 "schemaVersion": "1.0.0",
 "constitutionVersion": "1.0.0",
 "createdAt": "2026-08-12T00:00:00Z",
 "description": "Append-only Evidence Passport records. Old revisions are immutable; corrections create a new revision and preserve the previous permalink.",
 "entity": {
  "type": "project",
  "id": "miami-flood-resilience",
  "title": "Miami Forever flood-resilience program",
  "canonicalUrl": "https://1001smartcities.org/projects/miami-flood-resilience/"
 },
 "currentRevisionId": "2026-08-27-source-dating",
 "revisions": [
  {
   "id": "2026-08-27-claims-and-sources",
   "createdAt": "2026-08-27T04:27:38Z",
   "effectiveAt": "2026-07-19",
   "changeType": "baseline",
   "summary": "Created the first structured Evidence Passport with 5 claims and 5 source dossiers.",
   "preparedBy": {
    "type": "automation",
    "label": "AI-assisted evidence preparation",
    "humanApproved": false
   },
   "review": {
    "status": "unreviewed",
    "by": null,
    "date": null,
    "note": "Awaiting operator and domain-expert review; publication of this revision implies neither."
   },
   "changes": [
    {
     "operation": "add",
     "path": "/evidencePassport",
     "summary": "Added claim-level evidence mapping and source dossiers."
    },
    {
     "operation": "add",
     "path": "/revisionHistory",
     "summary": "Established a permanent, hash-addressed baseline revision."
    }
   ],
   "snapshotHash": "sha256:d2dcb8e35de899111e495d2c617cd45dfd280172c3d8bab2335d8a835fc0d6bc",
   "snapshot": {
    "asOf": "2026-07-19",
    "projectFingerprint": "sha256:cd8f1b97d1b65b0262e10353da244e7196563d3fdcecd081cfa054ca8ceba2c3",
    "assurance": {
     "status": "unreviewed",
     "scope": "evidence-passport-revision",
     "statement": "AI-assisted structural preparation. This revision has not been reviewed by a human or subject-matter expert.",
     "machineChecks": [
      "schema",
      "publication-diff-contract",
      "material-project-fingerprint",
      "claim-text-drift",
      "source-reference-resolution",
      "complete-source-dossier",
      "snapshot-hash"
     ]
    },
    "projectState": {
     "status": "live",
     "outcome": "ongoing",
     "evidenceGrade": "official",
     "timeline": {
      "started": 2017,
      "ended": null
     }
    },
    "governance": {
     "operator": "City of Miami — Department of Resilience and Public Works",
     "actorTypes": [
      "city-government"
     ],
     "fundingModel": "public",
     "fundingDescription": "2017 Miami Forever Bond ($400M GO bond; $192M for sea-level rise/flooding)",
     "cost": "≈$3.8–5.4B planned capital program",
     "ownership": null,
     "decisionRights": null,
     "exitConditions": null
    },
    "claims": [
     {
      "id": "clm-dae106793690e9ae",
      "field": "snippet",
      "text": "Its Department of Resilience and Public Works modelled the city's eight drainage basins against 50-year sea-level-rise scenarios, producing a 2024 master plan that prioritises stormwater pumps, injection wells and seawalls",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-ecd973ad754e8d29",
       "src-ed9f604f4cc9aec5"
      ],
      "supportNote": "The city's stormwater master plan page and the consulting engineer's account describe the basin-by-basin modelling against sea-level-rise scenarios and the resulting prioritised programme of pumps, injection wells and seawalls.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-53b94b9d7a43f152",
      "field": "snippet",
      "text": "Thirteen pump stations operate today; the 2017 Miami Forever Bond earmarked $192M toward the multi-billion-dollar buildout",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-21d468b40480746a",
       "src-8abd6d5091337b30",
       "src-ddaa8f05a70d654d"
      ],
      "supportNote": "The bond page and the clearinghouse record give the $192 million allocated to flood prevention within the 2017 Miami Forever Bond; the April 2024 report covers the pump stations in service and the scale of the remaining programme.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-bdf9a9cbaad24df3",
