Permanent project revision

Miami Forever flood-resilience program

Revision 2026-08-27-source-dating · effective 2026-07-19

Current revision. This is the snapshot used by the live entity page.

unreviewed

Every source on this entry now carries a date key: a publication date where the publisher states one, otherwise an explicit null with the reason on the record.

sha256:0d3865a3a191cc75c4047ea871cfa49fd4a86212a64fd7c3735857b304a9bdb5

Change set

  • replace /snapshot/projectFingerprint — Updated projectFingerprint to the current sourced project record.
  • replace /snapshot/sources — Updated sources to the current sourced project record.
5
of 5 claims mapped
5
source dossiers
2
publication dates recorded
0
archives linked
0
exact locators
0
content captures hashed

Claims, one by one

The text below is copied verbatim from the published record. Each claim names the source dossiers that carry it; caveats stay attached to the claim they qualify.

Claim 1 clm-dae106793690e9ae quantitative
Its Department of Resilience and Public Works modelled the city's eight drainage basins against 50-year sea-level-rise scenarios, producing a 2024 master plan that prioritises stormwater pumps, injection wells and seawalls
Published field
snippet · verbatim
Mapping
mapped · no interpretation or interpolation added by this passport
What the mapping says
The city's stormwater master plan page and the consulting engineer's account describe the basin-by-basin modelling against sea-level-rise scenarios and the resulting prioritised programme of pumps, injection wells and seawalls.
Caveat
No claim-specific caveat recorded

Sources carrying this claim

  1. City of Miami — Stormwater Master Plan (Office of Capital Improvements)
  2. CDM Smith — Miami Stormwater Master Plan
Claim 2 clm-53b94b9d7a43f152 quantitative
Thirteen pump stations operate today; the 2017 Miami Forever Bond earmarked $192M toward the multi-billion-dollar buildout
Published field
snippet · verbatim
Mapping
mapped · no interpretation or interpolation added by this passport
What the mapping says
The bond page and the clearinghouse record give the $192 million allocated to flood prevention within the 2017 Miami Forever Bond; the April 2024 report covers the pump stations in service and the scale of the remaining programme.
Caveat
No claim-specific caveat recorded

Sources carrying this claim

  1. City of Miami — Miami Forever Bond
  2. Miami Today — 'Miami needs $5 billion to fight flooding' (2024-04-16)
  3. Adaptation Clearinghouse — Miami Forever Bond
Claim 3 clm-bdf9a9cbaad24df3 quantitative
Thirteen pump stations operate today and the 2017 Miami Forever Bond earmarked $192M for flood defence, while the city's own modelling puts the full buildout at $3.8-5.4 billion
Published field
impact · verbatim
Mapping
mapped · no interpretation or interpolation added by this passport
What the mapping says
The April 2024 report gives the city's estimate of the full flood-defence programme at several billion dollars, against the bond's $192 million allocation.
Caveat
No claim-specific caveat recorded

Sources carrying this claim

  1. Miami Today — 'Miami needs $5 billion to fight flooding' (2024-04-16)
  2. City of Miami — Miami Forever Bond
Claim 4 clm-34d4945c98746570 descriptive
the money raised covers a small fraction of what the plan calls for, and the master plan's job is to decide the order in which the rest gets built
Published field
impact · verbatim
Mapping
mapped · no interpretation or interpolation added by this passport
What the mapping says
The report sets the bond allocation against the multi-billion estimate; the master plan page describes the prioritisation of works.
Caveat
No claim-specific caveat recorded

Sources carrying this claim

  1. Miami Today — 'Miami needs $5 billion to fight flooding' (2024-04-16)
  2. City of Miami — Stormwater Master Plan (Office of Capital Improvements)
Claim 5 clm-16068859638780e4 quantitative
The city's own modelling puts the full flood-defence buildout at $3.8–5.4 billion — several times its annual budget — so funding and sequencing, not engineering, are the binding constraint
Published field
lesson · verbatim
Mapping
mapped · no interpretation or interpolation added by this passport
What the mapping says
The April 2024 report gives the city's own estimate and frames it against what the city can raise; the master plan is a sequencing document.
Caveat
No claim-specific caveat recorded

