Permanent project revision

GeniLac Lake-Water Thermal Grid

Revision 2026-08-27-claims-and-sources · effective 2026-08-27

Superseded. A later revision exists: 2026-08-27-source-dating →

unreviewed

Created the first structured Evidence Passport with 7 claims and 4 source dossiers.

sha256:5f8d63eec0e791e8e73d52f4e8a99481a15cdd1e0a61a52f3879cd252965ed96

Change set

  • add /evidencePassport — Added claim-level evidence mapping and source dossiers.
  • add /revisionHistory — Established a permanent, hash-addressed baseline revision.
7
of 7 claims mapped
4
source dossiers
2
publication dates recorded
0
archives linked
0
exact locators
0
content captures hashed

Claims, one by one

The text below is copied verbatim from the published record. Each claim names the source dossiers that carry it; caveats stay attached to the claim they qualify.

Claim 1 clm-e3df02900293c086 quantitative
SIG pumps cold water from Lake Geneva through a planned ~30 km hydrothermal network to heat and cool buildings across the city
Published field
snippet · verbatim
Mapping
mapped · no interpretation or interpolation added by this passport
What the mapping says
Geneva Solutions: 'GeniLac, a 30-kilometre-long underground and hydrothermal network, will extend from the city centre to the Etang district, in Vernier, connecting the airport and the municipalities of Bellevue, Prégny-Chambésy and from Meyrin.' SIG describes the same network heating as well as cooling, via heat pumps.
Caveat
No claim-specific caveat recorded

Sources carrying this claim

  1. Geneva Solutions (press)
  2. SIG (authority)
Claim 2 clm-8394fad0985ebec8 quantitative
It grew from GLN (Genève-Lac-Nations), a 5 km network with a lakeside pumping station born in 2008; UN Geneva was its first customer, connecting in 2009, with the WHO, ITU, WTO and WMO following
Published field
snippet · verbatim
Mapping
mapped · no interpretation or interpolation added by this passport
What the mapping says
SIG: 'GLN, Genève-Lac-Nations, est né en 2008, composé d'une station de pompage au bord du lac et d'un réseau de 5 km', and 'L'ONU Genève fait figure de pionnière de la thermique renouvelable et se raccorde en premier en 2009', with the WHO, ITU, WTO and WMO following.
Caveat
SIG dates the UN connection to 2009; Geneva Solutions writes that the UN has been using the network 'since 2008'.

Sources carrying this claim

  1. SIG (authority)
  2. Geneva Solutions (press)
Claim 3 clm-8eaefb055011570c descriptive
GeniLac now runs as two loops — an open one into the city centre as far as the Rhône, and a closed one reaching the airport and the Quartier de l'Etang — with further loops planned for the PAV district, the Gare des Eaux-Vives and the university hospitals
Published field
snippet · verbatim
Mapping
mapped · no interpretation or interpolation added by this passport
What the mapping says
'GeniLac est composé de deux réseaux, l'un, en boucle ouverte vers le centre-ville qui s'étend jusqu'au Rhône, et l'autre, en boucle fermée qui relie l'aéroport et s'étend jusqu'au Quartier de l'Etang. D'autres boucles fermées verront le jour dans les secteurs du PAV (La Praille-Acacias-Vernets), de la Gare des Eaux-Vives et des HUG.'
Caveat
No claim-specific caveat recorded

Sources carrying this claim

  1. SIG (authority)
Claim 4 clm-286ea7ed98e2e383 quantitative
SIG says the installation runs on 100% renewable electricity and cuts the electricity a connected building uses for cooling by 80%, and its heating CO2 by 80%
Published field
snippet · verbatim
Mapping
mapped · no interpretation or interpolation added by this passport
What the mapping says
SIG: 'Toute l'installation fonctionne avec de l'électricité 100% renouvelable et permet une diminution de 80% de la consommation d'électricité pour la climatisation et de 80% des émissions de CO2 pour le chauffage.' Geneva Solutions reports the same two figures.
Caveat
No claim-specific caveat recorded

Sources carrying this claim

  1. SIG (authority)
  2. Geneva Solutions (press)
Claim 5 clm-2137f63874c6db2f quantitative
SIG reports that GeniLac produced 33 GWh of cooling and heat in 2021, nearly 30% more than in 2020, with 68 customers connected
Published field
impact · verbatim
Mapping
mapped · no interpretation or interpolation added by this passport
What the mapping says
SIG: 'En 2021, GeniLac a produit 33 GWh de froid et de chaud, ce qui représente une hausse de près de 30% par rapport à 2020. Aujourd'hui, GeniLac compte 68 clients.' Geneva Solutions independently reports 68 customers in August 2022.
Caveat
No claim-specific caveat recorded

Sources carrying this claim

  1. SIG (authority)
  2. Geneva Solutions (press)
Claim 6 clm-e6f2db2fd0955e12 quantitative
by 2045, once 350 buildings are connected, SIG expects 70 GWh of electricity saved a year — the annual consumption of 27,000 households — and 70,000 tonnes of greenhouse gases avoided a year for the Canton of Geneva
Published field
impact · verbatim
Mapping
mapped · no interpretation or interpolation added by this passport
What the mapping says
'A l'horizon 2045, lorsque 350 bâtiments seront raccordés, cela représentera une réduction de 70 GWh d'électricité par an, soit l'équivalent de la consommation annuelle de 27'000 ménages ainsi qu'une diminuation de 70'000 tonnes de gaz à effet de serre par an pour le canton de Genève.'
Caveat
A projection two decades out, not a measurement.