      "field": "impact",
      "text": "Thirteen pump stations operate today and the 2017 Miami Forever Bond earmarked $192M for flood defence, while the city's own modelling puts the full buildout at $3.8-5.4 billion",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-8abd6d5091337b30",
       "src-21d468b40480746a"
      ],
      "supportNote": "The April 2024 report gives the city's estimate of the full flood-defence programme at several billion dollars, against the bond's $192 million allocation.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-34d4945c98746570",
      "field": "impact",
      "text": "the money raised covers a small fraction of what the plan calls for, and the master plan's job is to decide the order in which the rest gets built",
      "statementKind": "descriptive",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-8abd6d5091337b30",
       "src-ecd973ad754e8d29"
      ],
      "supportNote": "The report sets the bond allocation against the multi-billion estimate; the master plan page describes the prioritisation of works.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-16068859638780e4",
      "field": "lesson",
      "text": "The city's own modelling puts the full flood-defence buildout at $3.8–5.4 billion — several times its annual budget — so funding and sequencing, not engineering, are the binding constraint",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-8abd6d5091337b30",
       "src-ecd973ad754e8d29"
      ],
      "supportNote": "The April 2024 report gives the city's own estimate and frames it against what the city can raise; the master plan is a sequencing document.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     }
    ],
    "sources": [
     {
      "id": "src-ecd973ad754e8d29",
      "title": "City of Miami — Stormwater Master Plan (Office of Capital Improvements)",
      "url": "https://www.miami.gov/My-Government/Departments/Office-of-Capital-Improvements/Stormwater-Master-Plan",
      "publisher": {
       "name": null,
       "domain": "miami.gov",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-dae106793690e9ae",
       "clm-34d4945c98746570",
       "clm-16068859638780e4"
      ],
      "temporal": {
       "publishedAt": null,
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-07-19",
       "dossierCreatedAt": "2026-09-04",
       "retrievedAt": null,
       "status": "record-date-only"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "The city's page for the stormwater master plan.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-21d468b40480746a",
      "title": "City of Miami — Miami Forever Bond",
      "url": "https://www.miami.gov/My-Government/Departments/Office-of-Capital-Improvements/Miami-Forever-Bond",
      "publisher": {
       "name": null,
       "domain": "miami.gov",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-53b94b9d7a43f152",
       "clm-bdf9a9cbaad24df3"
      ],
      "temporal": {
       "publishedAt": null,
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-07-19",
       "dossierCreatedAt": "2026-09-04",
       "retrievedAt": null,
       "status": "record-date-only"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "The city's page for the 2017 bond and its allocations.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-ed9f604f4cc9aec5",
      "title": "CDM Smith — Miami Stormwater Master Plan",
      "url": "https://www.cdmsmith.com/en/client-solutions/projects/miami-stormwater-master-plan",
      "publisher": {
       "name": null,
       "domain": "cdmsmith.com",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-dae106793690e9ae"
      ],
      "temporal": {
       "publishedAt": null,
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-07-19",
       "dossierCreatedAt": "2026-09-04",
       "retrievedAt": null,
       "status": "record-date-only"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "The consulting engineer's account of the master plan it produced for the city.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-8abd6d5091337b30",
