 "schemaVersion": "1.0.0",
 "constitutionVersion": "1.0.0",
 "createdAt": "2026-08-12T00:00:00Z",
 "description": "Append-only Evidence Passport records. Old revisions are immutable; corrections create a new revision and preserve the previous permalink.",
 "entity": {
  "type": "project",
  "id": "greater-manchester-full-fibre-network",
  "title": "Greater Manchester's Shared Public-Sector Fibre and the GM One Network",
  "canonicalUrl": "https://1001smartcities.org/projects/greater-manchester-full-fibre-network/"
 },
 "currentRevisionId": "2026-10-16-baseline",
 "revisions": [
  {
   "id": "2026-10-16-baseline",
   "createdAt": "2026-10-16T10:01:46Z",
   "effectiveAt": "2026-10-16",
   "changeType": "baseline",
   "summary": "Created the first structured Evidence Passport with 27 claims and 7 source dossiers.",
   "preparedBy": {
    "type": "automation",
    "label": "AI-assisted evidence preparation",
    "humanApproved": false
   },
   "review": {
    "status": "unreviewed",
    "by": null,
    "date": null,
    "note": "Awaiting operator and domain-expert review; publication of this revision implies neither."
   },
   "changes": [
    {
     "operation": "add",
     "path": "/evidencePassport",
     "summary": "Added claim-level evidence mapping and source dossiers."
    },
    {
     "operation": "add",
     "path": "/revisionHistory",
     "summary": "Established a permanent, hash-addressed baseline revision."
    }
   ],
   "snapshotHash": "sha256:f6173652c4cff2b8927489b75470148f23ad4d598802431e831c59d715a7ec40",
   "snapshot": {
    "asOf": "2026-10-16",
    "projectFingerprint": "sha256:7831821bff7bee6dd338bc6afad8f7e7b061fc0dd5024554111d32923a4e3109",
    "assurance": {
     "status": "unreviewed",
     "scope": "evidence-passport-revision",
     "statement": "AI-assisted structural preparation. This revision has not been reviewed by a human or subject-matter expert.",
     "machineChecks": [
      "schema",
      "publication-diff-contract",
      "material-project-fingerprint",
      "claim-text-drift",
      "source-reference-resolution",
      "complete-source-dossier",
      "snapshot-hash"
     ]
    },
    "projectState": {
     "status": "live",
     "outcome": "ongoing",
     "evidenceGrade": "independent",
     "timeline": {
      "started": 2020,
      "ended": null
     }
    },
    "governance": {
     "operator": "Greater Manchester Combined Authority (lead contracting authority) with TfGM, Greater Manchester Fire and Rescue Service and Bury, Oldham, Rochdale and Stockport councils; fibre owned and managed by Virgin Media O2 (Virgin Media Business); GM One built and operated by Cisco",
     "actorTypes": [
      "regional-government",
      "city-government",
      "national-government",
      "private"
     ],
     "fundingModel": "mixed",
     "fundingDescription": "£23.8 million LFFN project including £18.8m of national LFFN funding (DCMS), with capital from GMCA (fire and rescue), TfGM and seven councils buying 30-year rights of use; GM One Network (up to £22.54M over ten years) self-funded by its partners. Manchester City Council: £835,000 DCMS building-upgrade grant.",
     "cost": null,
     "ownership": null,
     "decisionRights": null,
     "exitConditions": null
    },
    "claims": [
     {
      "id": "clm-66d896bda2c28f66",
      "field": "snippet",
      "text": "Virgin Media Business, appointed in March 2020",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-aaa88b3859ee02dc"
      ],
      "supportNote": "ISPreview reported on 16 March 2020 that GMCA had chosen Virgin Media's business division to deliver the LFFN project.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-51b6596548ea312a",
      "field": "snippet",
      "text": "built by 2022",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-ee5ef705b8889149"
      ],
      "supportNote": "The national evaluation states that Virgin Media Business designed and built the network, with all work completed by 2022.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-d37c0c86e7e93b9f",
      "field": "snippet",
      "text": "roughly 2,700 km of cable linking around 1,600 sites",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-ee5ef705b8889149"
      ],
      "supportNote": "The evaluation reports approximately 2,700 km of new fibre-optic cable creating a dark-fibre network that connected around 1,600 sites.",
      "caveat": "The site count moved during the programme: the 2018 bid aimed at over 1,300 sites, the 2020 appointment at 1,700, later releases at more than 1,500.",
