clm-7540e4e89cd70bfd
quantitative
Incheon Metro Line 2 opened driverless-capable in July 2016
Permanent project revision
Revision 2026-08-21-evidence-baseline · effective 2026-07-27
Superseded. A later revision exists: 2026-08-21-unsourced-text-correction →
Created the first structured Evidence Passport with 12 claims and 4 source dossiers.
sha256:e90fcd76c213f7e6c18cd281bf9d4c32562b40b97b2d0a0d57aef8acfd55f6c0
add /evidencePassport — Added claim-level evidence mapping and source dossiers.add /revisionHistory — Established a permanent, hash-addressed baseline revision.The text below is copied verbatim from the published record. Each claim names the source dossiers that carry it; caveats stay attached to the claim they qualify.
clm-7540e4e89cd70bfd
quantitative
Incheon Metro Line 2 opened driverless-capable in July 2016
clm-77d90bdb1dfb26cc
descriptive
a derailment falsely reported as a drill
clm-3ddb7344031116fb
descriptive
other early faults
clm-9d3db86873e9122d
descriptive
kept safety officers aboard for nearly eight years
clm-a78353b4758c9230
quantitative
On 1 January 2024, Incheon Transit Corporation switched the full 29.1km, 27-station line to fully unattended (UTO) operation
clm-8636de891d4866cd
descriptive
a domestic first, the operator says
clm-6665de618547cb58
quantitative
Manual driver interventions fell from 139 in 2017 to 1 in 2023
clm-84cb348b3bd882ca
quantitative
the reliability record the operator cited ahead of the January 2024 unattended-operation switch
clm-6d022309a7ce84b8
quantitative
Line 2's CBTC signaling and cabinless trains were driverless-ready from day one in 2016
clm-860bbfa1040fe314
descriptive
an opening-week wave of faults
clm-40471d51d016333e
quantitative
a cover-up of an August 2016 derailment as a fake drill
clm-839d060c6feabc9f
descriptive
kept human safety officers aboard for nearly eight years before the operator trusted the system enough to remove them
This layer records what is known about each source, what is still missing, and the exact snapshot this page is rendering. A missing date, archive or hash stays visible as missing.
Awaiting operator and domain-expert review; publication of this revision implies neither.
sha256:e90fcd76c213f7e6c18cd281bf9d4c32562b40b97b2d0a0d57aef8acfd55f6c0
src-bf6e8c83dff19884Driverless launch 2016, staffed DTO period, manual-intervention counts, January 2024 UTO switch.
src-4fb4427cdd2cf650Ridership figures, 'domestic first' framing (attributed to the operator).
src-5838ef11b4597807August 2016 derailment cover-up, exposed by leaked CCTV.
src-d90f717a97d22a53Thales SelTrac CBTC signaling since 2009; ridership figures.