clm-35e3497fcff2d510
descriptive
a county agency, not the city
Permanent project revision
Revision 2026-10-05-baseline · effective 2026-10-05
Current revision. This is the snapshot used by the live entity page.
Created the first structured Evidence Passport with 18 claims and 8 source dossiers.
sha256:f73abad17a695d8ea7600f0271c7bf5694141c6f4b80e8f020e39bdb81a4415e
add /evidencePassport — Added claim-level evidence mapping and source dossiers.add /revisionHistory — Established a permanent, hash-addressed baseline revision.The text below is copied verbatim from the published record. Each claim names the source dossiers that carry it; caveats stay attached to the claim they qualify.
clm-35e3497fcff2d510
descriptive
a county agency, not the city
clm-b9f41ba0708fc4e7
quantitative
has built TARP since 1975
clm-3a6fa1fbb924c8f6
quantitative
110 miles of tunnel
clm-408dfb0463afc209
quantitative
150 to 300 feet down
clm-e0443c6cbfbf3f93
quantitative
feeding reservoirs that now hold over 11 billion gallons
clm-22590ba1b87e22c8
descriptive
MWRD publishes reservoir fill levels on a public live map
clm-aabe815e3d8110a4
quantitative
Overflow days fell from about 100 a year to 50
clm-e76203669ab1a602
quantitative
McCook Stage 2 has slipped to 2032
clm-c7d492567020dc23
quantitative
MWRD reports combined sewer overflows fell from an average of 100 days a year to 50 once the tunnels came online
clm-defd61cb87509e8c
quantitative
overflows in the Thornton Composite Reservoir's service area have been eliminated since 2020
clm-3f6df8c1e62feada
quantitative
TARP has captured over 1 trillion gallons of combined sewage since 1981
clm-7a4d30b183b648d8
quantitative
about 140 billion of it by McCook Stage 1 alone by June 2026
clm-d2e4d532034512d6
quantitative
the tunnel system captures about 85% of the combined-sewer-overflow pollution from its service area
clm-f0f94e0a0b868a48
descriptive
All figures are the district's own; no independent evaluation was found
clm-4435ec2225107b69
quantitative
Fifty years and more than $3 billion halved overflow days
clm-f39f38a0ed70d7b8
quantitative
in July 2026 McCook sat between 96% and 100% full
clm-5bee81a65b0d4f79
quantitative
311 logged almost 400 complaints of water in basements
clm-f20a91e569a4825d
quantitative
the neighbourhood sewers, which handle about 2 inches of rain before flooding is likely, not the tunnels, are the bottleneck
This layer records what is known about each source, what is still missing, and the exact snapshot this page is rendering. A missing date, archive or hash stays visible as missing.
Awaiting operator and domain-expert review; publication of this revision implies neither.
sha256:f73abad17a695d8ea7600f0271c7bf5694141c6f4b80e8f020e39bdb81a4415e
src-80e956e9e0d826daOperator page. Carries the scale and the outcome figures sentence-level: 'four tunnel systems totaling 110 miles of tunnels, 8 to 33 feet in diameter and 150 to 300 feet underground'; 'The system currently has a capacity of more than 11 billion gallons for combined sewage and stormwater'; 'since the first portions of the system were put in operation in 1981, TARP has captured over 1 trillion gallons of combined sewage'; 'CSOs have been reduced from an average of 100 days per year to 50'; Thornton eliminating CSOs in its service area since 2020. Reservoir dates: Majewski 1998, Thornton 2015, McCook Stage 1 2017.
src-8f31e8b33b7e0558This is the measurement layer the entry rests on: a public interactive map of live reservoir fill levels, with a full-screen view and a live camera on McCook. The page states no update interval or units, so the entry claims only that fill levels are published live, not any accuracy or frequency.
src-db5fbe1ffae9ee27Currency source, and the correction that matters: 'The current estimate for McCook Stage 2 going online is now Dec. 31, 2032.' Consent decree entered 6 January 2014 originally required mining complete by 31 December 2028 and operation by 31 December 2029; the delay is attributed to a slowdown in Chicago-area stone demand. Also: McCook Stage 1 'has already captured approximately 130 billion gallons'; Stage 2 brings McCook to 10 billion gallons; the system serves 3.1 million people across Chicago and 36 suburban municipalities.
src-5fa5fe5b043f01a9Counterweight and 2026 currency, sentence-level: 'The McCook reservoir in southwest suburban Bedford Park fluctuated between 96% and 100% full' after 'more than 8 inches of rain over the past 30 days'; 'The city's 311 system received almost 400 complaints about water in basements and nearly 600 reports about flooded streets between Thursday and Monday afternoon.' Also carries the independent view: 'Experts say that Deep Tunnel isn't enough to prevent flooding.'
src-5b22692946ae6eedBoundary source, and the reason this entry claims no automation: 'The MWRDGC now desires to develop a new, updated and enhanced computer model for each TARP system, to allow real-time control of the TARP systems.' Real-time control is a stated goal of a modelling research programme, not a documented operating system. Earlier models 'were based on design, rather than as-built specifications for the system and are now outdated.'
src-09b747e9e81d2eb5Reference work, used only for dates and cost where MWRD does not state them: 'adopted in 1972, commenced in 1975, and completed and operational by 2006'; '109.4 miles of drainage tunnels ranging from 9 to 33 feet in diameter, up to 350 feet underground'; 'Across 30 years of construction, over $3 billion has been spent on the project.' Its reservoir capacities (Majewski 350 million, Thornton 7.9 billion, McCook Stage 1 3.5 billion gallons) and 2032 Stage 2 date agree with MWRD.
src-7bf429bb042b71fcThe city's local answer to TARP's limits, and the source of the agency split: the $12 million Wing Storage pilot is 'a partnership between the Chicago Department of Water Management and the Metropolitan Water Reclamation District of Greater Chicago' — two vaults under West Side streets holding nearly 1.7 million gallons for more than 2,900 buildings, announced 8 July 2026. No sensors, monitoring or control layer is described; water is released back into the sewer as capacity frees up.
src-905f5de4a1f1d5eePhase I's 110 miles of tunnel capture about 85% of CSO pollution from the service area; McCook Stage 1 has captured about 140 billion gallons; Stage 2 about 75% excavated and expected operational in 2032; total TARP cost $3.861 billion in contract-award dollars.