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-b73f5bbea2e183d5",
      "field": "snippet",
      "text": "from council offices, schools and libraries to roadside cabinets at traffic signals",
      "statementKind": "descriptive",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-ee5ef705b8889149"
      ],
      "supportNote": "The evaluation lists council offices, schools, libraries, community buildings and children's centres alongside unmanned sites such as roadside cabinets, and reports that about 95% of signal junctions are connected.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-4ce8fdce90d3f44a",
      "field": "snippet",
      "text": "The £23.8 million project was the largest funded in the national LFFN programme",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-ee5ef705b8889149"
      ],
      "supportNote": "The evaluation gives a total project value of £23.8 million, including £18.8m of LFFN programme funding, making it the largest funded project in the programme.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-9a88eef61ac17bc7",
      "field": "snippet",
      "text": "they bought 30-year rights to use it",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-dbc132093d19bceb",
       "src-f6415b51c052d4ca"
      ],
      "supportNote": "GMCA's January 2020 report says partners get 30 years of connectivity through Indefeasible Rights of Use for the cost originally calculated on 20 years; the October 2024 report says the fibre connections run until 2050.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-834954cb2e81925c",
      "field": "snippet",
      "text": "the supplier owns and manages the cable",
      "statementKind": "descriptive",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-ee5ef705b8889149"
      ],
      "supportNote": "The evaluation states that in Greater Manchester the LFFN fibre is owned and managed by a commercial supplier.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-098f7439617f350e",
      "field": "snippet",
      "text": "Since late 2024 the GM One Network, built and operated by Cisco",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-ee5ef705b8889149"
      ],
      "supportNote": "The evaluation states that Cisco was awarded the contract to build and operate GM One and that the build was completed in late 2024.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-79b811eff81931bf",
      "field": "snippet",
      "text": "under a collaboration agreement led by GMCA",
      "statementKind": "descriptive",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-ee5ef705b8889149"
      ],
      "supportNote": "The evaluation says GM One is owned collectively by the participating organisations under a formal collaboration agreement, with GMCA as lead contracting authority.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-b71c3ce0ea0f0abd",
      "field": "snippet",
      "text": "has lit it for TfGM, the fire service and four councils",
      "statementKind": "descriptive",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-ee5ef705b8889149",
       "src-6408c10000e584b4"
      ],
      "supportNote": "The evaluation lists the founding partners as of January 2026; the 2022 GMCA report describes GM One as the joint service to light the LFFN fibre for these partners.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-3863e2ed5ac29c77",
      "field": "snippet",
      "text": "In Manchester the procurement covered TfGM's traffic-control assets",
      "statementKind": "descriptive",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-a3f8d039c8bb49ee"
      ],
      "supportNote": "GMCA's 2019 report says the Southern Arc lot covered GMCA/TfGM urban traffic control and assets in Stockport and Trafford as well as in the Salford and Manchester local authority areas.",
      "caveat": "This is the procurement scope; no source gives a count of connected signal sites inside the City of Manchester.",
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-fd8294862ba54aaa",
      "field": "snippet",
      "text": "the city council, whose area already had fibre networks",
      "statementKind": "descriptive",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-02555876a30a9ba3"
      ],
      "supportNote": "GMCA's December 2020 report describes the Manchester element as a tactical upgrade for a council area where there was already considerable fibre and a risk of overbuild.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-98f4189b4e200560",
      "field": "snippet",
      "text": "took a £5,000-per-site building-upgrade grant for 167 sites instead",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-02555876a30a9ba3"
