Kampala Traffic Control Centre (MODERATO)
This overview was generated with AI from the public sources listed below and checked against them before publication. It has not had a complete human fact-check — treat it as a starting point and follow the sources.
How this atlas is made · What “last verified” means · What “source-checked” means · The full record behind this page
Japan (JICA)-funded, KCCA's roughly UGX 47bn Traffic Control Centre at City Hall was commissioned on 3 September 2025 — the first of its kind in East Africa, according to KCCA. It monitors and retimes signals at 30 major intersections, with adaptive control at the 27 junctions signalised under the JICA project running Japan's MODERATO system, which adjusts green phases to real-time demand; KCCA puts the citywide total at 59 signalised junctions out of a 200-plus-junction plan, with 22 more slated for 2026. Vandalism of signal equipment and a motorcycle fleet that grew from roughly 150,000 in 2010 to about 1.35 million in 2022 are undermining the rollout, and the licence-plate cameras meant to support enforcement were still in procurement as of 2026.
what does this mean?
The strongest source is the operator's or the city's own reporting — an official report, dataset or press release. It grades who did the looking — not how well the project went. All four grades →🎓 Lesson
A control centre is only as strong as the street it faces: within months of commissioning, KCCA's own reported obstacles were vandalised signals and the sheer growth of the boda-boda fleet — while the enforcement cameras remained unprocured.
Sources
📅 How old is the evidence?
Two clocks, kept apart: when this entry’s sources were published, and what has happened to its record in the atlas. Documented span: 2022–2025. 5 of 5 sources carry a publication date, from 8 November 2022 to 23 December 2025.
When the sources were published
- Kampala Capital City Authority (KCCA) · city governmentKCCA — Traffic Control Center (authority)
- Nile Post · pressNile Post — KCCA completes signalisation of 59 junctions (press)
- Daily Monitor · pressDaily Monitor (press)
- OC Global (Oriental Consultants Global) · vendorOC Global (contractor)
- Kampala Capital City Authority (KCCA) · city governmentKCCA — 2025 wrap-up, agenda for 2026 (authority)
Show your work What this page rests on and what it can’t tell you · all 14 claims with their sources · the forensic record
Evidence Passport · public beta 14 addressable claims, 5 source dossiers, one permanent baseline. The passport is unreviewed — an AI-assisted structural migration, not a human or expert endorsement. Every revision keeps a permanent copy under revision history.
Inspect the claims, one by one — verbatim text, sources and caveats for all 14
The text below is copied verbatim from the published record. Each claim names the source dossiers that carry it; caveats stay attached to the claim they qualify.
clm-2b60ecd0b077652e
descriptive
Japan (JICA)-funded
Sources carrying this claim
clm-e4bd51c24695e6fe
quantitative
roughly UGX 47bn
Sources carrying this claim
clm-17298fc62b44b1bd
descriptive
Traffic Control Centre at City Hall
Sources carrying this claim
clm-f4df93b9705723b3
quantitative
was commissioned on 3 September 2025
Sources carrying this claim
clm-91a0ec18798ace42
descriptive
the first of its kind in East Africa, according to KCCA
Sources carrying this claim
clm-01a43364f676ecb6
quantitative
monitors and retimes signals at 30 major intersections
Sources carrying this claim
clm-4d96a25eddf175e0
quantitative
adaptive control at the 27 junctions signalised under the JICA project running Japan's MODERATO system
Sources carrying this claim
clm-66b5aba9630295e7
descriptive
which adjusts green phases to real-time demand
Sources carrying this claim
clm-be5bb44c9f14c058
quantitative
KCCA puts the citywide total at 59 signalised junctions out of a 200-plus-junction plan
Sources carrying this claim
clm-74f33d2b4762c405
quantitative
22 more slated for 2026
Sources carrying this claim
clm-fb0ce5448d3b1723
quantitative
Vandalism of signal equipment and a motorcycle fleet that grew from roughly 150,000 in 2010 to about 1.35 million in 2022 are undermining the rollout
Sources carrying this claim
clm-1f0f42b4429f8db5
quantitative
the licence-plate cameras meant to support enforcement were still in procurement as of 2026
Sources carrying this claim
clm-35d0d13c8a4f21b4
descriptive
within months of commissioning, KCCA's own reported obstacles were vandalised signals and the sheer growth of the boda-boda fleet
Sources carrying this claim
clm-0a7aebb5c3afce25
descriptive
the enforcement cameras remained unprocured
Sources carrying this claim
Forensic record — source dossiers, gaps, hashes and the exact revision this page renders
This layer records what is known about each source, what is still missing, and the exact snapshot this page is rendering. A missing date, archive or hash stays visible as missing.
