{
 "schemaVersion": "1.0.0",
 "constitutionVersion": "1.0.0",
 "createdAt": "2026-08-12T00:00:00Z",
 "description": "Append-only Evidence Passport records. Old revisions are immutable; corrections create a new revision and preserve the previous permalink.",
 "entity": {
  "type": "project",
  "id": "barcelona-nova-xarxa-bus",
  "title": "Nova Xarxa Orthogonal Bus Network",
  "canonicalUrl": "https://1001smartcities.org/projects/barcelona-nova-xarxa-bus/"
 },
 "currentRevisionId": "2026-08-27-p1-quality-uplift",
 "revisions": [
  {
   "id": "2026-08-20-source-dates",
   "createdAt": "2026-08-20T19:29:52Z",
   "effectiveAt": "2026-07-25",
   "changeType": "baseline",
   "summary": "Created the first structured Evidence Passport with 1 claim and 4 source dossiers.",
   "preparedBy": {
    "type": "automation",
    "label": "AI-assisted evidence preparation",
    "humanApproved": false
   },
   "review": {
    "status": "unreviewed",
    "by": null,
    "date": null,
    "note": "Awaiting operator and domain-expert review; publication of this revision implies neither."
   },
   "changes": [
    {
     "operation": "add",
     "path": "/evidencePassport",
     "summary": "Added claim-level evidence mapping and source dossiers."
    },
    {
     "operation": "add",
     "path": "/revisionHistory",
     "summary": "Established a permanent, hash-addressed baseline revision."
    }
   ],
   "snapshotHash": "sha256:b6d7975779070455bd26c2ab2c93e4aed868569446159d79658157c6299b5dd2",
   "snapshot": {
    "asOf": "2026-07-25",
    "projectFingerprint": "sha256:2bd466d3471a836b4d4da4cc6b4d075937b7b8d386e565fe3bf88e387e65d4f2",
    "assurance": {
     "status": "unreviewed",
     "scope": "evidence-passport-revision",
     "statement": "AI-assisted structural preparation. This revision has not been reviewed by a human or subject-matter expert.",
     "machineChecks": [
      "schema",
      "publication-diff-contract",
      "material-project-fingerprint",
      "claim-text-drift",
      "source-reference-resolution",
      "complete-source-dossier",
      "snapshot-hash"
     ]
    },
    "projectState": {
     "status": "live",
     "outcome": "succeeded",
     "evidenceGrade": "peer-reviewed",
     "timeline": {
      "started": 2012,
      "ended": null
     }
    },
    "governance": {
     "operator": "TMB (Transports Metropolitans de Barcelona)",
     "actorTypes": [
      "utility"
     ],
     "fundingModel": null,
     "fundingDescription": null,
     "cost": null,
     "ownership": null,
     "decisionRights": null,
     "exitConditions": null
    },
    "claims": [
     {
      "id": "clm-2fd3fad4e9e8746d",
      "field": "impact",
      "text": "corridor ridership rose 6–24% after the redesign",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-91883de607b1b3c7"
      ],
      "supportNote": "The study estimates ridership gains of 6–24% on redesigned corridors, with about 26% of boardings arriving by transfer.",
      "caveat": "Gains vary by corridor; the study covers the network's phased rollout years.",
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     }
    ],
    "sources": [
     {
      "id": "src-791a566049ee4b4d",
      "title": "TMB — New bus network: evolution (official)",
      "url": "https://www.tmb.cat/en/get-to-know-tmb/transport-network-improvements/new-bus-network/evolution",
      "publisher": {
       "name": null,
       "domain": "tmb.cat",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "background",
      "claimRefs": [],
      "temporal": {
       "publishedAt": "2016-02-29",
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-07-25",
       "dossierCreatedAt": "2026-08-20",
       "retrievedAt": null,
       "status": "publication-and-record-dates-recorded"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Deployment 2012–2018, 28 lines (17 vertical / 8 horizontal / 3 diagonal), 5–8 min frequency, demand-based design",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-bbc43e0359316ed0",
      "title": "TMB — How to use the new bus network (official)",
      "url": "https://www.tmb.cat/en/get-to-know-tmb/transport-network-improvements/new-bus-network/how-to-use-it",
      "publisher": {
       "name": null,
       "domain": "tmb.cat",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "background",
      "claimRefs": [],
      "temporal": {
       "publishedAt": null,
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-07-25",
       "dossierCreatedAt": "2026-08-20",
       "retrievedAt": null,
       "status": "record-date-only"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Real-time arrival panels in shelters and on solar poles, touch-screen planners, iBus real-time app",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-91883de607b1b3c7",
      "title": "Badia, Argote-Cabañero et al. — 'Network Effects in Bus Transit: Evidence from Barcelona's Nova Xarxa'",
      "url": "https://escholarship.org/uc/item/3996t4c6",
      "publisher": {
       "name": null,
       "domain": "escholarship.org",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-2fd3fad4e9e8746d"
      ],
      "temporal": {
       "publishedAt": null,
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-07-25",
       "dossierCreatedAt": "2026-08-20",
