Miami Forever flood-resilience program
This overview was generated with AI from the public sources listed below and checked against them before publication. It has not had a complete human fact-check — treat it as a starting point and follow the sources.
How this atlas is made · What “last verified” means · What “source-checked” means · The full record behind this page
✎ Corrected 27 Aug 2026 Publication date recorded for 5 sources. What changed →
Facing a rising Biscayne Bay, Miami runs a data-driven flood-resilience program. Its Department of Resilience and Public Works modelled the city's eight drainage basins against 50-year sea-level-rise scenarios, producing a 2024 master plan that prioritises stormwater pumps, injection wells and seawalls. Thirteen pump stations operate today; the 2017 Miami Forever Bond earmarked $192M toward the multi-billion-dollar buildout.
what does this mean?
The strongest source is the operator's or the city's own reporting — an official report, dataset or press release. It grades who did the looking — not how well the project went. All four grades →📊 Impact
The gap is the finding. Thirteen pump stations operate today and the 2017 Miami Forever Bond earmarked $192M for flood defence, while the city's own modelling puts the full buildout at $3.8-5.4 billion — so the money raised covers a small fraction of what the plan calls for, and the master plan's job is to decide the order in which the rest gets built.
Sources
Show your work What this page rests on and what it can’t tell you · all 5 claims with their sources · the forensic record
Evidence Passport · public beta 5 addressable claims, 5 source dossiers, one permanent baseline. The passport is unreviewed — an AI-assisted structural migration, not a human or expert endorsement. Every revision keeps a permanent copy under revision history.
Inspect the claims, one by one — verbatim text, sources and caveats for all 5
The text below is copied verbatim from the published record. Each claim names the source dossiers that carry it; caveats stay attached to the claim they qualify.
clm-dae106793690e9ae
quantitative
Its Department of Resilience and Public Works modelled the city's eight drainage basins against 50-year sea-level-rise scenarios, producing a 2024 master plan that prioritises stormwater pumps, injection wells and seawalls
Sources carrying this claim
clm-53b94b9d7a43f152
quantitative
Thirteen pump stations operate today; the 2017 Miami Forever Bond earmarked $192M toward the multi-billion-dollar buildout
Sources carrying this claim
clm-bdf9a9cbaad24df3
quantitative
Thirteen pump stations operate today and the 2017 Miami Forever Bond earmarked $192M for flood defence, while the city's own modelling puts the full buildout at $3.8-5.4 billion
Sources carrying this claim
clm-34d4945c98746570
descriptive
the money raised covers a small fraction of what the plan calls for, and the master plan's job is to decide the order in which the rest gets built
Sources carrying this claim
clm-16068859638780e4
quantitative
The city's own modelling puts the full flood-defence buildout at $3.8–5.4 billion — several times its annual budget — so funding and sequencing, not engineering, are the binding constraint
Sources carrying this claim
Forensic record — source dossiers, gaps, hashes and the exact revision this page renders
This layer records what is known about each source, what is still missing, and the exact snapshot this page is rendering. A missing date, archive or hash stays visible as missing.
Awaiting operator and domain-expert review; publication of this revision implies neither.
sha256:0d3865a3a191cc75c4047ea871cfa49fd4a86212a64fd7c3735857b304a9bdb5
- 5
- of 5 claims mapped
- 5
- source dossiers
- 2
- publication dates recorded
- 0
- archives linked
- 0
- exact locators
- 0
- content captures hashed
Governance facts carried by the record
- Operator
- City of Miami — Department of Resilience and Public Works
- Actor types
- city-government
- Funding model
- public
- Funding description
- 2017 Miami Forever Bond ($400M GO bond; $192M for sea-level rise/flooding)
- Cost
- ≈$3.8–5.4B planned capital program
- Ownership
- Not recorded
- Decision rights
- Not recorded
- Exit conditions
- Not recorded
5 source dossiers
City of Miami — Stormwater Master Plan (Office of Capital Improvements)
- Stable source ID
src-ecd973ad754e8d29- Publisher
- Name not classified · miami.gov
- Type / language
- web-page · language not classified
- Published
- Not recorded
- Updated
- Not recorded
- Source last checked
- No source-level check date
- Record last verified
- 2026-07-19
- Dossier created
- 2026-08-27
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
- Descriptive only — not page/paragraph exact
Open the recorded source note
The city's page for the stormwater master plan. No publication date is recorded: the page did not answer when this entry was checked.
City of Miami — Miami Forever Bond
- Stable source ID
src-21d468b40480746a- Publisher
- Name not classified · miami.gov
- Type / language
- web-page · language not classified
- Published
- Not recorded
- Updated
- Not recorded
- Source last checked
- No source-level check date
- Record last verified
- 2026-07-19
- Dossier created
- 2026-08-27
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
- Descriptive only — not page/paragraph exact
Open the recorded source note
The city's page for the 2017 bond and its allocations. The page states no publication date.
- Claims linked
CDM Smith — Miami Stormwater Master Plan
- Stable source ID
src-ed9f604f4cc9aec5- Publisher
- Name not classified · cdmsmith.com
- Type / language
- web-page · language not classified
- Published
- 2025-12-12
- Updated
- Not recorded
- Source last checked
- No source-level check date
- Record last verified
- 2026-07-19
- Dossier created
- 2026-08-27
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
- Descriptive only — not page/paragraph exact
Open the recorded source note
The consulting engineer's account of the master plan it produced for the city.
- Claims linked
Miami Today — 'Miami needs $5 billion to fight flooding' (2024-04-16)
- Stable source ID
src-8abd6d5091337b30- Publisher
- Name not classified · miamitodaynews.com
- Type / language
- web-page · language not classified
- Published
- 2024-04-16
- Updated
- Not recorded
- Source last checked
- No source-level check date
- Record last verified
- 2026-07-19
- Dossier created
- 2026-08-27
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
- Descriptive only — not page/paragraph exact
Open the recorded source note
Press: $3.8–5.4B program, 13 pumps today vs 93 target, 2,000+ recharge wells, 490 outfalls, 93 mi shoreline, 50-yr SLR horizon.
Adaptation Clearinghouse — Miami Forever Bond
- Stable source ID
src-ddaa8f05a70d654d- Publisher
- Name not classified · adaptationclearinghouse.org
- Type / language
- web-page · language not classified
- Published
- Not recorded
- Updated
- Not recorded
- Source last checked
- No source-level check date
- Record last verified
- 2026-07-19
- Dossier created
- 2026-08-27
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
- Descriptive only — not page/paragraph exact
Open the recorded source note
A policy clearinghouse record of the bond. No publication date is recorded: the page did not answer when this entry was checked.
- Claims linked
Known limits of this passport
- Publisher names and source languages have not yet been classified; domains are recorded without guessing.
- Existing source notes are descriptive locators, not page- or paragraph-exact citations.
- A missing archive, publication date or content hash is shown as null rather than inferred.
- The project-level evidence grade ranks the strongest source in the entry; it is not a truth score for every claim.
Continue exploring
Compare this project
Explore the wider context
📎 Cite this project
1001 Smart Cities (2026). “Miami Forever flood-resilience program” — Miami, United States. The Smart City Atlas. https://1001smartcities.org/projects/miami-flood-resilience/ (last verified 2026-07-19). Data: CC BY 4.0.
The underlying data is free to reuse with attribution — see the open data page.