Awaiting operator and domain-expert review; publication of this revision implies neither.
sha256:7b889a9547d0036b8ad3fceae6986b350a534fb83e32c39e91029803905e507e
- 14
- of 14 claims mapped
- 5
- source dossiers
- 5
- publication dates recorded
- 0
- archives linked
- 0
- exact locators
- 0
- content captures hashed
Governance facts carried by the record
- Operator
- Kampala Capital City Authority (KCCA)
- Actor types
- city-government
- Funding model
- grant
- Funding description
- Japan (JICA)
- Cost
- ≈UGX 47bn
- Ownership
- Not recorded
- Decision rights
- Not recorded
- Exit conditions
- Not recorded
5 source dossiers
KCCA — Traffic Control Center (authority)
- Stable source ID
src-c4df0768c0455fd2- Publisher
- Name not classified · kcca.go.ug
- Type / language
- web-page · language not classified
- Published
- 2022-11-08
- Updated
- Not recorded
- Source last checked
- No source-level check date
- Record last verified
- 2026-08-07
- Dossier created
- 2026-08-22
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
- Descriptive only — not page/paragraph exact
Open the recorded source note
Project framing: JICA technical cooperation since 2015, MODERATO, signalisation of up to 27 junctions, five roundabouts removed.
Daily Monitor (press)
- Stable source ID
src-f0f721ef5ff0dfe4- Publisher
- Name not classified · monitor.co.ug
- Type / language
- web-page · language not classified
- Published
- 2025-09-04
- Updated
- Not recorded
- Source last checked
- No source-level check date
- Record last verified
- 2026-08-07
- Dossier created
- 2026-08-22
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
- Descriptive only — not page/paragraph exact
Open the recorded source note
AI-led MODERATO control, travel-time goal; independent press coverage of the launch.
OC Global (contractor)
- Stable source ID
src-48dce3a4d2e3295b- Publisher
- Name not classified · ocglobal.jp
- Type / language
- web-page · language not classified
- Published
- 2025-09-17
- Updated
- Not recorded
- Source last checked
- No source-level check date
- Record last verified
- 2026-08-07
- Dossier created
- 2026-08-22
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
- Descriptive only — not page/paragraph exact
Open the recorded source note
Completion ceremony 3 Sept 2025; 'installation and improvement of traffic signals at 27 intersections'; MODERATO introduction. Contractor-side confirmation of dates and scope.
- Claims linked
KCCA — 2025 wrap-up, agenda for 2026 (authority)
- Stable source ID
src-5ed76d3e102492ad- Publisher
- Name not classified · kcca.go.ug
- Type / language
- web-page · language not classified
- Published
- 2025-12-23
- Updated
- Not recorded
- Source last checked
- No source-level check date
- Record last verified
- 2026-08-07
- Dossier created
- 2026-08-22
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
- Descriptive only — not page/paragraph exact
Open the recorded source note
27 junctions signalised in 2025; 22 additional junctions planned for 2026; strategic travel-time target.
- Claims linked
Nile Post — KCCA completes signalisation of 59 junctions (press)
- Stable source ID
src-196d2571575a2985- Publisher
- Name not classified · nilepost.co.ug
- Type / language
- web-page · language not classified
- Published
- 2025-08-09
- Updated
- Not recorded
- Source last checked
- No source-level check date
- Record last verified
- 2026-08-07
- Dossier created
- 2026-08-22
- Retrieved copy
- No local capture recorded
- Archive
- No archived copy linked
- Content hash
- No captured content hash
- Locator
- Descriptive only — not page/paragraph exact
Open the recorded source note
59 of 200+ junctions signalised (Deputy ED Kigenyi Benon); vandalism in Kololo/Jinja Road and motorcycle growth (~150,000 in 2010 to ~1,350,000 in 2022) undermine traffic management; ANPR cameras linked to the control centre planned, procurement not finalised. Site returns 403 to automated fetch; content verified via two independent search snapshots.
Known limits of this passport
- Publisher names and source languages have not yet been classified; domains are recorded without guessing.
- Existing source notes are descriptive locators, not page- or paragraph-exact citations.
- A missing archive, publication date or content hash is shown as null rather than inferred.
- The project-level evidence grade ranks the strongest source in the entry; it is not a truth score for every claim.
Continue exploring
Compare this project
Explore the wider context
📎 Cite this project
1001 Smart Cities (2026). “Kampala Traffic Control Centre (MODERATO)” — Kampala, Uganda. The Smart City Atlas. https://1001smartcities.org/projects/kampala-traffic-control/ (last verified 2026-08-07). Data: CC BY 4.0.
The underlying data is free to reuse with attribution — see the open data page.
