Kampala Traffic Control Centre (MODERATO)

Revision 2026-08-22-evidence-baseline · effective 2026-08-07

Current revision. This is the snapshot used by the live entity page.

unreviewed

Created the first structured Evidence Passport with 14 claims and 5 source dossiers.

sha256:7b889a9547d0036b8ad3fceae6986b350a534fb83e32c39e91029803905e507e

Change set

  • add /evidencePassport — Added claim-level evidence mapping and source dossiers.
  • add /revisionHistory — Established a permanent, hash-addressed baseline revision.
14
of 14 claims mapped
5
source dossiers
5
publication dates recorded
0
archives linked
0
exact locators
0
content captures hashed

Claims, one by one

The text below is copied verbatim from the published record. Each claim names the source dossiers that carry it; caveats stay attached to the claim they qualify.

Claim 1 clm-2b60ecd0b077652e descriptive
Japan (JICA)-funded
Published field
snippet · verbatim
Mapping
mapped · no interpretation or interpolation added by this passport
What the mapping says
KCCA's own 2022 press release announces the project as undertaken 'with support from the Japanese International Cooperation Agency (JICA)' — technical cooperation dating to 2015.
Caveat
No claim-specific caveat recorded

Sources carrying this claim

  1. KCCA — Traffic Control Center (authority)
Claim 2 clm-e4bd51c24695e6fe quantitative
roughly UGX 47bn
Published field
snippet · verbatim
Mapping
mapped · no interpretation or interpolation added by this passport
What the mapping says
Daily Monitor's coverage of the September 2025 commissioning states: 'The Shs47b project funded by the government of Japan saw the redesign of city junctions and establishment of more lanes, traffic lights and zebra crossings.'
Caveat
KCCA's own 2022 groundbreaking release quoted a different, higher estimate for the same project ('At least JPY 2.44 Billion approximately UGX 63 Billion'). This entry's UGX 47bn figure is the completion-stage cost reported at commissioning in 2025; no source explains why the figure changed between groundbreaking and completion.

Sources carrying this claim

  1. Daily Monitor (press)
Claim 3 clm-17298fc62b44b1bd descriptive
Traffic Control Centre at City Hall
Published field
snippet · verbatim
Mapping
mapped · no interpretation or interpolation added by this passport
What the mapping says
KCCA's own 2022 groundbreaking release describes 'the launch of the construction works for the Traffic Control Center at City Hall in Kampala.'
Caveat
No claim-specific caveat recorded

Sources carrying this claim

  1. KCCA — Traffic Control Center (authority)
Claim 4 clm-f4df93b9705723b3 quantitative
was commissioned on 3 September 2025
Published field
snippet · verbatim
Mapping
mapped · no interpretation or interpolation added by this passport
What the mapping says
The contractor OC Global states: 'On September 3, 2025, the Completion Ceremony was held for the Project for the Improvement of Traffic Control in Kampala City.' Daily Monitor independently confirms the facility 'was officially opened on September 3, 2025.'
Caveat
No claim-specific caveat recorded

Sources carrying this claim

  1. OC Global (contractor)
  2. Daily Monitor (press)
Claim 5 clm-91a0ec18798ace42 descriptive
the first of its kind in East Africa, according to KCCA
Published field
snippet · verbatim
Mapping
mapped · no interpretation or interpolation added by this passport
What the mapping says
KCCA's own press release states the project 'will make Kampala the first city in East Africa to have such a smart facility,' quoting JICA's Chief Representative that 'the Traffic control center is the first of its kind in the region.' Daily Monitor separately reports it as 'the first of its kind in East Africa, according to KCCA officials.'
Caveat
No claim-specific caveat recorded

Sources carrying this claim

  1. KCCA — Traffic Control Center (authority)
  2. Daily Monitor (press)
Claim 6 clm-01a43364f676ecb6 quantitative
monitors and retimes signals at 30 major intersections
Published field
snippet · verbatim
Mapping
mapped · no interpretation or interpolation added by this passport
What the mapping says
Daily Monitor reports '30 key intersections equipped with AI-led traffic lights' under the project, with '256 total traffic signals installed across these junctions.'
Caveat
This 30-intersection figure comes only from this press account. KCCA's own materials and the project contractor consistently cite 27 junctions signalised under the JICA project — no source reconciles the two counts or explains what the extra intersections are.

Sources carrying this claim

  1. Daily Monitor (press)
Claim 7 clm-4d96a25eddf175e0 quantitative
adaptive control at the 27 junctions signalised under the JICA project running Japan's MODERATO system
Published field
snippet · verbatim
Mapping
mapped · no interpretation or interpolation added by this passport
What the mapping says
KCCA's own 2022 press release states the project 'proposes a Japanese Traffic Control System named MODERATO' and 'will also lead to signalization of up to 27 junctions.' The contractor OC Global independently confirms 'the installation and improvement of traffic signals at 27 intersections' and 'the introduction of Japan's traffic control system MODERATO.'
Caveat
No source explicitly states that these 27 JICA-signalised junctions are a defined subset of the 30 intersections Daily Monitor separately describes as under the control centre's monitoring. This entry's framing of '30 monitored, 27 with adaptive control' reconciles two differently reported totals rather than restating a distinction any single source draws itself.

