Namma Metro Yellow Line: A Finished Line Waiting for Its Trains

Revision 2026-08-20-source-dates · effective 2026-07-26

Superseded. A later revision exists: 2026-08-20-source-dates-2 →

unreviewed

Created the first structured Evidence Passport with 1 claim and 7 source dossiers.

sha256:298e1da1d2e385d108134580eb9ee23120fea45894f4ccec1ff15a4e34f4521b

Change set

  • add /evidencePassport — Added claim-level evidence mapping and source dossiers.
  • add /revisionHistory — Established a permanent, hash-addressed baseline revision.
1
of 1 claims mapped
7
source dossiers
6
publication dates recorded
1
archives linked
0
exact locators
0
content captures hashed

Claims, one by one

The text below is copied verbatim from the published record. Each claim names the source dossiers that carry it; caveats stay attached to the claim they qualify.

Claim 1 clm-9a6f0a11ec154d3b quantitative
The Takshashila Institution estimates the delay cost 1,866 crore rupees against the 410 crore saved by taking the cheapest bid — more than eight times the original price advantage — with the line finishing 32 per cent over budget
Published field
impact · verbatim
Mapping
mapped · no interpretation or interpolation added by this passport
What the mapping says
No support note recorded
Caveat
No claim-specific caveat recorded

Sources carrying this claim

  1. Takshashila Institution — Geopolitics of Bengaluru's Yellow Metro Line (9 Sept 2025)

Source dossiers and revision state

This layer records what is known about each source, what is still missing, and the exact snapshot this page is rendering. A missing date, archive or hash stays visible as missing.

unreviewed Revision 2026-08-20-source-dates effective 2026-07-26 · created 2026-08-20

Awaiting operator and domain-expert review; publication of this revision implies neither.

sha256:298e1da1d2e385d108134580eb9ee23120fea45894f4ccec1ff15a4e34f4521b
1
of 1 claims mapped
7
source dossiers
6
publication dates recorded
1
archives linked
0
exact locators
0
content captures hashed

Governance facts carried by the record

Operator
Bangalore Metro Rail Corporation Limited (BMRCL)
Actor types
utility
Funding model
public
Funding description
Not recorded
Cost
Not recorded
Ownership
Not recorded
Decision rights
Not recorded
Exit conditions
Not recorded

7 source dossiers

Takshashila Institution — Geopolitics of Bengaluru's Yellow Metro Line (9 Sept 2025) takshashila.org.in · 1 linked claim

Open original source ↗

Stable source ID
src-b3f70831c70dc965
Publisher
Name not classified · takshashila.org.in
Type / language
web-page · language not classified
Published
2025-09-09
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-07-26
Dossier created
2026-08-20
Retrieved copy
No local capture recorded
Archive
Open archived copy ↗ · 2026-03-07
Content hash
No captured content hash
Locator
Open the recorded source note

Independent think-tank analysis and the load-bearing source for the delay chain: the December 2019 coach contract as the cheapest bid, the local-content rule, the 2020 border clash and the new security-clearance requirement, the 2022 pivot to an Indian joint venture, visas cleared only in December 2023, structures complete by late 2023, opening 11 August 2025 with 3 of 15 trainsets. Carries the impact figure.

Descriptive only — not page/paragraph exact
Siemens Mobility — CBTC and automated train technology for Bengaluru Metro (10 Dec 2020) press.siemens.com · background

Open original source ↗

Stable source ID
src-70e277425e6e4d49
Publisher
Name not classified · press.siemens.com
Type / language
web-page · language not classified
Published
2020-12-10
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-07-26
Dossier created
2026-08-20
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

Supplier primary source: CBTC with automatic train protection and supervision. States it will be the first such project in India rated for unattended operation — a capability claim by the vendor, not evidence of how the line actually runs.

Descriptive only — not page/paragraph exact
Claims linked
Background source; no baseline claim points here
Railway Gazette International — Yellow Line inaugurated (Aug 2025) railwaygazette.com · background

Open original source ↗

Stable source ID
src-b7643355ea901d7d
Publisher
Name not classified · railwaygazette.com
Type / language
web-page · language not classified
Published
2025-08-12
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-07-26
Dossier created
2026-08-20
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

Decisive on the automation question: the trains are capable of unattended operation, but initially run in semi-automatic mode with a driver in the cab, to be upgraded after systems integration and regulatory approval. Direct fetch returned 403; outlet, article and these sentences confirmed through two independent search passes.

Descriptive only — not page/paragraph exact
Claims linked
Background source; no baseline claim points here
Metro Rail Today — Yellow Line inaugurated, network expands to 76 km metrorailtoday.com · background

Open original source ↗

Stable source ID
src-43e405e543c283fc
Publisher
Name not classified · metrorailtoday.com
Type / language
web-page · language not classified
Published
Not recorded
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-07-26
Dossier created
2026-08-20
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

Trade press for the launch facts: inaugurated 10 August 2025, 19.14 km, 16 stations, interchange with the Green Line, network to 76 km. Cites a project cost higher than the Takshashila figure.

Descriptive only — not page/paragraph exact
Claims linked
Background source; no baseline claim points here
Metro Rail News — 13th trainset delivered for the Yellow Line (June 2026) metrorailnews.in · background

Open original source ↗

Stable source ID
src-344b0ebd5f1eacf6
Publisher
Name not classified · metrorailnews.in
Type / language
web-page · language not classified
Published
2026-06-17
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-07-26
Dossier created
2026-08-20
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

Most recent operational status: 13th six-coach set handed over 15 June 2026; 10 trains in service at a 7-minute peak headway; all 15 expected by August 2026.

Descriptive only — not page/paragraph exact
Claims linked
Background source; no baseline claim points here
Asianet Newsable — Yellow Line technical snag halts service for 40 minutes (22 Sept 2025) newsable.asianetnews.com · background

Open original source ↗

Stable source ID
src-a2fadffb7122292a
Publisher
Name not classified · newsable.asianetnews.com
Type / language
web-page · language not classified
Published
2025-09-22
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-07-26
Dossier created
2026-08-20
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

Counterweight: a roughly 40-minute evening disruption acknowledged by the operator. Also confirms the headway sequence: three trains every 25 minutes at opening, a fourth cutting the wait to about 19 minutes.

Descriptive only — not page/paragraph exact
Claims linked
Background source; no baseline claim points here
Deccan Herald — Yellow Line sustains 60k ridership despite low frequency deccanherald.com · background

Open original source ↗

Stable source ID
src-fb67eea454bc5e0a
Publisher
Name not classified · deccanherald.com
Type / language
web-page · language not classified
Published
2025-08-31
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-07-26
Dossier created
2026-08-20
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

Ridership since opening: an average of about 60,000 a day, rising 5 to 6 per cent when a fourth trainset cut the headway. Outlet blocks automated fetching; headline and figures confirmed through search.

Descriptive only — not page/paragraph exact
Claims linked
Background source; no baseline claim points here
Known limits of this passport
  • Publisher names and source languages have not yet been classified; domains are recorded without guessing.
  • Existing source notes are descriptive locators, not page- or paragraph-exact citations.
  • A missing archive, publication date or content hash is shown as null rather than inferred.
  • The project-level evidence grade ranks the strongest source in the entry; it is not a truth score for every claim.