Sources carrying this claim

  1. Miami Today — 'Miami needs $5 billion to fight flooding' (2024-04-16)
  2. City of Miami — Stormwater Master Plan (Office of Capital Improvements)

Source dossiers and revision state

This layer records what is known about each source, what is still missing, and the exact snapshot this page is rendering. A missing date, archive or hash stays visible as missing.

unreviewed Revision 2026-08-27-source-dating effective 2026-07-19 · created 2026-08-27

Awaiting operator and domain-expert review; publication of this revision implies neither.

sha256:0d3865a3a191cc75c4047ea871cfa49fd4a86212a64fd7c3735857b304a9bdb5
5
of 5 claims mapped
5
source dossiers
2
publication dates recorded
0
archives linked
0
exact locators
0
content captures hashed

Governance facts carried by the record

Operator
City of Miami — Department of Resilience and Public Works
Actor types
city-government
Funding model
public
Funding description
2017 Miami Forever Bond ($400M GO bond; $192M for sea-level rise/flooding)
Cost
≈$3.8–5.4B planned capital program
Ownership
Not recorded
Decision rights
Not recorded
Exit conditions
Not recorded

5 source dossiers

City of Miami — Stormwater Master Plan (Office of Capital Improvements) miami.gov · 3 linked claims

Open original source ↗

Stable source ID
src-ecd973ad754e8d29
Publisher
Name not classified · miami.gov
Type / language
web-page · language not classified
Published
Not recorded
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-07-19
Dossier created
2026-08-27
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

The city's page for the stormwater master plan. No publication date is recorded: the page did not answer when this entry was checked.

Descriptive only — not page/paragraph exact
City of Miami — Miami Forever Bond miami.gov · 2 linked claims

Open original source ↗

Stable source ID
src-21d468b40480746a
Publisher
Name not classified · miami.gov
Type / language
web-page · language not classified
Published
Not recorded
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-07-19
Dossier created
2026-08-27
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

The city's page for the 2017 bond and its allocations. The page states no publication date.

Descriptive only — not page/paragraph exact
CDM Smith — Miami Stormwater Master Plan cdmsmith.com · 1 linked claim

Open original source ↗

Stable source ID
src-ed9f604f4cc9aec5
Publisher
Name not classified · cdmsmith.com
Type / language
web-page · language not classified
Published
2025-12-12
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-07-19
Dossier created
2026-08-27
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

The consulting engineer's account of the master plan it produced for the city.

Descriptive only — not page/paragraph exact
Miami Today — 'Miami needs $5 billion to fight flooding' (2024-04-16) miamitodaynews.com · 4 linked claims

Open original source ↗

Stable source ID
src-8abd6d5091337b30
Publisher
Name not classified · miamitodaynews.com
Type / language
web-page · language not classified
Published
2024-04-16
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-07-19
Dossier created
2026-08-27
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

Press: $3.8–5.4B program, 13 pumps today vs 93 target, 2,000+ recharge wells, 490 outfalls, 93 mi shoreline, 50-yr SLR horizon.

Descriptive only — not page/paragraph exact
Adaptation Clearinghouse — Miami Forever Bond adaptationclearinghouse.org · 1 linked claim

Open original source ↗

Stable source ID
src-ddaa8f05a70d654d
Publisher
Name not classified · adaptationclearinghouse.org
Type / language
web-page · language not classified
Published
Not recorded
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-07-19
Dossier created
2026-08-27
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

A policy clearinghouse record of the bond. No publication date is recorded: the page did not answer when this entry was checked.

Descriptive only — not page/paragraph exact
Known limits of this passport
  • Publisher names and source languages have not yet been classified; domains are recorded without guessing.
  • Existing source notes are descriptive locators, not page- or paragraph-exact citations.
  • A missing archive, publication date or content hash is shown as null rather than inferred.
  • The project-level evidence grade ranks the strongest source in the entry; it is not a truth score for every claim.