Nova Xarxa Orthogonal Bus Network
This overview was generated with AI from the public sources listed below and checked against them before publication. It has not had a complete human fact-check — treat it as a starting point and follow the sources.
How this atlas is made · What “last verified” means · What “source-checked” means · The full record behind this page
✎ Updated 26 Aug 2026 Evidence grade changed: peer-reviewed → independent. What changed →
From 2012 to 2018 TMB laid an orthogonal grid over Barcelona's bus map: the Nova Xarxa, 28 high-frequency lines (17 vertical, 8 horizontal, 3 diagonal) running every 5-8 minutes on straightened routes, with interchange hubs wherever they cross. It replaced most of a 63-line direct-service network inherited from the previous century's trams; the finished city network has 97 lines, of which 28 are the grid. Major stops carry real-time next-bus panels and solar-powered info poles, plus touch-screen planners at key interchanges and the iBus app.
what does this mean?
The strongest source is an independent non-academic evaluation: an audit office, a government or EU review, or an NGO. It grades who did the looking — not how well the project went. All four grades →📊 Impact
A UC Berkeley working paper using TMB's own fare-validation records found the grid growing faster than anything around it: boardings on the first-phase lines rose 20.3% when phase 2 opened and another 9.5% at phase 3, about 31.7% in all, and the phase-2 lines that were not extended grew 24.2% — while the city's overall transit ridership fell 2.1% and private vehicle trips 3.2% over the same years. The growth is carried by transfers, which the authors treat as the mechanism rather than the cost: 26% of Nova Xarxa trips involved one at the end of 2015, and 57% on line V7, against about 11% on the old network and 1.5% in Boston, 3% in New York, 13% in London and 16% in Melbourne. The final-phase figures of 44% and 66% are the authors' model, not a count.
🎓 Lesson
Transfers are normally counted as what a network redesign costs its riders. Barcelona built a grid that could only work if people accepted them, and then measured how many did: from about 11% of trips on the old radial map to 26% on the new one, while boardings on the same lines rose by roughly a third and the rest of the city's transit was flat or falling. The instrument that proved it was the fare-validation record the operator already held — no survey, no new sensor. What it cannot show is the rest of the map: the grid is 28 of 97 lines, and the completed-network figures are a projection.
Sources
Show your work What this page rests on and what it can’t tell you · all 11 claims with their sources · the forensic record
Evidence Passport · public beta 11 addressable claims, 4 source dossiers, one permanent baseline. The passport is unreviewed — an AI-assisted structural migration, not a human or expert endorsement. Every revision keeps a permanent copy under revision history.
Inspect the claims, one by one — verbatim text, sources and caveats for all 11
The text below is copied verbatim from the published record. Each claim names the source dossiers that carry it; caveats stay attached to the claim they qualify.
clm-2f086752b1a2f90e
quantitative
28 high-frequency lines (17 vertical, 8 horizontal, 3 diagonal) running every 5-8 minutes on straightened routes, with interchange hubs wherever they cross
Sources carrying this claim
clm-a40a80b2c0c1efbe
quantitative
It replaced most of a 63-line direct-service network inherited from the previous century's trams
Sources carrying this claim
clm-a7e69f666ea0b403
quantitative
the finished city network has 97 lines, of which 28 are the grid
Sources carrying this claim
clm-aab2075e2f80cbda
descriptive
Major stops carry real-time next-bus panels and solar-powered info poles, plus touch-screen planners at key interchanges and the iBus app
Sources carrying this claim
clm-91ce8ef23be8af7c
quantitative
boardings on the first-phase lines rose 20.3% when phase 2 opened and another 9.5% at phase 3, about 31.7% in all, and the phase-2 lines that were not extended grew 24.2%
Sources carrying this claim
clm-a0c7ff3f3309bd13
quantitative
the city's overall transit ridership fell 2.1% and private vehicle trips 3.2% over the same years
Sources carrying this claim
clm-a713a36b8b6a9fe7
quantitative
26% of Nova Xarxa trips involved one at the end of 2015, and 57% on line V7, against about 11% on the old network and 1.5% in Boston, 3% in New York, 13% in London and 16% in Melbourne
Sources carrying this claim
clm-09ad639bc22615f8
quantitative
The final-phase figures of 44% and 66% are the authors' model, not a count
Sources carrying this claim
clm-b712b9b3e3963cbe
quantitative
from about 11% of trips on the old radial map to 26% on the new one
Sources carrying this claim
clm-9714ae52f6a7e94b
descriptive
The instrument that proved it was the fare-validation record the operator already held
Sources carrying this claim
clm-adc2fe8bd761d66f
quantitative
the grid is 28 of 97 lines, and the completed-network figures are a projection
Sources carrying this claim
Forensic record — source dossiers, gaps, hashes and the exact revision this page renders
This layer records what is known about each source, what is still missing, and the exact snapshot this page is rendering. A missing date, archive or hash stays visible as missing.
Awaiting operator and domain-expert review; publication of this revision implies neither.
