Central Valley Centralized Traffic Control Upgrade
San Jose's centralised traffic-signal system launched with 325 intersections in November 2007 under MOPT and contractor Semex, and has grown into a 474-signal network spanning San Jose, Alajuela, Heredia and Cartago, all watched from one Traffic Control Center and mostly converted to solar power by 2019 -- though a lapsed maintenance contract left its electronics unrepaired for two years afterward.
🎓 Lesson
A complete, working signal network can still degrade quietly once its maintenance contract lapses: Costa Rica's traffic engineers went two years without electronics support before a new contract restored it.
📖 Terms in this entry: ANPR (automatic number-plate recognition) · Adaptive traffic signals · CBTC (communications-based train control)
Sources
This overview was generated with AI from the public sources listed above and checked against them before publication. It has not had a complete human fact-check — treat it as a starting point and follow the sources.
Continue exploring
Compare this project
Explore the wider context
📎 Cite this project
1001 Smart Cities (2026). “Central Valley Centralized Traffic Control Upgrade” — San José, Costa Rica. The Smart City Atlas. https://1001smartcities.org/projects/san-jose-smart-traffic/ (last verified 2026-08-02). Data: CC BY 4.0.
The underlying data is free to reuse with attribution — see the open data page.
