Permanent project revision

Climate Ready Boston

Revision 2026-08-20-source-dates · effective 2026-07-26

Current revision. This is the snapshot used by the live entity page.

unreviewed

Created the first structured Evidence Passport with 1 claim and 13 source dossiers.

sha256:38a11a01cf3bf5d246e54b0f1b5404e5136b8659896b8b89e7a373eab9605ecb

Change set

  • add /evidencePassport — Added claim-level evidence mapping and source dossiers.
  • add /revisionHistory — Established a permanent, hash-addressed baseline revision.
1
of 1 claims mapped
13
source dossiers
4
publication dates recorded
1
archives linked
0
exact locators
0
content captures hashed

Claims, one by one

The text below is copied verbatim from the published record. Each claim names the source dossiers that carry it; caveats stay attached to the claim they qualify.

Claim 1 clm-a5e9e8025c648473 quantitative
The 2018 barrier study Boston commissioned priced an inner-harbour barrier at up to $8.7 billion and an outer one at up to $11.8 billion, assumed at least 30 years to build them, and advised against both
Published field
impact · verbatim
Mapping
mapped · no interpretation or interpolation added by this passport
What the mapping says
After the study, the city dropped the barrier idea and turned to shore-based work.
Caveat
The Conservation Law Foundation found in April 2024 that most projects due by 2030 were still missing from the capital plan running to 2029.

Sources carrying this claim

  1. UMass Boston Sustainable Solutions Lab — Feasibility of Harbor-wide Barrier Systems, May 2018 (independent study)

Source dossiers and revision state

This layer records what is known about each source, what is still missing, and the exact snapshot this page is rendering. A missing date, archive or hash stays visible as missing.

unreviewed Revision 2026-08-20-source-dates effective 2026-07-26 · created 2026-08-20

Awaiting operator and domain-expert review; publication of this revision implies neither.

sha256:38a11a01cf3bf5d246e54b0f1b5404e5136b8659896b8b89e7a373eab9605ecb
1
of 1 claims mapped
13
source dossiers
4
publication dates recorded
1
archives linked
0
exact locators
0
content captures hashed

Governance facts carried by the record

Operator
City of Boston — Office of Climate Resilience, with the Planning Department & Parks and Recreation
Actor types
city-government
Funding model
mixed
Funding description
City of Boston capital budget, developer obligations under Article 80, state and federal grants; the harbour-barrier study was sponsored by the Boston Green Ribbon Commission
Cost
Programme costs put at well over $4bn (Conservation Law Foundation, 2024); the 2026 USACE/City draft plan prices shoreline protection at $9-10.5bn
Ownership
Not recorded
Decision rights
Not recorded
Exit conditions
Not recorded

13 source dossiers

Boston Research Advisory Group — Climate Change and Sea Level Rise Projections for Boston (authority, the modelling layer) boston.gov · background

Open original source ↗

Stable source ID
src-58bf52c9603e2b0a
Publisher
Name not classified · boston.gov
Type / language
pdf · language not classified
Published
Not recorded
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-07-26
Dossier created
2026-08-20
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

The 2016 downscaled projections behind everything else, produced under UMass Boston's School for the Environment. Carries the 36 inches of sea-level rise as early as the 2070s, and the shift of severe flooding from roughly annual to monthly.

Descriptive only — not page/paragraph exact
Claims linked
Background source; no baseline claim points here
UMass Boston ScholarWorks — the BRAG report deposited openly (academic repository) scholarworks.umb.edu · background

Open original source ↗

Stable source ID
src-7bab6aa9565e0f51
Publisher
Name not classified · scholarworks.umb.edu
Type / language
web-page · language not classified
Published
Not recorded
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-07-26
Dossier created
2026-08-20
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

Confirms the projections are published in the open, not held as a consultant deliverable.