      ],
      "supportNote": "The December 2020 report states a flat-rate grant of £5,000 per eligible site and that Manchester City Council proposed 167 sites using £835,000 of the DCMS grant.",
      "caveat": "In March 2022 GMCA reported this council-led work as due to complete shortly, connecting 130 sites.",
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-1621b40b01b5444c",
      "field": "snippet",
      "text": "is not a GM One partner",
      "statementKind": "descriptive",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-ee5ef705b8889149"
      ],
      "supportNote": "The evaluation lists the four member councils and states that the other districts are not yet connected.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-43aed29345f48909",
      "field": "impact",
      "text": "about 95% of signal junctions are connected",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-ee5ef705b8889149"
      ],
      "supportNote": "The evaluation reports a TfGM interviewee's statement that approximately 95% of signal junctions are connected to LFFN.",
      "caveat": "An interviewee's statement for the whole region, not a published count.",
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-ad3a0529706056b9",
      "field": "impact",
      "text": "with fibre at more than 700 signalised junctions it has grown its highway CCTV from around 80 cameras to more than 200",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-ee5ef705b8889149"
      ],
      "supportNote": "The evaluation reports that TfGM had around 80 highway cameras before LFFN, that fibre is now available at more than 700 signalised junctions, and that the CCTV estate has grown to more than 200 cameras.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-820e914a430161c8",
      "field": "impact",
      "text": "it also reported a \"dramatic reduction\" in network faults",
      "statementKind": "descriptive",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-ee5ef705b8889149"
      ],
      "supportNote": "The evaluation quotes TfGM reporting a dramatic reduction in network faults and outages after moving to the shared network; no figure is given.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-f6b682a1454c5214",
      "field": "impact",
      "text": "GMCA's 2022 business case forecast savings of £3.7M against existing spend",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-6408c10000e584b4"
      ],
      "supportNote": "The March 2022 report lists overall financial savings of £3.7M against current spend levels among the benefits of the procurement.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-e8d0933609c0c37b",
      "field": "impact",
      "text": "its October 2024 update counted £6.6M of savings or avoided cost over ten years",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-f6415b51c052d4ca"
      ],
      "supportNote": "The October 2024 report states £6.6M of savings or avoided alternative cost over a 10-year period.",
      "caveat": "A ten-year projection by the operator; the report does not state the method.",
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-013267591e4c7a3b",
      "field": "impact",
      "text": "for the fire service the 2022 paper itself called the saving modest, up to £5.67M over ten years against £6.00M",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-6408c10000e584b4"
      ],
      "supportNote": "The March 2022 report puts the fire service's current WAN spend over ten years at £6.00M against up to £5.67M via GM One, and calls this only a modest saving.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-a231a27537e03f39",
      "field": "impact",
      "text": "none of its interviewees could robustly estimate the savings",
      "statementKind": "descriptive",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-ee5ef705b8889149"
      ],
      "supportNote": "The evaluation states that none of the interviewees were able to robustly estimate the scale of savings.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-09f266e0266c707a",
      "field": "impact",
      "text": "Stockport Council put its own at \"hundreds of thousands of pounds annually\"",
      "statementKind": "descriptive",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-ee5ef705b8889149"
      ],
      "supportNote": "The evaluation quotes Stockport Council saying the move to GM One had saved it hundreds of thousands of pounds annually.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-52bebed52db5bad8",