      "title": "Miami Today — 'Miami needs $5 billion to fight flooding' (2024-04-16)",
      "url": "https://www.miamitodaynews.com/2024/04/16/miami-needs-5-billion-to-fight-flooding/",
      "publisher": {
       "name": null,
       "domain": "miamitodaynews.com",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-53b94b9d7a43f152",
       "clm-bdf9a9cbaad24df3",
       "clm-34d4945c98746570",
       "clm-16068859638780e4"
      ],
      "temporal": {
       "publishedAt": "2024-04-16",
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-07-19",
       "dossierCreatedAt": "2026-09-04",
       "retrievedAt": null,
       "status": "publication-and-record-dates-recorded"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Press: $3.8–5.4B program, 13 pumps today vs 93 target, 2,000+ recharge wells, 490 outfalls, 93 mi shoreline, 50-yr SLR horizon.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-ddaa8f05a70d654d",
      "title": "Adaptation Clearinghouse — Miami Forever Bond",
      "url": "https://www.adaptationclearinghouse.org/resources/miami-forever-bond-city-of-miami-florida.html",
      "publisher": {
       "name": null,
       "domain": "adaptationclearinghouse.org",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-53b94b9d7a43f152"
      ],
      "temporal": {
       "publishedAt": null,
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-07-19",
       "dossierCreatedAt": "2026-09-04",
       "retrievedAt": null,
       "status": "record-date-only"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "A policy clearinghouse record of the bond.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     }
    ],
    "coverage": {
     "claimsTotal": 5,
     "claimsMapped": 5,
     "sourcesTotal": 5,
     "sourcesUsedByClaims": 5,
     "sourcesWithPublicationDate": 1,
     "sourcesWithArchive": 0,
     "sourcesWithExactLocator": 0,
     "sourcesWithContentHash": 0
    },
    "limits": [
     "Publisher names and source languages have not yet been classified; domains are recorded without guessing.",
     "Existing source notes are descriptive locators, not page- or paragraph-exact citations.",
     "A missing archive, publication date or content hash is shown as null rather than inferred.",
     "The project-level evidence grade ranks the strongest source in the entry; it is not a truth score for every claim."
    ]
   }
  },
  {
   "id": "2026-08-27-source-dating",
   "createdAt": "2026-08-27T13:37:00Z",
   "effectiveAt": "2026-07-19",
   "changeType": "correction",
   "summary": "Every source on this entry now carries a date key: a publication date where the publisher states one, otherwise an explicit null with the reason on the record.",
   "preparedBy": {
    "type": "automation",
    "label": "AI-assisted evidence preparation",
    "humanApproved": false
   },
   "review": {
    "status": "unreviewed",
    "by": null,
    "date": null,
    "note": "Awaiting operator and domain-expert review; publication of this revision implies neither."
   },
   "changes": [
    {
     "operation": "replace",
     "path": "/snapshot/projectFingerprint",
     "summary": "Updated projectFingerprint to the current sourced project record."
    },
    {
     "operation": "replace",
     "path": "/snapshot/sources",
     "summary": "Updated sources to the current sourced project record."
    }
   ],
   "snapshotHash": "sha256:0d3865a3a191cc75c4047ea871cfa49fd4a86212a64fd7c3735857b304a9bdb5",
   "snapshot": {
    "asOf": "2026-07-19",
    "projectFingerprint": "sha256:9e13a646bffee8643fcbb1aa0f18cc271e98c984b7df41519a794c3ce1d319bf",
    "assurance": {
     "status": "unreviewed",
     "scope": "evidence-passport-revision",
     "statement": "AI-assisted structural preparation. This revision has not been reviewed by a human or subject-matter expert.",
     "machineChecks": [
      "schema",
      "publication-diff-contract",
      "material-project-fingerprint",
      "claim-text-drift",
      "source-reference-resolution",
