clm-2f086752b1a2f90e
quantitative
28 high-frequency lines (17 vertical, 8 horizontal, 3 diagonal) running every 5-8 minutes on straightened routes, with interchange hubs wherever they cross
Permanent project revision
Revision 2026-08-27-p1-quality-uplift · effective 2026-07-25
Current revision. This is the snapshot used by the live entity page.
Full claim mapping over snippet, impact and lesson; sourced impact and lesson added; source dates and attributions corrected from the same reading.
sha256:255e9ee58f8f2c45fb8e675fc5d9dc809e48cd7edd01f6ff55c34756f974685d
replace /snapshot/projectFingerprint — Updated projectFingerprint to the current sourced project record.replace /snapshot/projectState — Updated projectState to the current sourced project record.replace /snapshot/claims — Updated claims to the current sourced project record.replace /snapshot/sources — Updated sources to the current sourced project record.The text below is copied verbatim from the published record. Each claim names the source dossiers that carry it; caveats stay attached to the claim they qualify.
clm-2f086752b1a2f90e
quantitative
28 high-frequency lines (17 vertical, 8 horizontal, 3 diagonal) running every 5-8 minutes on straightened routes, with interchange hubs wherever they cross
clm-a40a80b2c0c1efbe
quantitative
It replaced most of a 63-line direct-service network inherited from the previous century's trams
clm-a7e69f666ea0b403
quantitative
the finished city network has 97 lines, of which 28 are the grid
clm-aab2075e2f80cbda
descriptive
Major stops carry real-time next-bus panels and solar-powered info poles, plus touch-screen planners at key interchanges and the iBus app
clm-91ce8ef23be8af7c
quantitative
boardings on the first-phase lines rose 20.3% when phase 2 opened and another 9.5% at phase 3, about 31.7% in all, and the phase-2 lines that were not extended grew 24.2%
clm-a0c7ff3f3309bd13
quantitative
the city's overall transit ridership fell 2.1% and private vehicle trips 3.2% over the same years
clm-a713a36b8b6a9fe7
quantitative
26% of Nova Xarxa trips involved one at the end of 2015, and 57% on line V7, against about 11% on the old network and 1.5% in Boston, 3% in New York, 13% in London and 16% in Melbourne
clm-09ad639bc22615f8
quantitative
The final-phase figures of 44% and 66% are the authors' model, not a count
clm-b712b9b3e3963cbe
quantitative
from about 11% of trips on the old radial map to 26% on the new one
clm-9714ae52f6a7e94b
descriptive
The instrument that proved it was the fare-validation record the operator already held
clm-adc2fe8bd761d66f
quantitative
the grid is 28 of 97 lines, and the completed-network figures are a projection
This layer records what is known about each source, what is still missing, and the exact snapshot this page is rendering. A missing date, archive or hash stays visible as missing.
Awaiting operator and domain-expert review; publication of this revision implies neither.
Erratum on this revision's envelope. The snapshot, its hash and its permanent link are untouched.
sha256:255e9ee58f8f2c45fb8e675fc5d9dc809e48cd7edd01f6ff55c34756f974685d
src-791a566049ee4b4dPhase-by-phase deployment from 1 October 2012 to autumn 2018; 28 high-performance lines (17 vertical, 8 horizontal, 3 diagonal); interchange hubs where the axes cross; the finished network comprising 97 lines, of which 43 are urban and inter-city, 26 neighbourhood buses and 28 the grid. The page carries no publication date; the 2016 date it shows is the day three lines began running.
src-bbc43e0359316ed0Real-time arrival panels in shelters and on solar poles, touch-screen planners and the iBus real-time app.
src-91883de607b1b3c7UC Berkeley Institute of Transportation Studies working paper, using TMB validation data: boardings on phase-1 lines up 20.3% then 9.5% (about 31.7% in all), phase-2 fixed lines up 24.2%, against a 2.1% fall in overall transit trips and 3.2% in private vehicle trips; 26% of trips involving a transfer at the end of 2015 (57% on V7) against about 11% on the old network; the 44% and 66% completed-network figures are model predictions. The authors published a journal version of the argument in 2017.
src-4360ed5e8b987e1eIndependent expert commentary on the same redesign, describing a high-frequency transfer-based grid and what it asks of riders.