      "field": "lesson",
      "text": "Greater Manchester's DCMS grant obliged the partners to light the cable",
      "statementKind": "descriptive",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-6408c10000e584b4"
      ],
      "supportNote": "The March 2022 report says GMCA and the participating authorities committed to using the fibre under the grant agreement, and that not lighting it could require repayment of the DCMS funding.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-cf3c1f0d69e16b33",
      "field": "lesson",
      "text": "the savings they report come from the second, self-funded step of doing that together through GM One",
      "statementKind": "descriptive",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-ee5ef705b8889149"
      ],
      "supportNote": "The evaluation says GM One received no other central government funding, was self-funded by partners, and attributes the WAN cost savings to consolidation on the shared platform.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-5654651cc3ae4d2a",
      "field": "lesson",
      "text": "extending the network means asking the commercial owner for a price",
      "statementKind": "descriptive",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-ee5ef705b8889149"
      ],
      "supportNote": "The evaluation reports that because a commercial supplier owns the fibre, extending or adapting the network requires commercial negotiation, the supplier will 'give us a price'.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-2723859ed99517c7",
      "field": "lesson",
      "text": "which it contrasts with publicly owned networks in Colchester, the North Isles and North Yorkshire",
      "statementKind": "descriptive",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-ee5ef705b8889149"
      ],
      "supportNote": "The evaluation contrasts this with models where the public sector directly owns and controls the infrastructure, naming Colchester, North Isles and North Yorkshire.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-10b6a5c237773780",
      "field": "lesson",
      "text": "the region's core city, with its own wide-area network contract, is not on it",
      "statementKind": "descriptive",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-02555876a30a9ba3",
       "src-ee5ef705b8889149"
      ],
      "supportNote": "GMCA's December 2020 report says Manchester City Council procured its upgrade within a wider strategic ICT procurement and a longer-term WAN contract; the evaluation lists GM One's members without Manchester.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     }
    ],
    "sources": [
     {
      "id": "src-ee5ef705b8889149",
      "title": "Building Digital UK / DCMS — Local Full Fibre Networks evaluation, work package three: Greater Manchester PSAT case study (10 Sep 2026)",
      "url": "https://www.gov.uk/government/publications/local-full-fibre-networks-evaluation-work-package-three-report/greater-manchester-psat-case-study",
      "publisher": {
       "name": null,
       "domain": "gov.uk",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-51b6596548ea312a",
       "clm-d37c0c86e7e93b9f",
       "clm-b73f5bbea2e183d5",
       "clm-4ce8fdce90d3f44a",
       "clm-834954cb2e81925c",
       "clm-098f7439617f350e",
       "clm-79b811eff81931bf",
       "clm-b71c3ce0ea0f0abd",
       "clm-1621b40b01b5444c",
       "clm-43aed29345f48909",
       "clm-ad3a0529706056b9",
       "clm-820e914a430161c8",
       "clm-a231a27537e03f39",
       "clm-09f266e0266c707a",
       "clm-cf3c1f0d69e16b33",
       "clm-5654651cc3ae4d2a",
       "clm-2723859ed99517c7",
       "clm-10b6a5c237773780"
      ],
      "temporal": {
       "publishedAt": "2026-09-10",
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-10-16",
       "dossierCreatedAt": "2026-10-16",
       "retrievedAt": null,
       "status": "publication-and-record-dates-recorded"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Case study in the national LFFN evaluation, conducted for BDUK and DCMS by GC Insight, Belmana and Darren Kilburn, based on five stakeholder interviews. States that the £23.8 million project, including £18.8m of LFFN funding, was the largest funded in the programme; that Virgin Media Business laid approximately 2,700 km of fibre to around 1,600 sites with all work completed by 2022; that Cisco built and operates GM One, completed in late 2024; that the founding partners are GMCA, TfGM and Stockport, Bury, Oldham and Rochdale councils; that the LFFN fibre is owned and managed by a commercial supplier; that about 95% of signal junctions are connected and TfGM's CCTV grew from around 80 to more than 200 cameras; and that no interviewee could robustly estimate the savings.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-dbc132093d19bceb",