       "retrievedAt": null,
       "status": "record-date-only"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Independent evaluation: corridor ridership +6–24%; ~26% of boardings from transfers",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-4360ed5e8b987e1e",
      "title": "Human Transit — 'Barcelona's Bus Network: Better Access, If You Change Buses' (2017)",
      "url": "https://humantransit.org/2017/04/guest-post-barcelonas-bus-network-better-access-if-you-change-buses.html",
      "publisher": {
       "name": null,
       "domain": "humantransit.org",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "background",
      "claimRefs": [],
      "temporal": {
       "publishedAt": "2017-04-17",
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-07-25",
       "dossierCreatedAt": "2026-08-20",
       "retrievedAt": null,
       "status": "publication-and-record-dates-recorded"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Independent expert corroboration of the high-frequency transfer-based grid design",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     }
    ],
    "coverage": {
     "claimsTotal": 1,
     "claimsMapped": 1,
     "sourcesTotal": 4,
     "sourcesUsedByClaims": 1,
     "sourcesWithPublicationDate": 2,
     "sourcesWithArchive": 0,
     "sourcesWithExactLocator": 0,
     "sourcesWithContentHash": 0
    },
    "limits": [
     "Publisher names and source languages have not yet been classified; domains are recorded without guessing.",
     "Existing source notes are descriptive locators, not page- or paragraph-exact citations.",
     "A missing archive, publication date or content hash is shown as null rather than inferred.",
     "The project-level evidence grade ranks the strongest source in the entry; it is not a truth score for every claim."
    ]
   }
  },
  {
   "id": "2026-08-27-p1-quality-uplift",
   "createdAt": "2026-08-26T23:52:42Z",
   "effectiveAt": "2026-07-25",
   "changeType": "update",
   "summary": "Full claim mapping over snippet, impact and lesson; sourced impact and lesson added; source dates and attributions corrected from the same reading.",
   "preparedBy": {
    "type": "automation",
    "label": "AI-assisted evidence preparation",
    "humanApproved": false
   },
   "review": {
    "status": "unreviewed",
    "by": null,
    "date": null,
    "note": "Awaiting operator and domain-expert review; publication of this revision implies neither."
   },
   "changes": [
    {
     "operation": "replace",
     "path": "/snapshot/projectFingerprint",
     "summary": "Updated projectFingerprint to the current sourced project record."
    },
    {
     "operation": "replace",
     "path": "/snapshot/projectState",
     "summary": "Updated projectState to the current sourced project record."
    },
    {
     "operation": "replace",
     "path": "/snapshot/claims",
     "summary": "Updated claims to the current sourced project record."
    },
    {
     "operation": "replace",
     "path": "/snapshot/sources",
     "summary": "Updated sources to the current sourced project record."
    }
   ],
   "snapshotHash": "sha256:255e9ee58f8f2c45fb8e675fc5d9dc809e48cd7edd01f6ff55c34756f974685d",
   "snapshot": {
    "asOf": "2026-07-25",
    "projectFingerprint": "sha256:0cf66397a304e67fa685cd76e9298dab47d0bdd076f41757fb7eb2f62ab8573b",
    "assurance": {
     "status": "unreviewed",
     "scope": "evidence-passport-revision",
     "statement": "AI-assisted structural preparation. This revision has not been reviewed by a human or subject-matter expert.",
     "machineChecks": [
      "schema",
      "publication-diff-contract",
      "material-project-fingerprint",
      "claim-text-drift",
      "source-reference-resolution",
      "complete-source-dossier",
      "snapshot-hash"
     ]
    },
    "projectState": {
     "status": "live",
     "outcome": "succeeded",
     "evidenceGrade": "independent",
     "timeline": {
      "started": 2012,
      "ended": null
     }
    },
    "governance": {
     "operator": "TMB (Transports Metropolitans de Barcelona)",
     "actorTypes": [
      "utility"
     ],
     "fundingModel": null,
     "fundingDescription": null,
     "cost": null,
     "ownership": null,
     "decisionRights": null,
     "exitConditions": null
    },
    "claims": [
     {
      "id": "clm-2f086752b1a2f90e",
      "field": "snippet",
      "text": "28 high-frequency lines (17 vertical, 8 horizontal, 3 diagonal) running every 5-8 minutes on straightened routes, with interchange hubs wherever they cross",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-791a566049ee4b4d",
       "src-91883de607b1b3c7"
      ],
      "supportNote": "TMB describes the interchange hubs as 'the points where vertical, horizontal and diagonal bus routes intersect, in both directions'; the working paper: 'The Nova Xarxa will be formed by 8 horizontal lines, 17 vertical and 3 diagonal.'",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-a40a80b2c0c1efbe",
      "field": "snippet",
      "text": "It replaced most of a 63-line direct-service network inherited from the previous century's trams",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-91883de607b1b3c7",
       "src-791a566049ee4b4d"
      ],