Sources carrying this claim

  1. KCCA — Traffic Control Center (authority)
  2. OC Global (contractor)
Claim 8 clm-66b5aba9630295e7 descriptive
which adjusts green phases to real-time demand
Published field
snippet · verbatim
Mapping
mapped · no interpretation or interpolation added by this passport
What the mapping says
Daily Monitor describes MODERATO as AI technology that 'detect[s] activities on the roads and quickly take[s] action by releasing traffic on congested lanes.'
Caveat
The source describes the system functionally — detecting road activity and releasing congested traffic — rather than using the terms 'green phases' or 'real-time demand' verbatim; this entry's wording paraphrases an adaptive, demand-responsive signal-timing mechanism rather than quoting the source directly.

Sources carrying this claim

  1. Daily Monitor (press)
Claim 9 clm-be5bb44c9f14c058 quantitative
KCCA puts the citywide total at 59 signalised junctions out of a 200-plus-junction plan
Published field
snippet · verbatim
Mapping
mapped · no interpretation or interpolation added by this passport
What the mapping says
Nile Post reports KCCA Deputy Executive Director Kigenyi Benon's account of '59 junctions fully signalised out of more than 200 targeted junctions.'
Caveat
No claim-specific caveat recorded

Sources carrying this claim

  1. Nile Post — KCCA completes signalisation of 59 junctions (press)
Claim 10 clm-74f33d2b4762c405 quantitative
22 more slated for 2026
Published field
snippet · verbatim
Mapping
mapped · no interpretation or interpolation added by this passport
What the mapping says
KCCA's own December 2025 wrap-up states the authority will 'signalize 22 additional junctions' in 2026.
Caveat
No claim-specific caveat recorded

Sources carrying this claim

  1. KCCA — 2025 wrap-up, agenda for 2026 (authority)
Claim 11 clm-fb0ce5448d3b1723 quantitative
Vandalism of signal equipment and a motorcycle fleet that grew from roughly 150,000 in 2010 to about 1.35 million in 2022 are undermining the rollout
Published field
snippet · verbatim
Mapping
mapped · no interpretation or interpolation added by this passport
What the mapping says
Nile Post quotes KCCA Deputy ED Kigenyi Benon: 'Vandalism in the areas of Kololo and jinja road and irresponsible riding by some motorcycle operators are a big hindrance,' and separately states: 'Motorcycles rose from ~150,000 units in 2010 to ~1,350,000 units in 2022, with growth accelerating since 2015.'
Caveat
The source's own figures do not state whether the 2022 total of about 1.35 million motorcycles refers to Kampala city or to Uganda as a whole. Other reporting on Uganda's boda-boda sector puts roughly 150,000 machines in Kampala around 2010, growing to a national total in the range of about one million by the early 2020s, with a smaller share — commonly cited around 750,000 — operating specifically within the Kampala metropolitan area. The 1.35 million figure paired here with a Kampala-era 2010 baseline may therefore be a national rather than a city count.

Sources carrying this claim

  1. Nile Post — KCCA completes signalisation of 59 junctions (press)
Claim 12 clm-1f0f42b4429f8db5 quantitative
the licence-plate cameras meant to support enforcement were still in procurement as of 2026
Published field
snippet · verbatim
Mapping
mapped · no interpretation or interpolation added by this passport
What the mapping says
Nile Post reports that KCCA is 'installing cameras capable of capturing boda-boda number plates so offenders can be identified and brought to book,' and states the authority 'plans to begin phased camera installation at key junctions and busy corridors once procurement and technical preparations are finalised' — indicating the licence-plate cameras had not yet been procured.
Caveat
This Nile Post article is dated 9 August 2025; no source in this entry's list confirms the procurement status specifically 'as of 2026.' The entry extends an August-2025 finding forward to 2026 without a dated source for that later point.

Sources carrying this claim

  1. Nile Post — KCCA completes signalisation of 59 junctions (press)
Claim 13 clm-35d0d13c8a4f21b4 descriptive
within months of commissioning, KCCA's own reported obstacles were vandalised signals and the sheer growth of the boda-boda fleet
Published field
lesson · verbatim
Mapping
mapped · no interpretation or interpolation added by this passport
What the mapping says
Nile Post quotes KCCA Deputy Executive Director Kigenyi Benon naming vandalism and motorcycle-related disorder as hindrances to the signalisation rollout.
Caveat
This Nile Post source is dated 9 August 2025 — about three and a half weeks BEFORE the 3 September 2025 commissioning ceremony described elsewhere in this entry, not after it. The obstacles it reports were documented ahead of, not 'within months of,' commissioning; this entry's framing implies a post-commissioning timeline that the cited source does not support.