Sources carrying this claim

  1. SIG (authority)
  2. Geneva Solutions (press)
Claim 7 clm-e7119af58afc41a6 quantitative
A visiting reporter was told in 2022 that the network would be finished by 2024
Published field
lesson · verbatim
Mapping
mapped · no interpretation or interpolation added by this passport
What the mapping says
Geneva Solutions, from the August 2022 site visit: 'The project is expected to be completed by 2024 for a total outlay of around CHF 800 million.'
Caveat
No claim-specific caveat recorded

Sources carrying this claim

  1. Geneva Solutions (press)

Source dossiers and revision state

This layer records what is known about each source, what is still missing, and the exact snapshot this page is rendering. A missing date, archive or hash stays visible as missing.

unreviewed Revision 2026-08-27-claims-and-sources effective 2026-08-27 · created 2026-08-27

Awaiting operator and domain-expert review; publication of this revision implies neither.

Erratum on this revision's envelope. The snapshot, its hash and its permanent link are untouched.

  • createdAt previously read 2026-08-29T16:00:00Z. The batching script that produced this revision advanced createdAt into the future to satisfy the strictly-increasing order the validator requires per entity. The value never recorded a real event; the corrected value is the moment the revision provably existed in the repository. Corrected to 2026-08-27T02:45:42Z on 2026-08-27; evidence: first appears in commit a5bb3468d9, committed 2026-08-27T02:45:42Z.
sha256:5f8d63eec0e791e8e73d52f4e8a99481a15cdd1e0a61a52f3879cd252965ed96
7
of 7 claims mapped
4
source dossiers
2
publication dates recorded
0
archives linked
0
exact locators
0
content captures hashed

Governance facts carried by the record

Operator
SIG (Services Industriels de Genève)
Actor types
utility
Funding model
utility
Funding description
Not recorded
Cost
≈CHF 800 million ($805 million) — swissinfo (2019) attaches the figure to the new pumping station, Geneva Solutions (2022) to the whole project
Ownership
Not recorded
Decision rights
Not recorded
Exit conditions
Not recorded

4 source dossiers

SIG (authority) ww2.sig-ge.ch · 6 linked claims

Open original source ↗

Stable source ID
src-378b9aa9d8a652a0
Publisher
Name not classified · ww2.sig-ge.ch
Type / language
web-page · language not classified
Published
Not recorded
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-08-27
Dossier created
2026-08-29
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

SIG's own account of the GeniLac deployment. Source for the two loops and their reach, the 80% reductions, the 2045 projection, the delivered 2021 output (33 GWh of cooling and heat, nearly 30% up on 2020) and the 68 customers then connected, and for the prehistory: 'GLN, Genève-Lac-Nations, est né en 2008, composé d'une station de pompage au bord du lac et d'un réseau de 5 km', with UN Geneva connecting first in 2009 and the WHO, ITU, WTO and WMO following. The page carries no date of its own; its content describes 2022.

Descriptive only — not page/paragraph exact
swissinfo (press) swissinfo.ch · background

Open original source ↗

Stable source ID
src-0f174226b3545185
Publisher
Name not classified · swissinfo.ch
Type / language
web-page · language not classified
Published
2019-11-07
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-08-27
Dossier created
2026-08-29
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

Published 7 November 2019. Gives the cost with a dollar equivalent — 'A CHF800 million ($805 million) new pumping station is under construction north of Geneva as part of the Genilac project' — attaching the figure to the pumping station rather than the whole network. Its separate 80% cooling figure refers to a hotel in Lucerne, not to GeniLac.

Descriptive only — not page/paragraph exact
Claims linked
Background source; no baseline claim points here
Geneva Solutions (press) genevasolutions.news · 6 linked claims

Open original source ↗

Stable source ID
src-f5ce48a071f0be05
Publisher
Name not classified · genevasolutions.news
Type / language
web-page · language not classified
Published
2022-08-05
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-08-27
Dossier created
2026-08-29
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

Published 5 August 2022, from a Heidi.news site visit. Source for the 30 km extent, the Vengeron pumping station, pipes submerged at 45 metres drawing water at about 7 degrees, the 68 customers, and two figures worth keeping apart from SIG's: 'The project is expected to be completed by 2024 for a total outlay of around CHF 800 million.'

Descriptive only — not page/paragraph exact
SIG — reseau GeniLac (authority) ww2.sig-ge.ch · background

Open original source ↗

Stable source ID
src-3f3c0ddf3002dd9a
Publisher
Name not classified · ww2.sig-ge.ch
Type / language
web-page · language not classified
Published
Not recorded
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-08-27
Dossier created
2026-08-29
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

Official GeniLac page by the Geneva utility SIG.

Descriptive only — not page/paragraph exact
Claims linked
Background source; no baseline claim points here
Known limits of this passport
  • Publisher names and source languages have not yet been classified; domains are recorded without guessing.
  • Existing source notes are descriptive locators, not page- or paragraph-exact citations.
  • A missing archive, publication date or content hash is shown as null rather than inferred.
  • The project-level evidence grade ranks the strongest source in the entry; it is not a truth score for every claim.