carrying this claim
clm-fa2b91b63b849460
quantitative
full commercial service began on 1 December 2023
Sources carrying this claim
clm-fd3f8e95a37b73e0
quantitative
In March 2026 Alstom signed a US$27 million, 48-month contract to maintain the signalling.
Sources carrying this claim
clm-dd7e5712dd27a723
quantitative
218,000 average weekday trips in May 2026
Sources carrying this claim
clm-45261091ddeb367a
quantitative
(+4.3% on April)
Sources carrying this claim
clm-480e1d30cb8051b8
quantitative
roughly 150 million cumulative trips since commercial service began in December 2023
Sources carrying this claim
Forensic record — source dossiers, gaps, hashes and the exact revision this page renders
This layer records what is known about each source, what is still missing, and the exact snapshot this page is rendering. A missing date, archive or hash stays visible as missing.
Awaiting operator and domain-expert review; publication of this revision implies neither.
sha256:b525e742d7ee9d3a69d83104d80bc53eb444527a271b96a449736f0c5c405a1a
- 9
- of 9 claims mapped
- 6
- source dossiers
- 3
- publication dates recorded
- 0
- archives linked
- 0
- exact locators
- 0
- content captures hashed
Governance facts carried by the record
- Operator
- Metro de Quito
- Actor types
- utility
- Funding model
- Not recorded
- Funding description
- Not recorded
- Cost
- Not recorded
- Ownership
- Not recorded
- Decision rights
- Not recorded
- Exit conditions
- Not recorded
6 source dossiers
Metro de Quito (operator)
- Stable source ID
src-f6aa8850faea4f28- Publisher
- Name not classified · metrodequito.gob.ec
- Type / language
- web-page · language not classified
- Published
- Not recorded
- Updated
- Not recorded
- Source last checked
- No source-level check date
- Record last verified
- 2026-08-07
- Dossier created
- 2026-08-22
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
- Descriptive only — not page/paragraph exact
Open the recorded source note
Operator; line and service basics.
- Claims linked
- Background source; no baseline claim points here
Metro de Quito — Boletín estadístico mayo 2026 (operator)
- Stable source ID
src-07fcf1dfeefcb105- Publisher
- Name not classified · metrodequito.gob.ec
- Type / language
- web-page · language not classified
- Published
- 2026-06-17
- Updated
- Not recorded
- Source last checked
- No source-level check date
- Record last verified
- 2026-08-07
- Dossier created
- 2026-08-22
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
- Descriptive only — not page/paragraph exact
Open the recorded source note
218,000 average weekday trips in May 2026, +4.3% vs April; ~150 million cumulative trips by end of May 2026.
Alstom (press release, March 2026)
- Stable source ID
src-6cbcff13e7c2a283- Publisher
- Name not classified · alstom.com
- Type / language
- web-page · language not classified
- Published
- 2026-03-04
- Updated
- Not recorded
- Source last checked
- No source-level check date
- Record last verified
- 2026-08-07
- Dossier created
- 2026-08-22
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
- Descriptive only — not page/paragraph exact
Open the recorded source note
Signalling maintenance contract announcement (blocks automated fetch with 403; contents confirmed via trade press).
- Claims linked
Railway-News (trade press)
- Stable source ID
src-ece92fe76d90f8c3- Publisher
- Name not classified · railway-news.com
- Type / language
- web-page · language not classified
- Published
- Not recorded
- Updated
- Not recorded
- Source last checked
- No source-level check date
- Record last verified
- 2026-08-07
- Dossier created
- 2026-08-22
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
- Descriptive only — not page/paragraph exact
Open the recorded source note
US$27M, 48 months, work from March 2026; obsolescence management and upgrades; describes CITYFLO 350 with no CBTC label.
- Claims linked
Railway Gazette International
- Stable source ID
src-6a2b62581eca343e- Publisher
- Name not classified · railwaygazette.com
- Type / language
- web-page · language not classified
- Published
- 2023-12-05
- Updated
- Not recorded
- Source last checked
- No source-level check date
- Record last verified
- 2026-08-07
- Dossier created
- 2026-08-22
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
- Descriptive only — not page/paragraph exact
Open the recorded source note
Full commercial opening 1 December 2023.
Wikipedia — Quito Metro Line 1
- Stable source ID
src-56c2b5f5225f840e- Publisher
- Name not classified · en.wikipedia.org
- Type / language
- web-page · language not classified
- Published
- Not recorded
- Updated
- Not recorded
- Source last checked
- No source-level check date
- Record last verified
- 2026-08-07
- Dossier created
- 2026-08-22
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
- Descriptive only — not page/paragraph exact
Open the recorded source note
Stations/trains chronology incl. the nine-day May 2023 trial halt.
- Claims linked
Known limits of this passport
- Publisher names and source languages have not yet been classified; domains are recorded without guessing.
- Existing source notes are descriptive locators, not page- or paragraph-exact citations.
- A missing archive, publication date or content hash is shown as null rather than inferred.
- The project-level evidence grade ranks the strongest source in the entry; it is not a truth score for every claim.
Continue exploring
Compare this project
Explore the wider context
📎 Cite this project
1001 Smart Cities (2026). “Quito Metro Line 1: CITYFLO 350 Automatic Train Control Signalling” — Quito, Ecuador. The Smart City Atlas. https://1001smartcities.org/projects/quito-metro-signaling/ (last verified 2026-08-07). Data: CC BY 4.0.
The underlying data is free to reuse with attribution — see the open data page.