Sources carrying this claim

  1. Nile Post — KCCA completes signalisation of 59 junctions (press)
Claim 14 clm-0a7aebb5c3afce25 descriptive
the enforcement cameras remained unprocured
Published field
lesson · verbatim
Mapping
mapped · no interpretation or interpolation added by this passport
What the mapping says
Nile Post reports that the licence-plate cameras await finalised procurement before phased installation begins.
Caveat
Same limitation as the equivalent snippet claim: the source is dated August 2025, and no later-dated source in this entry confirms the cameras 'remained' unprocured at a subsequent point.

Sources carrying this claim

  1. Nile Post — KCCA completes signalisation of 59 junctions (press)

Source dossiers and revision state

This layer records what is known about each source, what is still missing, and the exact snapshot this page is rendering. A missing date, archive or hash stays visible as missing.

unreviewed Revision 2026-08-22-evidence-baseline effective 2026-08-07 · created 2026-08-22

Awaiting operator and domain-expert review; publication of this revision implies neither.

sha256:7b889a9547d0036b8ad3fceae6986b350a534fb83e32c39e91029803905e507e
14
of 14 claims mapped
5
source dossiers
5
publication dates recorded
0
archives linked
0
exact locators
0
content captures hashed

Governance facts carried by the record

Operator
Kampala Capital City Authority (KCCA)
Actor types
city-government
Funding model
grant
Funding description
Japan (JICA)
Cost
≈UGX 47bn
Ownership
Not recorded
Decision rights
Not recorded
Exit conditions
Not recorded

5 source dossiers

KCCA — Traffic Control Center (authority) kcca.go.ug · 4 linked claims

Open original source ↗

Stable source ID
src-c4df0768c0455fd2
Publisher
Name not classified · kcca.go.ug
Type / language
web-page · language not classified
Published
2022-11-08
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-08-07
Dossier created
2026-08-22
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

Project framing: JICA technical cooperation since 2015, MODERATO, signalisation of up to 27 junctions, five roundabouts removed.

Descriptive only — not page/paragraph exact
Daily Monitor (press) monitor.co.ug · 5 linked claims

Open original source ↗

Stable source ID
src-f0f721ef5ff0dfe4
Publisher
Name not classified · monitor.co.ug
Type / language
web-page · language not classified
Published
2025-09-04
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-08-07
Dossier created
2026-08-22
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

AI-led MODERATO control, travel-time goal; independent press coverage of the launch.

Descriptive only — not page/paragraph exact
OC Global (contractor) ocglobal.jp · 2 linked claims

Open original source ↗

Stable source ID
src-48dce3a4d2e3295b
Publisher
Name not classified · ocglobal.jp
Type / language
web-page · language not classified
Published
2025-09-17
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-08-07
Dossier created
2026-08-22
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

Completion ceremony 3 Sept 2025; 'installation and improvement of traffic signals at 27 intersections'; MODERATO introduction. Contractor-side confirmation of dates and scope.

Descriptive only — not page/paragraph exact
KCCA — 2025 wrap-up, agenda for 2026 (authority) kcca.go.ug · 1 linked claim

Open original source ↗

Stable source ID
src-5ed76d3e102492ad
Publisher
Name not classified · kcca.go.ug
Type / language
web-page · language not classified
Published
2025-12-23
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-08-07
Dossier created
2026-08-22
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

27 junctions signalised in 2025; 22 additional junctions planned for 2026; strategic travel-time target.

Descriptive only — not page/paragraph exact
Nile Post — KCCA completes signalisation of 59 junctions (press) nilepost.co.ug · 5 linked claims

Open original source ↗

Stable source ID
src-196d2571575a2985
Publisher
Name not classified · nilepost.co.ug
Type / language
web-page · language not classified
Published
2025-08-09
Updated
Not recorded
Source last checked
No source-level check date
Record last verified
2026-08-07
Dossier created
2026-08-22
Retrieved copy
No local capture recorded
Archive
No archived copy linked
Content hash
No captured content hash
Locator
Open the recorded source note

59 of 200+ junctions signalised (Deputy ED Kigenyi Benon); vandalism in Kololo/Jinja Road and motorcycle growth (~150,000 in 2010 to ~1,350,000 in 2022) undermine traffic management; ANPR cameras linked to the control centre planned, procurement not finalised. Site returns 403 to automated fetch; content verified via two independent search snapshots.

Descriptive only — not page/paragraph exact
Known limits of this passport
  • Publisher names and source languages have not yet been classified; domains are recorded without guessing.
  • Existing source notes are descriptive locators, not page- or paragraph-exact citations.
  • A missing archive, publication date or content hash is shown as null rather than inferred.
  • The project-level evidence grade ranks the strongest source in the entry; it is not a truth score for every claim.