      "title": "Greater Manchester Combined Authority — Greater Manchester Local Full Fibre Network Programme, Part A report (7 Jan 2020)",
      "url": "https://democracy.greatermanchester-ca.gov.uk/documents/s4444/FINAL%20GMCA%20PART%20A%20REPORT%20LFFN.pdf",
      "publisher": {
       "name": null,
       "domain": "democracy.greatermanchester-ca.gov.uk",
       "classification": "not-classified"
      },
      "sourceType": "pdf",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-9a88eef61ac17bc7"
      ],
      "temporal": {
       "publishedAt": "2020-01-07",
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-10-16",
       "dossierCreatedAt": "2026-10-16",
       "retrievedAt": null,
       "status": "publication-and-record-dates-recorded"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "GMCA report on the tender outcome. States that public sector partners get 30 years of connectivity instead of 20 for the same cost through 50% longer Indefeasible Rights of Use; that the provider will deliver up to 2,717 km of new full fibre with 97% provided via existing ducting and an estimated 9 km of new dig; and that public services will be free to procure services from any provider across the open access network.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-02555876a30a9ba3",
      "title": "Greater Manchester Combined Authority — LFFN Programme: Public Sector Building Upgrade (18 Dec 2020)",
      "url": "https://democracy.greatermanchester-ca.gov.uk/documents/s11125/16%20Local%20Full%20Fibre%20Network%20PSBU%20report%20December%202020.pdf",
      "publisher": {
       "name": null,
       "domain": "democracy.greatermanchester-ca.gov.uk",
       "classification": "not-classified"
      },
      "sourceType": "pdf",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-fd8294862ba54aaa",
       "clm-98f4189b4e200560",
       "clm-10b6a5c237773780"
      ],
      "temporal": {
       "publishedAt": "2020-12-18",
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-10-16",
       "dossierCreatedAt": "2026-10-16",
       "retrievedAt": null,
       "status": "publication-and-record-dates-recorded"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "GMCA report on the Public Sector Building Upgrade element. Names the seven anchor-tenancy councils (Bolton, Bury, Oldham, Rochdale, Stockport, Trafford, Wigan); states that Manchester City Council, where there were already considerable fibre networks, would receive a flat-rate grant of £5,000 per eligible site, proposing 167 sites with £835,000 of DCMS grant, procured by the council itself as part of a wider strategic ICT procurement and a longer-term WAN contract.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-6408c10000e584b4",
      "title": "Greater Manchester Combined Authority — Greater Manchester One Network Procurement, Part A report (25 Mar 2022)",
      "url": "https://democracy.greatermanchester-ca.gov.uk/documents/s20128/21%20GM%20One%20Network%20GMCA%20Part%20A%20March%202022.pdf",
      "publisher": {
       "name": null,
       "domain": "democracy.greatermanchester-ca.gov.uk",
       "classification": "not-classified"
      },
      "sourceType": "pdf",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-b71c3ce0ea0f0abd",
       "clm-f6b682a1454c5214",
       "clm-013267591e4c7a3b",
       "clm-52bebed52db5bad8"
      ],
      "temporal": {
       "publishedAt": "2022-03-25",
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-10-16",
       "dossierCreatedAt": "2026-10-16",
       "retrievedAt": null,
       "status": "publication-and-record-dates-recorded"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "GMCA report seeking approval for GM One Network. Sets out the joint procurement by GMCA (including fire and rescue), TfGM and Bury, Oldham, Rochdale and Stockport councils; Cisco as preferred integrator; a 10-year cost of up to £22.54M; that the DCMS grant requires the fibre to be used; savings of £3.7M against current spend; the fire service's cost of up to £5.67M over ten years against £6.00M, described as 'only a modest saving'; connecting 775 urban traffic control signal sites; and that related fibre work led by Manchester City Council was connecting 130 further sites.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-f6415b51c052d4ca",