Descriptive only — not page/paragraph exact
Claims linked
Background source; no baseline claim points here
City of Boston — Climate Ready Boston releases report, December 2016 (authority) content.boston.gov · background

Open original source ↗

Stable source ID
src-c07cdc75be4f9475
Publisher
Name not classified · content.boston.gov
Type / language
web-page · language not classified
Published
Not recorded
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-07-26
Dossier created
2026-08-20
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

Launch of the programme: climate projections, vulnerability assessment, resilience initiatives, by Arcadis, Sasaki, HR&A Advisors and UMass Boston.

Descriptive only — not page/paragraph exact
Claims linked
Background source; no baseline claim points here
UMass Boston Sustainable Solutions Lab — Feasibility of Harbor-wide Barrier Systems, May 2018 (independent study) umb.edu · 1 linked claim

Open original source ↗

Stable source ID
src-2f517cc2acf9f45f
Publisher
Name not classified · umb.edu
Type / language
pdf · language not classified
Published
Not recorded
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-07-26
Dossier created
2026-08-20
Retrieved copy
No local capture recorded
Archive
Open archived copy ↗ · 2026-05-19
Content hash
No captured content hash
Locator
Open the recorded source note

The study that ended the barrier idea. Recommended by the city in 2016, sponsored by the Boston Green Ribbon Commission. Finds the barriers do not address routine tidal flooding without frequent gate closures, and flags navigation, fisheries and ecosystem harm.

Descriptive only — not page/paragraph exact
WBUR — Study advises against Boston Harbor barriers, 30 May 2018 (press) wbur.org · background

Open original source ↗

Stable source ID
src-2a39a2cfd78629e0
Publisher
Name not classified · wbur.org
Type / language
web-page · language not classified
Published
2018-05-30
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-07-26
Dossier created
2026-08-20
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

Carries the numbers sentence-level: inner-harbour barrier 'could reach $8.7 billion', outer barrier 'up to $11.8 billion' over 3.8 miles from Winthrop to Hull, 'at least 30 years' to build. Lead author Paul Kirshen: 'Right now, it doesn't make sense for the city to consider any kind of harbor-wide barrier system.' City environment chief Austin Blackmon calls it 'affirmation that we're on the right track'.

Descriptive only — not page/paragraph exact
Claims linked
Background source; no baseline claim points here
WBUR — Walsh outlines Resilient Boston Harbor, 17 October 2018 (press) wbur.org · background

Open original source ↗

Stable source ID
src-d11bc19a86fff05a
Publisher
Name not classified · wbur.org
Type / language
web-page · language not classified
Published
2018-10-17
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-07-26
Dossier created
2026-08-20
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

The formal turn to the shore-based alternative five months after the study: elevated roads, berms and open space along the 47-mile shoreline instead of a barrier.

Descriptive only — not page/paragraph exact
Claims linked
Background source; no baseline claim points here
Analyze Boston — Climate Ready Boston Sea Level Rise Inundation (open data, the licence check) data.boston.gov · background

Open original source ↗

Stable source ID
src-c3fe2d126da76b82
Publisher
Name not classified · data.boston.gov
Type / language
web-page · language not classified
Published
2017-09-22
Updated
2020-07-08
Source last checked
No source-level check date
Record last verified
2026-07-26
Dossier created
2026-08-20
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

The maps themselves, under the Open Data Commons Public Domain Dedication and License (PDDL), served as an ArcGIS GeoService REST API by Boston Maps. Scenarios: 9 inch (2030s), 21 inch (2050s), 36 inch (2070s), at high tide and at 10% and 1% annual exceedance probability. Released 22 September 2017, updated 8 July 2020.

Descriptive only — not page/paragraph exact
Claims linked
Background source; no baseline claim points here
BPDA — Article 25A, Coastal Flood Resilience Overlay District (authority, the legal consequence) bostonplans.org · background

Open original source ↗

Stable source ID
src-ef8e077e69772376
Publisher
Name not classified · bostonplans.org
Type / language
web-page · language not classified
Published
Not recorded
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-07-26
Dossier created
2026-08-20
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

The overlay's own document set. Boundary is the modelled 1% annual chance flood in 2070 with 40 inches of sea-level rise; applies to Article 80 Large and Small Project Review; requires a Sea Level Rise Design Flood Elevation with one or two feet of freeboard by use sensitivity; uses below that elevation limited to access, flood prevention, storage and parking.

