Cairo's monorail carried its first passengers on 6 May 2026 over 16 stations between El-Musheer Tantawi and Justice City
Permanent project revision
Revision 2026-10-04-search-uplift · effective 2026-10-04
Current revision. This is the snapshot used by the live entity page.
Search-visibility uplift: sources re-read and dated, full claim array, stale or unsupported passages corrected against the sources, and the 2026 status checked.
sha256:4be72752f43e7ec2673eac7a78f6cc246f30eae46154d18837bd64c4915e8f63
replace /snapshot/projectFingerprint — Updated projectFingerprint to the current sourced project record.replace /snapshot/asOf — Updated asOf to the current sourced project record.replace /snapshot/claims — Updated claims to the current sourced project record.replace /snapshot/sources — Updated sources to the current sourced project record.The text below is copied verbatim from the published record. Each claim names the source dossiers that carry it; caveats stay attached to the claim they qualify.
clm-21477de472a4e0ce
quantitative
Cairo's monorail carried its first passengers on 6 May 2026 over 16 stations between El-Musheer Tantawi and Justice City
clm-91028ebc3940ec76
quantitative
reached its full 22 stations on 27 June 2026 when six Nasr City stations opened
clm-e73962dab9a9af84
quantitative
The 56.5 km elevated line runs from Cairo Stadium in Nasr City through New Cairo and into the New Administrative Capital
clm-b8b2f64c894ae9e3
quantitative
Alstom supplies 40 four-car Innovia 300 trains and CityFlo 650 signalling
clm-6868c8238e1b6d27
quantitative
says the line operates with fully driverless GoA4 signalling; no independent confirmation of unattended running was found
clm-502083ec17c800d6
quantitative
The National Authority for Tunnels owns the line; a consortium of Bombardier (now part of Alstom), Orascom Construction and Arab Contractors won a 2019 design-and-build contract with 30 years of operation and maintenance, covering this line and a second line between Giza and 6th of October City
clm-310a94110b780f89
quantitative
whose full trial operation the transport minister targeted in August 2026 for early 2027
clm-98f8ab145f080596
quantitative
The much-quoted 45,000 passengers per hour per direction is a design figure.
clm-890fc3414956f31d
quantitative
Fares run from 20 to 80 pounds by distance.
clm-7cadb222c2dad2fd
quantitative
No ridership figure had been published by October 2026.
clm-b440892912847dac
descriptive
only a handful of passengers in carriages at peak hours, and stations difficult to reach for some commuters
clm-e9153e47a88dbe1d
quantitative
Alstom says its project assessment cuts the El-Musheer Tantawi to Justice City trip from around 1 hour 20 minutes by road to about 40 minutes
clm-a7f1de2c4ee9040f
quantitative
the same Innovia 300 monorail runs São Paulo's Line 15, where staff rode the trains from 2014 until unattended operation began in March 2025
clm-73e286d58ac1434a
quantitative
Cairo's GoA4 label rests on the supplier's statement
This layer records what is known about each source, what is still missing, and the exact snapshot this page is rendering. A missing date, archive or hash stays visible as missing.
Awaiting operator and domain-expert review; publication of this revision implies neither.
sha256:4be72752f43e7ec2673eac7a78f6cc246f30eae46154d18837bd64c4915e8f63
src-d67bc089af128d06Independent reporting from the first weeks: opening on 6 May 2026 with 16 of 22 stations, 56.6 km from Nasr City to the New Administrative Capital, fares tiered from 20 to 80 pounds with a 50% subscription discount, only a handful of passengers at peak hours, stations difficult to reach for some commuters, and an analyst's calculation that daily use takes about 22% of the minimum wage.
src-180b299b5787f061The transport ministry's announcement of phase two: six Nasr City stations (Cairo Stadium, Hisham Barakat, Al-Azhar University, Seventh District, Field Marshal Ahmed Ismail, Jehan El-Sadat) open on Saturday 27 June 2026, bringing all 22 stations into service; daily operation 06:00–21:00; interchanges with Metro Line 3 and the LRT. No ridership figure.
src-75f1a02859576584Fetched. Primary contract source, supplier-issued. Scope: design and build two lines plus 30 years of O&M; 54 km East Cairo to the New Administrative Capital and 42 km 6th of October City to Giza; 70 four-car Innovia Monorail 300 trains (280 cars); total value 'exceeds $4.5 billion US (4.1 billion euro)', of which Bombardier $2.85bn and Orascom Construction close to $900m. Language is 'flagship performance in driverless operations'; the release makes no 'longest driverless monorail' claim.
src-2d2bfb7bac4247b3Fetched. Financing detail: £1.7bn UKEF guarantee behind a €1.89bn facility (including financed ECA premium), JP Morgan as initial mandated lead arranger and facility agent with CaixaBank, Crédit Agricole, Credit Suisse, KfW Ipex-Bank, NatWest, Société Générale and UBS; SACE and CESCE as reinsurers; described as the largest amount UKEF has ever provided for an overseas infrastructure project.
src-c2ba73a53825a329Trade press relaying Alstom's announcement: CBTC GoA4 signalling described as fully automated operation without a driver on board, 16 of 22 stations at launch, vehicles built in Derby, capacity of up to 45,000 passengers per hour per direction at maximum, and platform screen doors. Not independent of the supplier.
src-d0fa3fb9c0e34112Fetched (article dated April 2024, pre-opening). Trade profile corroborating route geometry (Line 1 54 km/22 stations; Line 2 42 km/13 stations, Boulak to 6th of October City), the $4.5bn Alstom-led consortium contract of August 2019, the UKEF £1.7bn plus New Urban Communities Authority loans on 14-year terms, 70 Innovia 300 trains at up to 80 km/h, CityFlo 650 moving-block CBTC, the 30-year O&M term and 45,000 pphpd. Its completion targets (Line 1 late 2024, Line 2 2025) were both missed.
src-d576b85d1754419dReference work used for route geography: East Nile line from Stadium to Justice City, 56.5 km, 22 stations, inaugurated 20 March 2026 with public service from 6 May. It also states the West Nile line has no estimated operation date. Its attribution of financing to the EBRD and EIB is not corroborated by any other source and is not used.
src-044319267388a660The supplier's announcement of commercial service: 16 of 22 stations open, 56 km from East Cairo to the New Administrative Capital, an ultimate capacity of up to 45,000 passengers per hour per direction, fully driverless CBTC GoA4 signalling, platform screen doors, and a project assessment putting the El-Moshir Tantawi to Justice City trip at about 40 minutes against around 1 hour 20 minutes by road.
src-49cd0c27c7bc8c39Transport Minister Kamel El-Wazir says the ministry targets full trial operation of the West Nile monorail (New October to Nile Valley, 43.8 km, 13 stations) at the start of 2027, possibly in stages, with a preference for opening the whole line at once.
src-70aaad14f2cb6d34Alstom marks ten years of São Paulo's Line 15 monorail, opened on 30 August 2014, running 27 Innovia 300 trains with Cityflo 650 signalling.
src-d67e8e48bc650fdfSão Paulo's Metro starts fully automated GoA4/UTO operation on Line 15 from 15–16 March 2025, after a gradual transition since July 2024; unions dispute its safety.