      "title": "Greater Manchester Combined Authority — GM One Network Connectivity Partner Procurement (25 Oct 2024)",
      "url": "https://democracy.greatermanchester-ca.gov.uk/documents/s34381/12%20GM%20One%20Network%20Non%20LFFN%20Board%20Paper%20Lot%201%20Final.pdf",
      "publisher": {
       "name": null,
       "domain": "democracy.greatermanchester-ca.gov.uk",
       "classification": "not-classified"
      },
      "sourceType": "pdf",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-9a88eef61ac17bc7",
       "clm-e8d0933609c0c37b"
      ],
      "temporal": {
       "publishedAt": "2024-10-25",
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-10-16",
       "dossierCreatedAt": "2026-10-16",
       "retrievedAt": null,
       "status": "publication-and-record-dates-recorded"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "GMCA report on extending GM One Network to sites not on the LFFN. States that LFFN provides fibre connections to c.1,600 sites until 2050, supported by Virgin Media O2; that c.1,200 sites have migrated to GM One across six organisations (four localities plus GMCA and TfGM); £6.6M of savings or avoided alternative cost over a 10-year period; and a £2M connectivity contract with Vodafone.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-a3f8d039c8bb49ee",
      "title": "Greater Manchester Combined Authority — LFFN programme report to the Corporate Issues and Reform Overview & Scrutiny Committee (15 Oct 2019)",
      "url": "https://democracy.greatermanchester-ca.gov.uk/documents/s2761/FINAL%20SCRUTINY%20REPORT%20LFFN%20October%202019.pdf",
      "publisher": {
       "name": null,
       "domain": "democracy.greatermanchester-ca.gov.uk",
       "classification": "not-classified"
      },
      "sourceType": "pdf",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-3863e2ed5ac29c77"
      ],
      "temporal": {
       "publishedAt": "2019-10-15",
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-10-16",
       "dossierCreatedAt": "2026-10-16",
       "retrievedAt": null,
       "status": "publication-and-record-dates-recorded"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "GMCA report on the LFFN programme. Records the £23.7M DCMS award of March 2018 to connect over 1,300 public sector sites; the three elements of the bid (anchor tenancy, a tactical public sector building upgrade for Manchester City Council 'where there was already considerable fibre networks and risk of overbuild', and the Tameside cooperative); that the Southern Arc lot covered GMCA/TfGM urban traffic control and assets in Stockport, Trafford, Salford and Manchester; full-fibre coverage by borough in September 2019 (Manchester 10.92%); and the £835,000 grant allocation to Manchester City Council.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-aaa88b3859ee02dc",
      "title": "ISPreview — Virgin Media Scoop £24m Greater Manchester Full Fibre Project (16 Mar 2020)",
      "url": "https://www.ispreview.co.uk/index.php/2020/03/virgin-media-scoop-24m-greater-manchester-full-fibre-project.html",
      "publisher": {
       "name": null,
       "domain": "ispreview.co.uk",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-66d896bda2c28f66"
      ],
      "temporal": {
       "publishedAt": "2020-03-16",
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-10-16",
       "dossierCreatedAt": "2026-10-16",
       "retrievedAt": null,
       "status": "publication-and-record-dates-recorded"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Trade-press report of GMCA's appointment of Virgin Media to deliver the LFFN project: up to 2,700 km of fibre to serve 1,700 public sector sites, new connections in Bury, Bolton, Oldham, Rochdale, Stockport, Trafford and Wigan, and more than 180 public sites in Salford and Manchester to see their connectivity upgraded.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     }
    ],
    "coverage": {
     "claimsTotal": 27,
     "claimsMapped": 27,
     "sourcesTotal": 7,
     "sourcesUsedByClaims": 7,
     "sourcesWithPublicationDate": 7,
     "sourcesWithArchive": 0,
     "sourcesWithExactLocator": 0,
     "sourcesWithContentHash": 0
    },
    "limits": [
     "Publisher names and source languages have not yet been classified; domains are recorded without guessing.",
     "Existing source notes are descriptive locators, not page- or paragraph-exact citations.",
     "A missing archive, publication date or content hash is shown as null rather than inferred.",
     "The project-level evidence grade ranks the strongest source in the entry; it is not a truth score for every claim."
    ]
   }
  }
 ]
}