      "complete-source-dossier",
      "snapshot-hash"
     ]
    },
    "projectState": {
     "status": "live",
     "outcome": "ongoing",
     "evidenceGrade": "official",
     "timeline": {
      "started": 2017,
      "ended": null
     }
    },
    "governance": {
     "operator": "City of Miami — Department of Resilience and Public Works",
     "actorTypes": [
      "city-government"
     ],
     "fundingModel": "public",
     "fundingDescription": "2017 Miami Forever Bond ($400M GO bond; $192M for sea-level rise/flooding)",
     "cost": "≈$3.8–5.4B planned capital program",
     "ownership": null,
     "decisionRights": null,
     "exitConditions": null
    },
    "claims": [
     {
      "id": "clm-dae106793690e9ae",
      "field": "snippet",
      "text": "Its Department of Resilience and Public Works modelled the city's eight drainage basins against 50-year sea-level-rise scenarios, producing a 2024 master plan that prioritises stormwater pumps, injection wells and seawalls",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-ecd973ad754e8d29",
       "src-ed9f604f4cc9aec5"
      ],
      "supportNote": "The city's stormwater master plan page and the consulting engineer's account describe the basin-by-basin modelling against sea-level-rise scenarios and the resulting prioritised programme of pumps, injection wells and seawalls.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-53b94b9d7a43f152",
      "field": "snippet",
      "text": "Thirteen pump stations operate today; the 2017 Miami Forever Bond earmarked $192M toward the multi-billion-dollar buildout",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-21d468b40480746a",
       "src-8abd6d5091337b30",
       "src-ddaa8f05a70d654d"
      ],
      "supportNote": "The bond page and the clearinghouse record give the $192 million allocated to flood prevention within the 2017 Miami Forever Bond; the April 2024 report covers the pump stations in service and the scale of the remaining programme.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-bdf9a9cbaad24df3",
      "field": "impact",
      "text": "Thirteen pump stations operate today and the 2017 Miami Forever Bond earmarked $192M for flood defence, while the city's own modelling puts the full buildout at $3.8-5.4 billion",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-8abd6d5091337b30",
       "src-21d468b40480746a"
      ],
      "supportNote": "The April 2024 report gives the city's estimate of the full flood-defence programme at several billion dollars, against the bond's $192 million allocation.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-34d4945c98746570",
      "field": "impact",
      "text": "the money raised covers a small fraction of what the plan calls for, and the master plan's job is to decide the order in which the rest gets built",
      "statementKind": "descriptive",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-8abd6d5091337b30",
       "src-ecd973ad754e8d29"
      ],
      "supportNote": "The report sets the bond allocation against the multi-billion estimate; the master plan page describes the prioritisation of works.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     },
     {
      "id": "clm-16068859638780e4",
      "field": "lesson",
      "text": "The city's own modelling puts the full flood-defence buildout at $3.8–5.4 billion — several times its annual budget — so funding and sequencing, not engineering, are the binding constraint",
      "statementKind": "quantitative",
      "textMode": "verbatim-from-project-record",
      "mappingStatus": "mapped",
      "sourceRefs": [
       "src-8abd6d5091337b30",
       "src-ecd973ad754e8d29"
      ],
      "supportNote": "The April 2024 report gives the city's own estimate and frames it against what the city can raise; the master plan is a sequencing document.",
      "caveat": null,
      "interpretation": {
       "added": false,
       "interpolation": false,
       "note": "The passport copies the published claim and its recorded source mapping without adding a conclusion."
