clm-66d896bda2c28f66
quantitative
Virgin Media Business, appointed in March 2020
Permanent project revision
Revision 2026-10-16-baseline · effective 2026-10-16
Current revision. This is the snapshot used by the live entity page.
Created the first structured Evidence Passport with 27 claims and 7 source dossiers.
sha256:f6173652c4cff2b8927489b75470148f23ad4d598802431e831c59d715a7ec40
add /evidencePassport — Added claim-level evidence mapping and source dossiers.add /revisionHistory — Established a permanent, hash-addressed baseline revision.The text below is copied verbatim from the published record. Each claim names the source dossiers that carry it; caveats stay attached to the claim they qualify.
clm-66d896bda2c28f66
quantitative
Virgin Media Business, appointed in March 2020
clm-51b6596548ea312a
quantitative
built by 2022
clm-d37c0c86e7e93b9f
quantitative
roughly 2,700 km of cable linking around 1,600 sites
clm-b73f5bbea2e183d5
descriptive
from council offices, schools and libraries to roadside cabinets at traffic signals
clm-4ce8fdce90d3f44a
quantitative
The £23.8 million project was the largest funded in the national LFFN programme
clm-9a88eef61ac17bc7
quantitative
they bought 30-year rights to use it
clm-834954cb2e81925c
descriptive
the supplier owns and manages the cable
clm-098f7439617f350e
quantitative
Since late 2024 the GM One Network, built and operated by Cisco
clm-79b811eff81931bf
descriptive
under a collaboration agreement led by GMCA
clm-b71c3ce0ea0f0abd
descriptive
has lit it for TfGM, the fire service and four councils
clm-3863e2ed5ac29c77
descriptive
In Manchester the procurement covered TfGM's traffic-control assets
clm-fd8294862ba54aaa
descriptive
the city council, whose area already had fibre networks
clm-98f4189b4e200560
quantitative
took a £5,000-per-site building-upgrade grant for 167 sites instead
clm-1621b40b01b5444c
descriptive
is not a GM One partner
clm-43aed29345f48909
quantitative
about 95% of signal junctions are connected
clm-ad3a0529706056b9
quantitative
with fibre at more than 700 signalised junctions it has grown its highway CCTV from around 80 cameras to more than 200
clm-820e914a430161c8
descriptive
it also reported a "dramatic reduction" in network faults
clm-f6b682a1454c5214
quantitative
GMCA's 2022 business case forecast savings of £3.7M against existing spend
clm-e8d0933609c0c37b
quantitative
its October 2024 update counted £6.6M of savings or avoided cost over ten years
clm-013267591e4c7a3b
quantitative
for the fire service the 2022 paper itself called the saving modest, up to £5.67M over ten years against £6.00M
clm-a231a27537e03f39
descriptive
none of its interviewees could robustly estimate the savings
clm-09f266e0266c707a
descriptive
Stockport Council put its own at "hundreds of thousands of pounds annually"
clm-52bebed52db5bad8
descriptive
Greater Manchester's DCMS grant obliged the partners to light the cable
clm-cf3c1f0d69e16b33
descriptive
the savings they report come from the second, self-funded step of doing that together through GM One
clm-5654651cc3ae4d2a
descriptive
extending the network means asking the commercial owner for a price
clm-2723859ed99517c7
descriptive
which it contrasts with publicly owned networks in Colchester, the North Isles and North Yorkshire
clm-10b6a5c237773780
descriptive
the region's core city, with its own wide-area network contract, is not on it
This layer records what is known about each source, what is still missing, and the exact snapshot this page is rendering. A missing date, archive or hash stays visible as missing.