      "supportNote": "The working paper: 'Barcelona's old urban bus network had 63 direct-service lines with many centripetal routes … The new bus network, the Nova Xarxa, will serve the whole city with 28 lines and replace most of the old bus network so that only 20 secondary routes of the old network will be retained.' TMB: 'Up until 2012 the Barcelona bus network was the heir to the tram network of the previous century.'",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-a7e69f666ea0b403",
      "field": "snippet",
      "text": "the finished city network has 97 lines, of which 28 are the grid",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-791a566049ee4b4d"
      ],
      "supportNote": "TMB: 'The completion of the final phase finished in autumn 2018, when the Barcelona bus network comprise 97 lines: 43 urban and inter-city lines, 26 Bus de Barri or neighbourhood buses and 28 high performance lines.'",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-aab2075e2f80cbda",
      "field": "snippet",
      "text": "Major stops carry real-time next-bus panels and solar-powered info poles, plus touch-screen planners at key interchanges and the iBus app",
      "statementKind": "descriptive",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-bbc43e0359316ed0"
      ],
      "supportNote": "TMB's guide to using the network describes the real-time arrival panels in shelters and on solar poles, the touch-screen planners and the iBus app.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-91ce8ef23be8af7c",
      "field": "impact",
      "text": "boardings on the first-phase lines rose 20.3% when phase 2 opened and another 9.5% at phase 3, about 31.7% in all, and the phase-2 lines that were not extended grew 24.2%",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-91883de607b1b3c7"
      ],
      "supportNote": "The working paper: 'the aggregate boardings on Phase 1 lines increased 20.3% from Phase 1 to Phase 2 and by another 9.5% from Phase 2 to Phase 3 … The fixed lines that remained grew by 24.2% from Phase 2 to Phase 3', and 'the number of boardings for the lines of Phase 1 grew by about 31.7% as Phases 2 and 3 were completed.'",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-a0c7ff3f3309bd13",
      "field": "impact",
      "text": "the city's overall transit ridership fell 2.1% and private vehicle trips 3.2% over the same years",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-91883de607b1b3c7"
      ],
      "supportNote": "The working paper: 'Barcelona's overall transit ridership (including Metro, light rail and all bus services) and private vehicle demand levels remained approximately unchanged … The line decreases by 2.1% in a very narrow band … the dashed line, which decreases by 3.2% between 2011 and 2014.'",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-a713a36b8b6a9fe7",
      "field": "impact",
      "text": "26% of Nova Xarxa trips involved one at the end of 2015, and 57% on line V7, against about 11% on the old network and 1.5% in Boston, 3% in New York, 13% in London and 16% in Melbourne",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-91883de607b1b3c7"
      ],
      "supportNote": "The working paper: 'at the end of 2015, the percentage of trips that involved a transfer was approximately 26%, and it reached a maximum of 57% for line V7'; and 'The Nova Xarxa's current 26.3% value already exceeds by a wide margin the transfer percentages of the old bus network, which was about 11% … Melbourne 16%, or Boston 1.5%, London 13% and New York 3%.'",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-09ad639bc22615f8",
      "field": "impact",
      "text": "The final-phase figures of 44% and 66% are the authors' model, not a count",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-91883de607b1b3c7"
      ],
      "supportNote": "The working paper: 'the model predicts that transfers will represent more than 44% of all trips in the final phase and almost 66% for line V7.'",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-b712b9b3e3963cbe",
      "field": "lesson",
      "text": "from about 11% of trips on the old radial map to 26% on the new one",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-91883de607b1b3c7"
      ],
      "supportNote": "The working paper contrasts the Nova Xarxa's 26.3% transfer share with about 11% on the old bus network.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-9714ae52f6a7e94b",
      "field": "lesson",
      "text": "The instrument that proved it was the fare-validation record the operator already held",
      "statementKind": "descriptive",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-91883de607b1b3c7"
      ],
      "supportNote": "The paper's analysis is built on monthly validation counts per line, from which it teases out demand and transfers using a two-parameter regression.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-adc2fe8bd761d66f",
      "field": "lesson",
      "text": "the grid is 28 of 97 lines, and the completed-network figures are a projection",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-791a566049ee4b4d",
       "src-91883de607b1b3c7"
      ],