Descriptive only — not page/paragraph exact
Claims linked
Background source; no baseline claim points here
A Better City — Article 25A explained (trade/civic, dates the adoption) abettercity.org · background

Open original source ↗

Stable source ID
src-c8f151e75edcb88f
Publisher
Name not classified · abettercity.org
Type / language
web-page · language not classified
Published
Not recorded
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-07-26
Dossier created
2026-08-20
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

BPDA board approval 13 September 2021, Zoning Commission adoption expected 13 October 2021; describes the new Resilience Review folded into Article 80.

Descriptive only — not page/paragraph exact
Claims linked
Background source; no baseline claim points here
City of Boston — Coastal Resilience Implementation (authority, what is actually built) boston.gov · background

Open original source ↗

Stable source ID
src-dbfd91d3a580e541
Publisher
Name not classified · boston.gov
Type / language
web-page · language not classified
Published
Not recorded
Updated
2026-06-01
Source last checked
No source-level check date
Record last verified
2026-07-26
Dossier created
2026-08-20
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

Completed: Martin's Park (2019), Langone Park and Puopolo Playground (2020), McConnell Park (July 2022), Piers Park Phase II (2023). In construction or design: Ryan Playground, Moakley Park, Tenean Beach, Lewis Street and Carlton Wharf, Long Wharf, Fort Point Channel. Run by the Office of Climate Resilience with the Planning and Parks departments.

Descriptive only — not page/paragraph exact
Claims linked
Background source; no baseline claim points here
City of Boston — North End, Dorchester and South Boston park improvements completed, 2021 (authority) boston.gov · background

Open original source ↗

Stable source ID
src-034c5bbd8882a375
Publisher
Name not classified · boston.gov
Type / language
web-page · language not classified
Published
Not recorded
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-07-26
Dossier created
2026-08-20
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

Langone Park and Puopolo Playground reopened February 2021 at about $15 million in public and private funds: inland secondary seawall, Harborwalk raised four feet, fields lifted out of the flood zone. The first Boston park built to the city's Climate Resilient Design Standards.

Descriptive only — not page/paragraph exact
Claims linked
Background source; no baseline claim points here
Conservation Law Foundation — What happened to Climate Ready Boston?, 24 April 2024 (independent scrutiny) clf.org · background

Open original source ↗

Stable source ID
src-e886914437109b0e
Publisher
Name not classified · clf.org
Type / language
web-page · language not classified
Published
2024-04-24
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-07-26
Dossier created
2026-08-20
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

The counterweight: 'Most of the climate projects recommended for completion by 2030 have yet to be included in Boston's recent capital plans', including the plan through 2029; costs 'well over $4 billion'; leaning on developers is called 'an inefficient, piecemeal approach toward resilience'.

Descriptive only — not page/paragraph exact
Claims linked
Background source; no baseline claim points here
City of Boston — Plan summary: Boston Coastal Storm Risk Management study, July 2026 (authority, currency) boston.gov · background

Open original source ↗

Stable source ID
src-8c9df50b65cb376e
Publisher
Name not classified · boston.gov
Type / language
web-page · language not classified
Published
Not recorded
Updated
2026-07-20
Source last checked
No source-level check date
Record last verified
2026-07-26
Dossier created
2026-08-20
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

2026 currency: the joint US Army Corps of Engineers and City draft plan released 24 July 2026, comment to 18 September 2026, final to Congress in 2028. Shoreline protection across 16 of the 47 coastal miles in the five Climate Ready neighbourhoods, $9-10.5 billion against roughly $41 billion of prevented damage. Still shore-based, not a barrier.

Descriptive only — not page/paragraph exact
Claims linked
Background source; no baseline claim points here
Known limits of this passport
  • Publisher names and source languages have not yet been classified; domains are recorded without guessing.
  • Existing source notes are descriptive locators, not page- or paragraph-exact citations.
  • A missing archive, publication date or content hash is shown as null rather than inferred.
  • The project-level evidence grade ranks the strongest source in the entry; it is not a truth score for every claim.