Awaiting operator and domain-expert review; publication of this revision implies neither.
sha256:f6173652c4cff2b8927489b75470148f23ad4d598802431e831c59d715a7ec40
src-ee5ef705b8889149Case study in the national LFFN evaluation, conducted for BDUK and DCMS by GC Insight, Belmana and Darren Kilburn, based on five stakeholder interviews. States that the £23.8 million project, including £18.8m of LFFN funding, was the largest funded in the programme; that Virgin Media Business laid approximately 2,700 km of fibre to around 1,600 sites with all work completed by 2022; that Cisco built and operates GM One, completed in late 2024; that the founding partners are GMCA, TfGM and Stockport, Bury, Oldham and Rochdale councils; that the LFFN fibre is owned and managed by a commercial supplier; that about 95% of signal junctions are connected and TfGM's CCTV grew from around 80 to more than 200 cameras; and that no interviewee could robustly estimate the savings.
clm-51b6596548ea312aclm-d37c0c86e7e93b9fclm-b73f5bbea2e183d5clm-4ce8fdce90d3f44aclm-834954cb2e81925cclm-098f7439617f350eclm-79b811eff81931bfclm-b71c3ce0ea0f0abdclm-1621b40b01b5444cclm-43aed29345f48909clm-ad3a0529706056b9clm-820e914a430161c8clm-a231a27537e03f39clm-09f266e0266c707aclm-cf3c1f0d69e16b33clm-5654651cc3ae4d2aclm-2723859ed99517c7clm-10b6a5c237773780src-dbc132093d19bcebGMCA report on the tender outcome. States that public sector partners get 30 years of connectivity instead of 20 for the same cost through 50% longer Indefeasible Rights of Use; that the provider will deliver up to 2,717 km of new full fibre with 97% provided via existing ducting and an estimated 9 km of new dig; and that public services will be free to procure services from any provider across the open access network.
src-02555876a30a9ba3GMCA report on the Public Sector Building Upgrade element. Names the seven anchor-tenancy councils (Bolton, Bury, Oldham, Rochdale, Stockport, Trafford, Wigan); states that Manchester City Council, where there were already considerable fibre networks, would receive a flat-rate grant of £5,000 per eligible site, proposing 167 sites with £835,000 of DCMS grant, procured by the council itself as part of a wider strategic ICT procurement and a longer-term WAN contract.
src-6408c10000e584b4GMCA report seeking approval for GM One Network. Sets out the joint procurement by GMCA (including fire and rescue), TfGM and Bury, Oldham, Rochdale and Stockport councils; Cisco as preferred integrator; a 10-year cost of up to £22.54M; that the DCMS grant requires the fibre to be used; savings of £3.7M against current spend; the fire service's cost of up to £5.67M over ten years against £6.00M, described as 'only a modest saving'; connecting 775 urban traffic control signal sites; and that related fibre work led by Manchester City Council was connecting 130 further sites.
src-f6415b51c052d4caGMCA report on extending GM One Network to sites not on the LFFN. States that LFFN provides fibre connections to c.1,600 sites until 2050, supported by Virgin Media O2; that c.1,200 sites have migrated to GM One across six organisations (four localities plus GMCA and TfGM); £6.6M of savings or avoided alternative cost over a 10-year period; and a £2M connectivity contract with Vodafone.
src-a3f8d039c8bb49eeGMCA report on the LFFN programme. Records the £23.7M DCMS award of March 2018 to connect over 1,300 public sector sites; the three elements of the bid (anchor tenancy, a tactical public sector building upgrade for Manchester City Council 'where there was already considerable fibre networks and risk of overbuild', and the Tameside cooperative); that the Southern Arc lot covered GMCA/TfGM urban traffic control and assets in Stockport, Trafford, Salford and Manchester; full-fibre coverage by borough in September 2019 (Manchester 10.92%); and the £835,000 grant allocation to Manchester City Council.
src-aaa88b3859ee02dcTrade-press report of GMCA's appointment of Virgin Media to deliver the LFFN project: up to 2,700 km of fibre to serve 1,700 public sector sites, new connections in Bury, Bolton, Oldham, Rochdale, Stockport, Trafford and Wigan, and more than 180 public sites in Salford and Manchester to see their connectivity upgraded.