      }
     }
    ],
    "sources": [
     {
      "id": "src-ecd973ad754e8d29",
      "title": "City of Miami — Stormwater Master Plan (Office of Capital Improvements)",
      "url": "https://www.miami.gov/My-Government/Departments/Office-of-Capital-Improvements/Stormwater-Master-Plan",
      "publisher": {
       "name": null,
       "domain": "miami.gov",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-dae106793690e9ae",
       "clm-34d4945c98746570",
       "clm-16068859638780e4"
      ],
      "temporal": {
       "publishedAt": null,
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-07-19",
       "dossierCreatedAt": "2026-08-27",
       "retrievedAt": null,
       "status": "record-date-only"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "The city's page for the stormwater master plan. No publication date is recorded: the page did not answer when this entry was checked.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-21d468b40480746a",
      "title": "City of Miami — Miami Forever Bond",
      "url": "https://www.miami.gov/My-Government/Departments/Office-of-Capital-Improvements/Miami-Forever-Bond",
      "publisher": {
       "name": null,
       "domain": "miami.gov",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-53b94b9d7a43f152",
       "clm-bdf9a9cbaad24df3"
      ],
      "temporal": {
       "publishedAt": null,
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-07-19",
       "dossierCreatedAt": "2026-08-27",
       "retrievedAt": null,
       "status": "record-date-only"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "The city's page for the 2017 bond and its allocations. The page states no publication date.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-ed9f604f4cc9aec5",
      "title": "CDM Smith — Miami Stormwater Master Plan",
      "url": "https://www.cdmsmith.com/en/client-solutions/projects/miami-stormwater-master-plan",
      "publisher": {
       "name": null,
       "domain": "cdmsmith.com",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-dae106793690e9ae"
      ],
      "temporal": {
       "publishedAt": "2025-12-12",
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-07-19",
       "dossierCreatedAt": "2026-08-27",
       "retrievedAt": null,
       "status": "publication-and-record-dates-recorded"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "The consulting engineer's account of the master plan it produced for the city.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-8abd6d5091337b30",
      "title": "Miami Today — 'Miami needs $5 billion to fight flooding' (2024-04-16)",
      "url": "https://www.miamitodaynews.com/2024/04/16/miami-needs-5-billion-to-fight-flooding/",
      "publisher": {
       "name": null,
       "domain": "miamitodaynews.com",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-53b94b9d7a43f152",
       "clm-bdf9a9cbaad24df3",
       "clm-34d4945c98746570",
       "clm-16068859638780e4"
      ],
      "temporal": {
       "publishedAt": "2024-04-16",
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-07-19",
       "dossierCreatedAt": "2026-08-27",
       "retrievedAt": null,
       "status": "publication-and-record-dates-recorded"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "Press: $3.8–5.4B program, 13 pumps today vs 93 target, 2,000+ recharge wells, 490 outfalls, 93 mi shoreline, 50-yr SLR horizon.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     },
     {
      "id": "src-ddaa8f05a70d654d",
      "title": "Adaptation Clearinghouse — Miami Forever Bond",
      "url": "https://www.adaptationclearinghouse.org/resources/miami-forever-bond-city-of-miami-florida.html",
      "publisher": {
       "name": null,
       "domain": "adaptationclearinghouse.org",
       "classification": "not-classified"
      },
      "sourceType": "web-page",
      "language": "und",
      "role": "claim-evidence",
      "claimRefs": [
       "clm-53b94b9d7a43f152"
      ],
      "temporal": {
       "publishedAt": null,
       "updatedAt": null,
       "sourceCheckedAt": null,
       "recordLastVerifiedAt": "2026-07-19",
       "dossierCreatedAt": "2026-08-27",
       "retrievedAt": null,
       "status": "record-date-only"
      },
      "locator": {
       "type": "descriptive-source-note",
       "value": "A policy clearinghouse record of the bond. No publication date is recorded: the page did not answer when this entry was checked.",
       "exact": false
      },
      "preservation": {
       "archiveUrl": null,
       "archivedAt": null,
       "contentHash": null,
       "status": "not-captured"
      }
     }
    ],
    "coverage": {
     "claimsTotal": 5,
     "claimsMapped": 5,
     "sourcesTotal": 5,
     "sourcesUsedByClaims": 5,
     "sourcesWithPublicationDate": 2,
     "sourcesWithArchive": 0,
     "sourcesWithExactLocator": 0,
     "sourcesWithContentHash": 0
    },
    "limits": [
     "Publisher names and source languages have not yet been classified; domains are recorded without guessing.",
     "Existing source notes are descriptive locators, not page- or paragraph-exact citations.",
     "A missing archive, publication date or content hash is shown as null rather than inferred.",
     "The project-level evidence grade ranks the strongest source in the entry; it is not a truth score for every claim."
    ]
   }
  }
 ]
}