Erratum on this revision's envelope. The snapshot, its hash and its permanent link are untouched.
- createdAt previously read 2026-08-27T22:00:00Z. The batching script that produced this revision advanced createdAt into the future to satisfy the strictly-increasing order the validator requires per entity. The value never recorded a real event; the corrected value is the moment the revision provably existed in the repository. Corrected to 2026-08-26T23:52:42Z on 2026-08-27; evidence: first appears in commit a8492f64da, committed 2026-08-26T23:52:42Z.
sha256:255e9ee58f8f2c45fb8e675fc5d9dc809e48cd7edd01f6ff55c34756f974685d
- 11
- of 11 claims mapped
- 4
- source dossiers
- 1
- publication dates recorded
- 0
- archives linked
- 0
- exact locators
- 0
- content captures hashed
Governance facts carried by the record
- Operator
- TMB (Transports Metropolitans de Barcelona)
- Actor types
- utility
- Funding model
- Not recorded
- Funding description
- Not recorded
- Cost
- Not recorded
- Ownership
- Not recorded
- Decision rights
- Not recorded
- Exit conditions
- Not recorded
4 source dossiers
TMB — New bus network: evolution (official)
- Stable source ID
src-791a566049ee4b4d- Publisher
- Name not classified · tmb.cat
- Type / language
- web-page · language not classified
- Published
- Not recorded
- Updated
- Not recorded
- Source last checked
- No source-level check date
- Record last verified
- 2026-07-25
- Dossier created
- 2026-08-27
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
- Descriptive only — not page/paragraph exact
Open the recorded source note
Phase-by-phase deployment from 1 October 2012 to autumn 2018; 28 high-performance lines (17 vertical, 8 horizontal, 3 diagonal); interchange hubs where the axes cross; the finished network comprising 97 lines, of which 43 are urban and inter-city, 26 neighbourhood buses and 28 the grid. The page carries no publication date; the 2016 date it shows is the day three lines began running.
TMB — How to use the new bus network (official)
- Stable source ID
src-bbc43e0359316ed0- Publisher
- Name not classified · tmb.cat
- Type / language
- web-page · language not classified
- Published
- Not recorded
- Updated
- Not recorded
- Source last checked
- No source-level check date
- Record last verified
- 2026-07-25
- Dossier created
- 2026-08-27
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
- Descriptive only — not page/paragraph exact
Open the recorded source note
Real-time arrival panels in shelters and on solar poles, touch-screen planners and the iBus real-time app.
- Claims linked
Badia, Argote-Cabañero & Daganzo — 'Network Effects in Bus Transit: Evidence from Barcelona's Nova Xarxa', UC Berkeley ITS Working Paper UCB-ITS-WP-2016-01
- Stable source ID
src-91883de607b1b3c7- Publisher
- Name not classified · escholarship.org
- Type / language
- web-page · language not classified
- Published
- Not recorded
- Updated
- Not recorded
- Source last checked
- No source-level check date
- Record last verified
- 2026-07-25
- Dossier created
- 2026-08-27
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
- Descriptive only — not page/paragraph exact
Open the recorded source note
UC Berkeley Institute of Transportation Studies working paper, using TMB validation data: boardings on phase-1 lines up 20.3% then 9.5% (about 31.7% in all), phase-2 fixed lines up 24.2%, against a 2.1% fall in overall transit trips and 3.2% in private vehicle trips; 26% of trips involving a transfer at the end of 2015 (57% on V7) against about 11% on the old network; the 44% and 66% completed-network figures are model predictions. The authors published a journal version of the argument in 2017.
Human Transit — 'Barcelona's Bus Network: Better Access, If You Change Buses' (2017)
- Stable source ID
src-4360ed5e8b987e1e- Publisher
- Name not classified · humantransit.org
- Type / language
- web-page · language not classified
- Published
- 2017-04-17
- Updated
- Not recorded
- Source last checked
- No source-level check date
- Record last verified
- 2026-07-25
- Dossier created
- 2026-08-27
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
- Descriptive only — not page/paragraph exact
Open the recorded source note
Independent expert commentary on the same redesign, describing a high-frequency transfer-based grid and what it asks of riders.
- Claims linked
- Background source; no baseline claim points here
Known limits of this passport
- Publisher names and source languages have not yet been classified; domains are recorded without guessing.
- Existing source notes are descriptive locators, not page- or paragraph-exact citations.
- A missing archive, publication date or content hash is shown as null rather than inferred.
- The project-level evidence grade ranks the strongest source in the entry; it is not a truth score for every claim.
Continue exploring
Compare this project
Explore the wider context
📎 Cite this project
1001 Smart Cities (2026). “Nova Xarxa Orthogonal Bus Network” — Barcelona, Spain. The Smart City Atlas. https://1001smartcities.org/projects/barcelona-nova-xarxa-bus/ (last verified 2026-07-25). Data: CC BY 4.0.
The underlying data is free to reuse with attribution — see the open data page.