clm-fd3e359264d5c561
quantitative
the first Nanjing metro line designed to GoA4, the highest automation grade
Permanent project revision
Revision 2026-08-21-evidence-baseline · effective 2026-08-06
Superseded. A later revision exists: 2026-08-21-unsourced-text-correction →
Created the first structured Evidence Passport with 15 claims and 5 source dossiers.
sha256:8abcdb0265c7078f88a721c6c6a3beac45c66ac9fdf96af32ddd83e2f82520c0
add /evidencePassport — Added claim-level evidence mapping and source dossiers.add /revisionHistory — Established a permanent, hash-addressed baseline revision.The text below is copied verbatim from the published record. Each claim names the source dossiers that carry it; caveats stay attached to the claim they qualify.
clm-fd3e359264d5c561
quantitative
the first Nanjing metro line designed to GoA4, the highest automation grade
clm-236563796a7aeb25
descriptive
trains wake themselves, leave the depot, run the line, berth, open and close doors and return to sleep on a timetable
clm-4fd1469fb3db90ea
quantitative
It opened in three sections — north on 28 December 2022
clm-0d2c567ea3ce2c5f
quantitative
south on 28 December 2023
clm-96ccc2a5d4a95dcf
quantitative
centre on 28 December 2024
clm-44854b2de0ea792f
quantitative
completing a 35.49 km, 27-station line
clm-9c9108332a8fd8f4
quantitative
CRRC Puzhen built 53 six-car sets
clm-0dc6e463c8257e1d
quantitative
SIL4 signalling, obstacle and derailment detection and active smoke detection
clm-7096ce117bfab43c
quantitative
The north section alone averaged 50,200 riders a day by the end of 2023
clm-1c4911b17876923e
quantitative
the line set a single-day record of 153,000 on 3 April 2024
clm-2936282d90c6b9bf
quantitative
from about 473 km and 226 stations to about 484 km and 234 stations
clm-87b3eaad6afab752
quantitative
across 13 lines
clm-70a4ba426fa6bd3e
descriptive
Every Nanjing and Jiangsu announcement says the trains 具备无须配置司机的能力 — have the capability to be run without a driver — which is a statement about the design, not about who is aboard
clm-37a833c06f31eb44
descriptive
Pre-opening reports said plainly that a driver would still ride and watch the console
clm-542d91fd236a7de3
descriptive
no accessible source names a date on which staff stopped riding
This layer records what is known about each source, what is still missing, and the exact snapshot this page is rendering. A missing date, archive or hash stays visible as missing.
Awaiting operator and domain-expert review; publication of this revision implies neither.
sha256:8abcdb0265c7078f88a721c6c6a3beac45c66ac9fdf96af32ddd83e2f82520c0
src-4293e0ea0726e505Full-line opening, 29 Dec 2024. Carries the careful wording: 『作为江苏省首条全自动无人驾驶列车线路』 and 『具备无须配置司机、完全自动化运行的能力』 — capability, not practice. Also 『12月28日13时30分…全线实现贯通运营』, 『7号线全线长约35.5公里』, 『设27个车站』, 『南京地铁运营总里程由近473公里增加至近484公里』.
src-76db3d459f766e7026 Dec 2024. Source for the length 『全长35.49公里』, 『全线27个车站』 and the ridership figures: 『截至2023年底,北段的日均客流量已经达到5.02万人次。今年4月3日,7号线(南段+北段)更是创下了15.3万人次的单日最高客运量』. Repeats the same capability wording.
src-e69476f1897b14d316 Jan 2025. Builder's own account: 53 trainsets, B-type, 80 km/h, SIL4 to EN50128/EN50129, automatic fault self-recovery, obstacle and derailment detection, active smoke detection, 50-minute fire-rated cabinets. Operator-grade evidence, used only for the hardware description.
src-2ea70905767e1819Pre-construction report on the Line 7 feasibility review. The passage that matters for the driverless test: 『很多乘客以为,既然列车全自动了,列车上就没有司机了…其实真相是,地铁列车上仍然还有司机,不过司机从繁忙的工作中彻底解放出来了,专注于监测地铁列车的正常运行』 — there is still a driver aboard, watching the console.
src-4ddabd7d8463f7f224 Apr 2018, construction start. 『这条线路将实现真正意义的"无人驾驶",司机只需在驾驶室监控列车运行』 — the driver only monitors. Note the sources disagree on whether there is a cab at all: this 2018 piece says 驾驶室, while the delivered trains have an open console. Neither states when, or whether, staff stopped riding.