      "supportNote": "TMB gives the finished network as 97 lines with 28 high-performance ones; the working paper labels the 44% and 66% completed-network transfer shares as model predictions.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     }
    ],
    "sources": [
     {
      "id": "src-791a566049ee4b4d",
      "title": "TMB — New bus network: evolution (official)",
      "url": "https://www.tmb.cat/en/get-to-know-tmb/transport-network-improvements/new-bus-network/evolution",
      "publisher": {
       "name": null,
       "domain": "tmb.cat",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-2f086752b1a2f90e",
       "clm-a40a80b2c0c1efbe",
       "clm-a7e69f666ea0b403",
       "clm-adc2fe8bd761d66f"
      ],
      "temporal": {
       "publishedAt": null,
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-07-25",
       "dossierCreatedAt": "2026-08-27",
       "retrievedAt": null,
       "status": "record-date-only"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Phase-by-phase deployment from 1 October 2012 to autumn 2018; 28 high-performance lines (17 vertical, 8 horizontal, 3 diagonal); interchange hubs where the axes cross; the finished network comprising 97 lines, of which 43 are urban and inter-city, 26 neighbourhood buses and 28 the grid. The page carries no publication date; the 2016 date it shows is the day three lines began running.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-bbc43e0359316ed0",
      "title": "TMB — How to use the new bus network (official)",
      "url": "https://www.tmb.cat/en/get-to-know-tmb/transport-network-improvements/new-bus-network/how-to-use-it",
      "publisher": {
       "name": null,
       "domain": "tmb.cat",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-aab2075e2f80cbda"
      ],
      "temporal": {
       "publishedAt": null,
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-07-25",
       "dossierCreatedAt": "2026-08-27",
       "retrievedAt": null,
       "status": "record-date-only"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Real-time arrival panels in shelters and on solar poles, touch-screen planners and the iBus real-time app.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-91883de607b1b3c7",
      "title": "Badia, Argote-Cabañero & Daganzo — 'Network Effects in Bus Transit: Evidence from Barcelona's Nova Xarxa', UC Berkeley ITS Working Paper UCB-ITS-WP-2016-01",
      "url": "https://escholarship.org/uc/item/3996t4c6",
      "publisher": {
       "name": null,
       "domain": "escholarship.org",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-2f086752b1a2f90e",
       "clm-a40a80b2c0c1efbe",
       "clm-91ce8ef23be8af7c",
       "clm-a0c7ff3f3309bd13",
       "clm-a713a36b8b6a9fe7",
       "clm-09ad639bc22615f8",
       "clm-b712b9b3e3963cbe",
       "clm-9714ae52f6a7e94b",
       "clm-adc2fe8bd761d66f"
      ],
      "temporal": {
       "publishedAt": null,
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-07-25",
       "dossierCreatedAt": "2026-08-27",
       "retrievedAt": null,
       "status": "record-date-only"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "UC Berkeley Institute of Transportation Studies working paper, using TMB validation data: boardings on phase-1 lines up 20.3% then 9.5% (about 31.7% in all), phase-2 fixed lines up 24.2%, against a 2.1% fall in overall transit trips and 3.2% in private vehicle trips; 26% of trips involving a transfer at the end of 2015 (57% on V7) against about 11% on the old network; the 44% and 66% completed-network figures are model predictions. The authors published a journal version of the argument in 2017.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-4360ed5e8b987e1e",
      "title": "Human Transit — 'Barcelona's Bus Network: Better Access, If You Change Buses' (2017)",
      "url": "https://humantransit.org/2017/04/guest-post-barcelonas-bus-network-better-access-if-you-change-buses.html",
      "publisher": {
       "name": null,
       "domain": "humantransit.org",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "background",
      "claimRefs": [],
      "temporal": {
       "publishedAt": "2017-04-17",
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-07-25",
       "dossierCreatedAt": "2026-08-27",
       "retrievedAt": null,
       "status": "publication-and-record-dates-recorded"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Independent expert commentary on the same redesign, describing a high-frequency transfer-based grid and what it asks of riders.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     }
    ],
    "coverage": {
     "claimsTotal": 11,
     "claimsMapped": 11,
     "sourcesTotal": 4,
     "sourcesUsedByClaims": 3,
     "sourcesWithPublicationDate": 1,
     "sourcesWithArchive": 0,
     "sourcesWithExactLocator": 0,
     "sourcesWithContentHash": 0
    },
    "limits": [
     "Publisher names and source languages have not yet been classified; domains are recorded without guessing.",
     "Existing source notes are descriptive locators, not page- or paragraph-exact citations.",
     "A missing archive, publication date or content hash is shown as null rather than inferred.",
     "The project-level evidence grade ranks the strongest source in the entry; it is not a truth score for every claim."
    ]
   }
  }
 ]
}
